Forwards Insp Repts 50-498/87-19 & 50-499/87-14 on 870327- 0508 & Notice of Violation
ML20215E351
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/15/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20215E354 List:
References
NUDOCS 8706190342
Download: ML20215E351 (2)


See also: IR 05000498/1987019

Text

-

~

,

JUN 151987

,

.

In Reply Refer To:

Dockets: 50-498/87-19

t

50-499/87-19

Houston Lighting & Power Company

ATTN:

J. H. Goldberg,

Group Vice President, Nuclear

.

P. O. Box 1700

s

Houston, Texas 77001

j

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson and

D. L. Garrison of this office during the period March 27 through May 8,1987,

of activities authorized by NRC Construction Permits CPPR-128 and CPPR-129, for

the South Texas Project, Units 1 and 2, and to the discussion of our findings

,

with Mr. J. Westermier and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included site tours; licensee action on

3

previously reported items; licensee action on IE Notices; safety-related pipe

1

supports and restraints; followup on Part 21-reports; safety-related piping;

safety-related heating, ventilating, and air conditioning systems; and

post-tensioning systems. Within these areas, the. inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

'

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:SR?g

RPB/Ch

RP

RPB/

B'/

-

-

DLGarrison

WM

il

RGTay

QL pns

pCEJohnson/lr [h6 /f /87

/5/ 7

4/ f/87

9 5 /87

/%

( / f/8 /

C:RP ,

JEGa

urdo

V

87

z,u\\

[k kg

8706190342 870615

PDR

ADOCK 05000498

G

PDR

\\\\

1

>

-

,

,

?'N

,b

.

'

'

h.-

.

.

,

,

,_

. , -

!

~

? Houston Lighting &-Power Company

.-2-

l

-

c.

'

--

Shoul.d'you have any~ questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Ort;;ln:1 Gir;ned Dy

J. E. Gcallardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

<

-

1.

Appendix A - Notice of Violation

"

2. ' Appendix B - NRC Inspection Report

.50-498/87-19

50-499/87-19

cc w/ enclosure:

.

Houston Lighting & Power Company

ATTN:- M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas .'77001

Houston Lighting & Power Company

. ATTN: .G.-Vaughn, Vice President,

Nuclear Operations

.P. O. Box 1700

Houston, Texas 77001

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI-0PS

.R.'D. Martin, RA

  • RRI-CONST.

"*SectionChief(RPB/C)

,

  • R&SPB;
  • MIS System
  • RIV File
  • D. Weiss, RM/ALF
  • RSTS Operator

R. Pirfo, ELD

  • R. G. Taylor, RPB/C
  • RSB
  • Project Inspector
  • R. Hall
  • P.iKadambi, NRR'
  • W. McNeill

' w/766

l