ML20217K317

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to NFS-0145, Hope Creek Generating Station Colr,Cycle 7/Reload 6
ML20217K317
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/17/1997
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K321 List:
References
LR-N97679, NUDOCS 9710240257
Download: ML20217K317 (3)


Text

_ ______ _ __ _ ____ ___ - _ _ _ _ _ _

e*-

  • l .-

( Pubbe Service Electric and Gas s , . Corvany E. C. Simpson Pubbe Service Etoctnc and Gas Company PO Box 236, Hancocks Bodge, NJ 08038 0 6 339 1700 sew v.ce nevoert mca m Enuwems f

i OCT 171997 LR-N97679 United States Nuclear Regulatory Commission Document Control Desk Washington,-DC .20555 CORE OPERATING LIMITS REPORT, NFS-0145, REV. 3 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 Gentlemen:

In accordance with Technical Specification 6.9.1.9, Public Service Electric and Gas (PSE&G) hereby transmits the Hope Creek Generating Station Cycle 7/ Reload 6 Core Operating Limits Report, NFS-0145, Revision 3. Revision 0 was previously submitted on March 15, 1996, and Revisions 1 and 2 were submitted on August 26, 1997. The specific core operating limits contained in NFS-0145_were established such that all applicable limits of the plant safety analysis continue to be met.

Appendices A and B of NFS-0090, Revision 0, submitted on April 26, 1994, consisted of reprinted proprietary information from the following two General Electric (GE) reports:

General Electric Report 23A6526AA, Revision 0, " Supplemental Reload Licensing Submittal for HCGS Reload 3, Cycle 4," dated January, 1991.

General Electric Report 23A76251296AA, Revision 0, " Lattice-Dependent MAPLHGR Report for HCGS Reload 5, Cycle 6," dated October, 1993.

The proprietary information in the above previously provided GE reports is contained in Appendices A, B, and C of this report.

Therefore, based upon verbal requests by the NRC to not submit duplicative proprietary material that requires treatment under 10CFR2.790, the last 9 pages of NFS-0145, consisting of the Appendices, are not being enclosed.

.s p; oe> . 1 4CC lilllllllllllll!!!jl0llllll 9710240257 971017' PDP ADOCK 05000354 P PDR,

Document Control Desk OCT 171997 LR7N97679 Should you have any questions or comments on this transmittal, do not hesitate to contact us.

Sincerely, 9

i Affidavit Attachment (1)

C Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Jaffe, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Morris USNRC Senior Resident Inspector (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering j 33 Arctic Parkway CN 415 Trenton, NJ 08625 95-4933

.)

e ** O j

l a .

REF: LR-N97679 STATE OF NEW JERSEY )

) SS, COUNTY OF SALEM )

E. C. Simpson, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning Hope Creek Generating Station, Unit 1, are true to the best of my knowledge, information and belief.

y subscribe and Swor to before me this /7 day of _ N/211 , 1997

< L d m hotaryPubIicofNehTersey KIMBERLY JO BROWN NOT ARY PU8 tlc OF NEW JERSEY My Cu mission expires on l

j