JUN 151987
,
.
In Reply Refer To:
Dockets: 50-498/87-19
t
50-499/87-19
Houston Lighting & Power Company
ATTN:
J. H. Goldberg,
Group Vice President, Nuclear
.
P. O. Box 1700
s
Houston, Texas 77001
j
Gentlemen:
This refers to the inspection conducted by Messrs. C. E. Johnson and
D. L. Garrison of this office during the period March 27 through May 8,1987,
of activities authorized by NRC Construction Permits CPPR-128 and CPPR-129, for
the South Texas Project, Units 1 and 2, and to the discussion of our findings
,
with Mr. J. Westermier and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included site tours; licensee action on
3
previously reported items; licensee action on IE Notices; safety-related pipe
1
supports and restraints; followup on Part 21-reports; safety-related piping;
safety-related heating, ventilating, and air conditioning systems; and
post-tensioning systems. Within these areas, the. inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
'
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:SR?g
RPB/Ch
RPB/
B'/
-
-
DLGarrison
WM
il
RGTay
QL pns
pCEJohnson/lr [h6 /f /87
/5/ 7
4/ f/87
9 5 /87
/%
( / f/8 /
C:RP ,
JEGa
urdo
V
87
z,u\\
[k kg
8706190342 870615
ADOCK 05000498
G
\\\\
1
>
-
,
,
?'N
,b
.
'
'
h.-
.
.
,
,
,_
. , -
!
~
? Houston Lighting &-Power Company
.-2-
l
-
c.
'
--
- Shoul.d'you have any~ questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Ort;;ln:1 Gir;ned Dy
J. E. Gcallardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
<
-
1.
Appendix A - Notice of Violation
"
2. ' Appendix B - NRC Inspection Report
.50-498/87-19
50-499/87-19
cc w/ enclosure:
.
Houston Lighting & Power Company
ATTN:- M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas .'77001
Houston Lighting & Power Company
. ATTN: .G.-Vaughn, Vice President,
Nuclear Operations
.P. O. Box 1700
Houston, Texas 77001
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI-0PS
.R.'D. Martin, RA
- RRI-CONST.
"*SectionChief(RPB/C)
,
- R&SPB;
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, ELD
- R. G. Taylor, RPB/C
- RSB
- Project Inspector
- R. Hall
- P.iKadambi, NRR'
- W. McNeill
- R. Perch, NRR
' w/766
l