Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216D182 + (ML20216D182)
- ML20216D183 + (ML20216D183)
- ML20216D184 + (ML20216D184)
- ML20216D185 + (ML20216D185)
- ML20216D186 + (ML20216D186)
- NSD-NRC-97-5303, Forwards Westinghouse Responses to Requests for Addl Info Pertaining to AP600 Deterministic Calculations of core- Concrete Interactions + (ML20216D188)
- ML20216D190 + (ML20216D190)
- ML20216D191 + (ML20216D191)
- ML20216D193 + (ML20216D193)
- ML20216D194 + (ML20216D194)
- ML20216D195 + (ML20216D195)
- BSEP-97-0383, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-08 & 50-325/97-08.Corrective Actions:Disciplined Individuals Involved,Conducted Stand Down W/Operations Personnel & Revised Procedure 0O1-01.08 Re Log Book Reviews + (ML20216D196)
- ML20216D199 + (ML20216D199)
- ML20216D200 + (ML20216D200)
- NRC-97-0081, Suppls Response to Violations Noted in Insp Rept 50-341/97-05.Corrective Actions:Der 97-1045 Written to Document Corrective Actions Taken to Address Work Performed Outside Scope of Work Package + (ML20216D202)
- ML20216D203 + (ML20216D203)
- 05000254/LER-1997-019-01, :on 970808,TS 3.0.C Was Entered Because No LCO Was Available for Secondary Containment When Both Doors for Interlock Were Opened Simultaneously.Verified Proper Operation + (ML20216D206)
- ML20216D207 + (ML20216D207)
- ML20216D208 + (ML20216D208)
- ML20216D209 + (ML20216D209)
- ML20216D210 + (ML20216D210)
- ML20216D211 + (ML20216D211)
- ML20216D214 + (ML20216D214)
- ML20216D216 + (ML20216D216)
- ML20216D217 + (ML20216D217)
- ML20216D218 + (ML20216D218)
- ML20216D220 + (ML20216D220)
- ML20216D222 + (ML20216D222)
- ML20216D223 + (ML20216D223)
- NSD-NRC-97-5296, Forwards Draft RCS PIV Integrity Ts,For Review.W Status Open Item Tracking Sys Item 5527 Is Changed to Action N for NRC to Provide Feedback Re Acceptability of New TS + (ML20216D225)
- 05000368/LER-1998-001, Forwards LER 98-001-00,concerning Surveillance Testing of Containment Building Personnel & Escape Air Lock Door Interlocks + (ML20216D226)
- ML20216D227 + (ML20216D227)
- ML20216D231 + (ML20216D231)
- ML20216D232 + (ML20216D232)
- ML20216D233 + (ML20216D233)
- U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable + (ML20216D234)
- ML20216D235 + (ML20216D235)
- ML20216D237 + (ML20216D237)
- ML20216D238 + (ML20216D238)
- NSD-NRC-97-5304, Responds to RAI Re AP600 H Diffusion Flame Sensitivity & Importance Analyses + (ML20216D239)
- ML20216D241 + (ML20216D241)
- ML20216D242 + (ML20216D242)
- 05000368/LER-1998-001-02, :on 980309,surveillance Testing of Containment Bldg Personnel & Escape Air Lock Door Interlocks Did Not Verify Operability of Each Interlock Function.Caused by Inappropriate Interpretation.Revised Maint Task Documents + (ML20216D243)
- NSD-NRC-97-5297, Forwards Advance Markup of AP600 TS to Modify SR 3.6.9.1 & SR 3.6.9.2,consistent W/Nrc Example Provided in Question 68 & Consistent w/NUREG-1432 + (ML20216D244)
- ML20216D250 + (ML20216D250)
- ML20216D251 + (ML20216D251)
- ML20216D252 + (ML20216D252)
- ML20216D253 + (ML20216D253)
- 05000423/LER-1998-007-01, Forwards LER 98-007-01,documenting Condition That Was Orginally Determined at Millstone,Unit 3 on 980129.LER Being Submitted Pursuant to 10CFR50.73(a)(2)(i)(B).NNECO Commitments Contained within Attachment 1 to Ltr + (ML20216D256)
- ML20216D257 + (ML20216D257)
- IR 05000271/1997008 + (ML20216D259)