ML20216D216
| ML20216D216 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/29/1997 |
| From: | Pernal J NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| References | |
| SP-788.8, NUDOCS 9709090251 | |
| Download: ML20216D216 (7) | |
Text
a gm,,_,,
- NDS Document Transmittal #04306 SQ9A97 To:
Nuclear Regulatory Commission Addressee Unique # 140 Document Control Desk ROUTINE destrbution Washington, D.C. 29666 The following documents have been revised. You are currently on distribution for these documents. Verify that all documents are included in this distribution set.
DOCUMENT Egy COPIES SP 788.8 5
1 788.8-1 3
1 t) 9709090251 970829 PDR ADOCK 05000245' P
((l\\$lll}
!!! i,
Return tNs form to NDS, MP475. kd Floor, C/O Rick Lundin (x2446) as soon as receNed.
Signature Date; d
e f
k' /
MILLSTONE NUCLEAll POWEll STATION SUltVEILLANCE PROCEDUltE Fire Pump Diesel Engine 18-Month Surveillance SP 788.8 Rev.5 t.
?
b a
~
,; ; g r
y
' QTOP' HINK' MCT' EVIEW
/-
3
'l
/
/,
4 s.
i a,z p
3 g
y..
y
.c n
t.
x Approval:
5 Nd PORC Mtg. No:
/- 9'7' /3L/
Date:
c? ?9 - C/'7 Effective Date:
8-ac(_q7 be Level of Use SME: J. Perna' General
~..
J
{,
Millstone Unit 1 Suh'elllance Procedure Fire Pump Diesel Engine 18-Month Surveillance TABLE OF CONTENTS 4
1.
PURPOSE....................................................2 2.
P R E R E Q U I S I TES.............................................
2 3.
P RECAUTI O N S...............................................
2 4..
I NSTR U CTI O NS..............................................
3 5.
R EVI EW AN D S I G N - O FF,...................................
4 f
6.
R E FE R EN CES................................................
4 7.
S U M M A RY O F CH AN G ES....................................., 4 -
ATTACHMENTS AND FORMS Maint. Form 788.8-1, Fire Pump Diesel Engine 18-Month Surveillance
. O d
a i
i i.
"f a
a-t
(
~ [._, _ f._~ " 2 ACT ' ' REVIEW 41 se 788.8 Level of Use
_SMP'
'THINK 7
Rev.5 General e
yy yy yq g
) gg4 e
,m.--
+
MAc
- 1. PURPOS13 (A
._)
l.1 Objective The purpose of this procedure is to ensure that the fire pump diesel engine (local ID M7-7) is inspected at least once evely 18 months. The performance of this procedure satisfies the requirements stated in
" Millstone Unit 1 Technical Requirements Manual," OPS Form 273-7.2,
" Fire Protection Tbchnical Requirements," Section 4.1.A.i.g.3(a).
1.2 Applicablility Applicable to all operating modes.
- 2. PREREOUISITES 2.1 General
'l.1 Surveillance cover sheet, Maint. Form 788.8-1, has been signed and surveillance has been approved.
2.1.2 An AWO has been issued and approved by Unit 1 Operations Department for inspection as necessary.
\\')
2.2 Documents 2.2.1 MP 744.1," Fire Pump Diesel Engine Inspection"
- 3. EBECAUTIONS
]
3.1 Follow precautions contained in MP 744.1," Fire Pump Diesel Engine Inspection."
O V
SP 788.8 Level of Use
, ST P ~
' THINK ACT REVIEW Rev.5 General r'
N
{s i.
2 of 4
3 i
. /(
- 4. INSTRUCTIONS-
.'4.1 INITIAL and DATE Maint. Form 788.8-1 indicating that prerequisites have been completed and precautions have been noted.
4.2 Refer Tb MP 744.1, " Fire Pump Diesel Engine Inspection," and INSPECT engine.
4.3 IE inspection results are not satisfactory, RECORD results on Maint.
Form 788.8-1 and NOTIFY FLS.
4.4 RECORD serial number and calibration due date of any Measuring and Tbst Equipment used during inspection on Maint. Form 788.8-1.
i-i
- i 4
1 i
i i
(
l i-4 1
4 J
J i
l A
A 4
SP 788.8 vb? ' Y C " 4 ctT "R lEvf Rev. 5 Level of Use General grg jeg j: u em 3 0r4 e
1 e.
.w=w-a w
a
,+,
-~a----s
,---er<
1-e
,,o
-em. r.
yn,-e-,
s j
O
- 5. REVIEW AND SIGN-OFF 5.1 The review and sign-off of this procedure is satisfied by the review and
. sign-off of Maint. Form 788.8-1.
- 6. REFERENCES 6.1
" Millstone Unit 1 Technical Requirements Manual," OPS Form 273-7.2,
" Fire Protection 1bchnical Requirements," Section 4.1.A.1.g.3(a),
6.2 MP 744.1," Fire Pump Diesel Engine inspection"
- 7.
SUMMARY
OF CHANGES l-7.1 This procedure was revised as a result of a Biennial Review. Made minor editorial changes. Updated the reference to the applicable portion of the
" Millstone Unit 1 Technical Requirements Manual." Also revised Maintenance Form 788.8-1 to show the same change.
D
(
SP 788.8 Level of Use y.t, _.n.-.__~--_
e General ST P'
~ THINK
<ACT" REVIEW Rev. 5 jjg4 j.;,q jwg 4 gg 4 l
F:rm Apprsv:1 Approva ()
t
_1/ \\ ___D" Approval Data Ettsctive Date PORC Meeting No.
3 \\ /s >
J l,-N R, 1 9 /'7
$-19-6
/ - Gr7. /g L /
C l - (O); ' Fire Pump Diesel Engine 18-Month Surveillance C C Generic Information 1 --
3 Reference Procedure-Applicable Tech. Spec. or Technical Requirements Manual Frequency SP 788.8 Technical Requirements Manual Every 18 months OPS Form 273-7.2, Section 4.1.A.1.g.3(a)
This form is being used for the following:
O Tech Spec Surveillance O System Alignment
@ Other: Technical Requirements Manual Q Maintenance Restoration Q Non-Tech Spec (Retest)
Surveillance (PM) t Specific infc mation Scheduled Date Applicable Mode AWO Applicable to all modes Test Authorized By (SM/US)
Date Prerequisites Completed By (Initials /Date)
Precautio.is Noted By (Initials /Date)
Surveillance Completed By Date Acceptance Criteria Met?
O vES O NO Accepted By (Department FLS)
Date Approved By (Department Head / Designee)
Date Shift Manager Notified of Failed Surveillance Date Acceptance Criteria l
-Technical Requirements Manual acceptance criteria are considered met when the fire pump diesel engine has been inspected and maintained in accordance with MP 744.1, and is acceptable for return to service.
l Test Equipment Eauioment Type identification /OA Numbat Calibration Due Date Data and Comments
' Record any damage or abnormal deterioration.
O Maint. Form 788.8-1 i
Rev. 3 Page1of1
_