ML20217K356

From kanterella
Jump to navigation Jump to search
EN-97-092:on 971003,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Failure to Comply W/Tech Specs
ML20217K356
Person / Time
Site: Braidwood  
Issue date: 09/30/1997
From: Beverly Clayton, James Heller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
EA-97-265, EN-97-092, EN-97-92, NUDOCS 9710240313
Download: ML20217K356 (1)


Text

_ _ - - _ - _ -

September 30,1997 EN 97-092 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

Commonwealth Edison Company (EA 97 265)

Braidwood Station Docket Nos. 50-456 and 50-457 Sublect: PROPOSED IMPOSITION OF CIVIL PENAliY - $55,000 This is to inform the Commission that a Notice of Violation and Proposed imposition of Civil Penalty in the amount of $55,000 will be issued on or about October 3,1997 to the Commonwealth Edison Company. This action is based on a Severity Level lli violation involving the failure to comply with technical specifications. Specifically, the centrifugal charging system pump casings and discharge piping high points were not vented at least once every 31 days as required by technical specifications.

Because this was not the first escalated aforcement action within the past 2 years, the staff considered whether credit was warrante:' ';or identification and corrective action. Credit was

- not warranted for identification because the violation was identified by the NRC. Credit was warranted for corrective action because the corrective actions were considered prompt and comprehensive.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule ofissuance and notification is:

l Malling of Notice October 3,1997 Telephone Notification of Licensee October 3,1997 The State of Illinois will be notified.

The licensee has thirty days from the date of the Notice in which to respond. Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.

Contacts: Jim Heller Rlll EICS, 630/810-4374 Brent Clayton Rlll-EICS, 630/810 4373 Distribution OWFN OWFN TWFN Regional Offices Chairman Jackson EDO OC RI RIV Comm. Dieus DEDE AEOD Ril WCFO Comm. Diaz OE OP CTR Rill Comm. McGaffigan OGC NMSS SECY NRR 1RM MAIL OCA 01 OlG NUDOCS PA SP RES-PUBLIC IP ACRS

\\g[Q PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION b

97102403:3 970930 EN 97 2

PDR