Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216D653 + (ML20216D653)
- ML20216D655 + (ML20216D655)
- ML20216D656 + (ML20216D656)
- ML20216D657 + (ML20216D657)
- ML20216D658 + (ML20216D658)
- ML20216D660 + (ML20216D660)
- ML20216D661 + (ML20216D661)
- ML20216D664 + (ML20216D664)
- ML20216D665 + (ML20216D665)
- ML20216D666 + (ML20216D666)
- IR 05000443/1999004 + (ML20216D668)
- ML20216D669 + (ML20216D669)
- ML20216D670 + (ML20216D670)
- ML20216D672 + (ML20216D672)
- ML20216D673 + (ML20216D673)
- IR 05000443/1999006 + (ML20216D675)
- NSD-NRC-98-5604, Transmits Results of Sensitivity Study Performed by W to Quantify Conservatism in AP600 Containment Evaluation Model When Applied to Lst Facility + (ML20216D676)
- 3F0498-24, Provides Notification That Due Date for NRC Commitment Being Extended.Fpc Identified Scheduled Completion Date of 980415, for Action.Fpc Will Revise Electrical Design Criteria for CR-3 + (ML20216D677)
- ML20216D679 + (ML20216D679)
- 05000369/LER-1998-002, Forwards LER 98-002-00,concerning Reactor Trip at McGuire Unit 1,per 10CFR50.73(a)(2)(iv)(A) + (ML20216D680)
- ML20216D681 + (ML20216D681)
- 3F0498-23, Provides Notification That Due Date for NRC Commitment Being Extended.Emergency Action Levels for Submittal to NRC Was 980430.FPC Will Complete NUMARC EALs for Submittal to NRC by 980729 + (ML20216D682)
- ML20216D683 + (ML20216D683)
- ML20216D685 + (ML20216D685)
- ML20216D687 + (ML20216D687)
- ML20216D688 + (ML20216D688)
- ML20216D689 + (ML20216D689)
- ML20216D690 + (ML20216D690)
- ML20216D692 + (ML20216D692)
- ML20216D693 + (ML20216D693)
- ML20216D694 + (ML20216D694)
- ML20216D695 + (ML20216D695)
- ML20216D696 + (ML20216D696)
- ML20216D697 + (ML20216D697)
- ML20216D699 + (ML20216D699)
- NPL-98-0252, Forwards MOR for Mar 1998 for Point Beach Nuclear Plant, Units 1 & 2 & Revised Corrected MOR for Feb 1998 + (ML20216D700)
- ML20216D702 + (ML20216D702)
- ML20216D704 + (ML20216D704)
- ML20216D706 + (ML20216D706)
- ML20216D707 + (ML20216D707)
- ST-HL-AE-5722, Submits Response to Request for Addl Info Re Revised Main Steam Line Break Analysis + (ML20216D708)
- ML20216D709 + (ML20216D709)
- ML20216D710 + (ML20216D710)
- ML20216D711 + (ML20216D711)
- ML20216D712 + (ML20216D712)
- 05000369/LER-1998-002-01, :on 980209,manual RT Following Fuse Failure in Rod Control Sys Was Noted.Caused by Intermittent Loss of Power to Rod Control Gripper Mechanism.Fuse Holder Was Replaced + (ML20216D713)
- B17835, Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1) + (ML20216D714)
- ML20216D715 + (ML20216D715)
- NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports + (ML20216D717)
- ML20216D718 + (ML20216D718)
- ML20216D721 + (ML20216D721)