Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215E351 + (ML20215E351)
- IR 05000275/1985036 + (ML20215E352)
- ML20215E353 + (ML20215E353)
- ML20215E355 + (ML20215E355)
- ML20215E356 + (ML20215E356)
- ML20215E357 + (ML20215E357)
- ML20215E360 + (ML20215E360)
- ML20215E362 + (ML20215E362)
- IA-86-217, Partially Withheld Record of 840614 Telcon Between D Andrews & B Hayes Re Drug Investigation at Plant + (ML20215E363)
- ML20215E363 + (ML20215E363)
- ML20215E364 + (ML20215E364)
- ML20215E365 + (ML20215E365)
- ML20215E369 + (ML20215E369)
- ML20215E371 + (ML20215E371)
- IA-86-752, Forwards IE Bulletin 79-19, Packaging of Low Level Radwaste for Transport & Burial. Action Required.W/O Encl + (ML20215E374)
- ML20215E374 + (ML20215E374)
- ML20215E376 + (ML20215E376)
- ML20215E377 + (ML20215E377)
- ML20215E378 + (ML20215E378)
- ML20215E379 + (ML20215E379)
- ML20215E380 + (ML20215E380)
- ML20215E381 + (ML20215E381)
- ML20215E382 + (ML20215E382)
- ML20215E383 + (ML20215E383)
- ML20215E384 + (ML20215E384)
- ML20215E385 + (ML20215E385)
- ML20215E387 + (ML20215E387)
- ML20215E388 + (ML20215E388)
- ML20215E391 + (ML20215E391)
- ML20215E394 + (ML20215E394)
- ML20215E395 + (ML20215E395)
- IR 05000245/1986023 + (ML20215E396)
- ML20215E397 + (ML20215E397)
- IR 05000498/1987019 + (ML20215E398)
- ML20215E399 + (ML20215E399)
- ML20215E400 + (ML20215E400)
- IR 05000725/2008031 + (ML20215E401)
- ML20215E403 + (ML20215E403)
- ML20215E405 + (ML20215E405)
- ML20215E408 + (ML20215E408)
- ML20215E409 + (ML20215E409)
- 05000482/LER-1986-063, :on 861114,control Room Ventilation Isolation Signal Initiated.Caused by Chlorine Monitor Spurious Spike. Monitor Placed in Bypass for Troubleshooting & Returned to Svc on 861118 + (ML20215E410)
- ML20215E411 + (ML20215E411)
- 05000282/LER-1986-008-01, :on 861116,facility Exceeded 100% Power for One 8 H Shift.Caused by Procedural Inadequacies.Heat Balance Calculation Will Be Done Hourly by Plant Process Computer & Plant Derated to 99.5% Power + (ML20215E412)
- ML20215E413 + (ML20215E413)
- ML20215E415 + (ML20215E415)
- ML20215E417 + (ML20215E417)
- ML20215E419 + (ML20215E419)
- ML20215E420 + (ML20215E420)
- 1CAN128601, Responds to Part I of Notice of Violation & Proposed Imposition of Civil Penalty from Safety Sys Functional Insp Rept 50-313/86-01.Check Valves Installed During 860115 Shutdown.Response to Part II Will Follow within 14 Days + (ML20215E421)
- IR 05000375/1986001 + (ML20215E422)