g AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDM(ki/M'DillCA110N NO.
3. ifftCilVt DATE
4. Rf 0Vist110N/PURCHA%( kl0. NO.
5. PROJf 1 N.

J

[c77$7 Two (2)

SEP 0 4 W RFrA dated 6n4/97 l

6. "I5$UID BY CODL~

~

7. ADMINi$1tR!D BY CODE 1 l

(if other than item 6)

8. NAME AND ADDRi$$ Of CON 1RAC104 (No., street, county, $ tate and ZIP code) 9A. AMENDMINI OF $0LICllAll0N No.

$clentech, Inc.

910 Clopper Road Celthersburg, MD 20878 M. DA RD ($ U I M M H )

technical

Contact:

Leonard W. Ward telephones (301) 258 2596 10A. M@lflCA110N Of CON 11tAtt/ORDtR NO.

X NRC0496060 108. DAlt0 ($EE litM 13) 00 tit i F Atllliv Cmt

11. THl$ litM ONLY APPLIES TO AMENDMENTS OF $0LICITA110N$

0 The above r=bered solicitation is amended as set forth in item 14 The hour and date specified for receipt of Offers O is extended, is not estended. Ot terors sust acknowlede, receipt of this amenement f or to the hour and date specified in the 60 citation or as amended ty one of the following methods (a) By complett items 8 and 15, and returning cop es of the amenenent; (b By acknowledging receipt of this amenenent on eac copy of the af ter stAsnittedl6 be (c) By separate letter or te egram which includes a reference to the solicitation and amenenent numbers. FAILUR OF YOUR ACKNOWLEDGM(NI 10 Bf RECEIVED AT THE PLACE Ot$1GNA1[D l0R THE RECEIPI 0F OFFERS PPIOR 10 THE HOUR AND DATL $PECIFl[D MAY R($ ULT IN REJECil04 0F YOUR OFFER. If by virtue of this amenenent you desire to change an offer already sulsnitted such change may be made by telegram or l tter, provided each telegram or letter makes rGference to the solicitation and this amenenent, and is received pr{.or to the opening hour and date specified.

12. AICOUN1]NG AND APPROPRIAll0N DATA (if required)

B&R 76015115005 JCN W6667 BOC: ?52A AFPW: 31x0?00.760 Obligate $79,794

13. THit 11EM APPLIIS ONLY 10 M00lFICAfl0N$ OF CONTRACTS / ORDERS, li MODIFl[$ THE CONTRACT / ORDER No. As DESCRIBED IN IILM 14 A.1Hil CHANGE ORDER l$ l&$UED FutSUANI 10: ($pecify authority) THE CHANGl$ Sti f 0RTH IN ITEM 14 Akt MADE IN THE CONIRACT ORDER NO. IN litM 10A.

B. THE ABOVE NUMB (RLD CONTRACf/ ORDER 15 MODif tlD 10 ktFLtC1 THE ADMINi$1RAllVE CHANGE $ (such as changes in paying office, appropriation data, etc.) $ET IORTH IN lifM 14, PUR$UANT TO THE AUTHORl1Y OF FAR 43.1U3(b).

C. THi$ $UPPLEMENIAL AGREEM(NT l$ [NilRfD IN10 PUR$UANT 10 AUTHORilY OF:

D. OTHtt ($pecif y type of modification and authority) bilateral 52.243 2 & autual agreement of the parties.

E. IMPORTANit Contractor O is not, @ le required to sign this doctanent and return 2 copies to the issuing office.

14. DESCRIP110N OF AM(NDMENT/MODIFICAll0N (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)

i See pages 2-3 for description of modification.

l lllH l@t Hll 0

,0074 tacept as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretof ore

_ changed remains unchanged and in f ull f orce and ef f ect.

a IS h. N M

"* W " M"9 ' C "'/* C'iM f fic" Co Mananar

-168. UN11tD.$1Aff$

AMER W /A 16C. DATE $1GNED a

/

158. C FN1RfCTOR/

15C. ATE $1CNED b

OUW- <. l kW/ /g'!

O AAww id(

fgy BY.

(signature of iers thorized to sign) k I

(SignatureJef Contractl6g Of ficer)

NSN 7540-01-15218070 30-105

[

STANDARD FORM' 30 (REV.10 83)

PREVIOUS EDlil0N UNUSABLE Prescribed by GSA 9709090400 970904 PDR CONTR NRC-04-96-060 PDR

i Contract No, NRC-04 96-060 I

Modification No, 2 Pape 2 of 3 The purpose of this modification is to (1) increase the ceiling of the contract by $70,794 from 5528,503 to $608,297 to accommodate a within scope change for inclusion of Subtasks 2.4.1 and SC(i) and optional subtasks SC(ii) through SC(vi) in accordance with the attached statement of work and the Contractor's technical proposal dated August 13,1997, hereby incorporated, and (2) provide incremental funding in the amount of $79,794; Accordingly,'the contract is modified as follows:

Under Section B.3, " Consideration and Obligation - Cost Plus Fixed Fee " paragraphs a, e, and i are deleted in their entirety and replaced with the following in lieu thereof.

"a.

The total estimated cost to the Goveran ent for full performance of this coyact a

is $608,297.00 of which the sum of $568,608.00 represents the estimated reimbursable costs and of which $39,689.00 represents the fixed fee.

e.

The amount presently obligated by the Goverriment with respect to this contract is 5608,297.00 f.

It is estimated that the amount currently allotted will cover performance through, September 22,1997."

Under Section B.3, " Consideration and Obligation - Cost Plus Fixed Fee," paragraph c is revised to include the following optional subtasks:

  • Qotional Subtasks Reimbursable Costs Fixed Fee Total Est. Cost Optional Subtask SC(ii) A

$46,944.00

$3.280.00 550,224,00 Optional Subtask SC(ii) B1 534,197.00

$2,389.00 536.586.00 Optional Subtask SC(ii) B2

$91,319.00 51,489.00

$22,808.00 4

Optional Subtask SC(ii) B3 555,348.00 S3,867.00 559,215.00 Optional Subtask SC(iii)

$33,909.00

$2,364.00 S36,273.00 Optional Subtask SC(iv)

$23,132.00

$1,013.00

$24,745.00 Optional Subtask SC(v)

$18,339.00

$1.279 00

$19.618.00 Optional Subtask SC(vi) 521,366.00 51,493.00 522.859.00" Section C, " Statement of Work"is revised to add the effort identified as Subtasks 2.4.1, SC(i),

and optional Subtasks SC(ii) through SC(vi) as set forth in the attachment to this modification.

7--- w--

-v-----

1 Contract No. NRC-04 96-0GO Modification No. 2 Page 3 of 3 Section C, " Statement of Work"is revised to add the effort identified as Subtasks 2.4.1, SC(i),

and optional Subtasks SC(ii) through SC(vi) as set forth in the attachment to this modification.

A summary of obligations for this contract, from award date through the date of this action, is given below:

Totat FY96 Obligations:

$100.000.00 Total FY97 Obligations:

508,297.00 l

i Cumulative tote' of

-y NRC obhgations:

$608,297.00 This modification obligates FY97 funds in the amount of $79,794.00 All other terms and conditions of this contract remain unchanged.

Attachment:

Statement of work

.c v

Revision 1 - Statement of Work for Modification No 2 Under NRC Contract No. NRC-04 96 060 l

l The objectives of this contract modification are to: (1) upgrade TRAC B to meet Scientech Quality Assurance (SOA) Standards by providing a wider range of code assessment cases, and (2) provide a preliminary assessment of the couphng of 3D neutronics with core thermal hydraulics and assist the NRC/RES during its participation in the OECD Main Steam Line Break (MSLB) Benchmark Exercise. The following tasks are incorporated into the statement of work under the subject contract.

Task 2 4.1 Upgrade TRAC B to SQA Standards 7

An effort to upgrade TRAC B to meet SQA standards is central to the TRAC B maintenance

)

effort, in this Task, additional code testing and assessment will be undertaken which will enable issuance of a code version that meets the minimum QA standards for software I

l development. The effort to upgrade TRAC B to SOA standards to be done under this FY97 contract modification will be to fully perform calculations and document the results using the standard test matrix and a judicious sampling of developmental assessment problems which are derived from the CSNI assessment matrix. The assessment performed under this effort is l

considered to be partial and is for the purpose of supplying a timely version of TRAC-B (version O.5) to be produced under the SQA Program.

(i)

Develop and obtain NRC approval of a list of candidate code assessment problerhs,

  • Estimated Effort: 0.5 staff month Estimated Completion Date: 1 month following initiation of this subtask (ii)

Obtain all applicable and available data, in electronic and paper format, from the various available sources of this information (e.g. NRC Data Bank, INEL QA files, etc.). For those cases where electronic data is unavailable, the paper format data is to be scanned into elf '.ronic format.

Estimated Effort: 0.5 staff month Estimated Completion Date: 1 month following initiation of this subtask (iii)

Perform and document the testing and developmental assessment in a report that describes the problem and/or facility and the test objective, evaluates and discusses the code performance for key parameters of interest, and identifies the capabilities and limitations / problems with recommendations for improvement or correction.

Estimated Effort: 4 staff months Estimated Completion Date: 6 months following contract modification approval

l ImMC Preliminary Assessment and Assistance The NRC is participating in the OECD MSLB Benchmark Exercise being organized by the Reactor Physics Committee of the OECD Nuclear Energy Agency (NEACRP) as well as the CSNI Principal Working Group 2 (PWG2). The international benchmark problem chosen for simulation is a Main Steam Line Break (MSLB), which may occur as a consequence of a rupture of a steam line at the steam generator nozzle. This event is characterized by significant space-time effects in the core caused by asymmetric cooling together with an assumed stuck-out rod during the reactor trip. The simulation of the transient requires evaluation of core response from a multi-dimensional perspective (coupled 3D neutronics with core thermal-hydraulics) supplemented by a 1D simuistion of the remainder of the reactor coolant systems.

l The purpose of this Task is to provide a preliminary assessment of the coupling of 3D t

  • neutronics with core thermal-hydraulics and provide assistance to the NRC di c.s its participation in the OECD MSLB Benchmark Exercise. The results of this task will also provide important initial information needed for performance of Optional Task 50, should this optional task be exercised.

Subtask SC(i)

Provide a Letter Report describing the major features of the most recent versions of the 3D kinetics codes NESTLE and PARCS. The Letter Report should include a discussion of the advantages and disadvantages of using either code coupled to TRACP (Version 5.4.25) with regard to the NRC participation in the OECD MSLB Benchmark Exercise. Within 30 days of receipt of the report, the NRC PO willidentify the kinetics code to be used in the remainirig '

optional subtasks should the NRC decide to exercise any of these optional subtasks.

Estimated Effort 0.25 staff-month Estimated Completion Date: 0.5 month following initiation of this subtask Optional Subtask SC(ii)

Dependinc on the NRC def...c on which kinetics code is to be coupled with TRACP (Vers 1 5.4.25), either install the most recent DOE version of TRAC-P/ NESTLE or proceed on to subtask (iii), become familiar with the coding, and reproduce the calculations summarized in the DOE reference materials.

Estimated Effort: 0.5 staff-month Estimated Completion Date: 1 month following approval of the kinetics code under subtask (i)

Optional Subtask SC(iii)

Depending on the NRC decision on which kinetics code will be used, either reconfigure the arrangement in subtask (ii) to that using TRAC-P version 5.4.25 and NESTLE version 5.02, or implement TRAC-P/PARCS, and reproduce the calculations summarized in the DOE reference materials.

w V

Estimated Effort: 0.5 staff-month Estimated Completion Date: 1 month following initiation of this subtask Optional Subtask SC(iv)

Assess the state of the transient solution methodology in the subtask (iii) version of the coupled '

code. This willinclude a detailed comparison of the source code and the transient neutronics equations as solved in the kinetics code, and identifying any needed corrections. Unless there is a valid justified reason for doing otherwise, the basic solution methodology (i.e. explicit internal coupling between TRACP and NESTLE /PARCS), should not be modified. Once the necessary corrections are identified and implemented, the neutronic part of the coupled code should be assessed using the standard EPRI HERMITE transient problem. A thorough documentation of this test case should be made.

Estimated Effort: 1.0 staff month Estimated Completion Date: 2 months foilowing initiation of this subtask Optional Subtask SC(v)

Further assess the coupled code using the NEACRP PWR spatial kinetics Benchmark problems. A thorough documentation of this test case will be made. Additionally, a thorough documentation of the changes made to the codes as well the issuance of a Users Manual, describing the kinetics code input as well as additional input required for TRACP, shall be undertaken.

)

Estimated Effort: 1.0 staff-month Estimated Completion Date: 2 months foPowing initiation of this subtask Optional Subtask SC(vi)

Provide assistance to the NRC during its performance of the OECD MSLB Benchmark Exercise. Up to 1 staff month Estimated Effort: 1.0 staff month Estimated Completion Date 12 months following contract modification approval