Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J614 + (ML20214J614)
- ML20214J620 + (ML20214J620)
- ML20214J622 + (ML20214J622)
- ML20214J624 + (ML20214J624)
- ML20214J626 + (ML20214J626)
- ML20214J628 + (ML20214J628)
- IR 05000285/1986008 + (ML20214J630)
- ML20214J632 + (ML20214J632)
- ML20214J637 + (ML20214J637)
- ML20214J638 + (ML20214J638)
- ML20214J639 + (ML20214J639)
- IR 05000313/1986013 + (ML20214J640)
- B12293, Forwards Reviews for Isap Topics 1.06, Wind & Tornado Loadings/Tornado Missiles & 1.31, Pipe Break Outside Containment, Per 850517 Commitment + (ML20214J644)
- 05000316/LER-1986-021, :on 860707,during Troubleshooting of source- Range Nuclear Instrument N-32,spike on ESF Signal Occurred. Procedures Revised to Permit Bypassing Reactor Trip Function During Troubleshooting + (ML20214J646)
- ST-HL-AE-2188, Interim Deficiency Rept Re Leaking Main Steam Power Operated Relief Valve Switches.Initially Reported on 870323.Affected Unit 1 Switches Replaced W/Corresponding Unit 2 PORV Components.Next Rept Will Be Submitted by 870603 + (ML20214J648)
- GO2-86-697, Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825 + (ML20214J649)
- ML20214J649 + (ML20214J649)
- ML20214J650 + (ML20214J650)
- ML20214J651 + (ML20214J651)
- ML20214J652 + (ML20214J652)
- ML20214J653 + (ML20214J653)
- ML20214J654 + (ML20214J654)
- ML20214J655 + (ML20214J655)
- 0CAN068609, Responds to NRC Re Violations Noted in Insp Repts 50-313/86-13 & 50-368/86-13.Corrective Actions:Procedure 2402.35 Will Be Revised to Maximize Efficiency During Performance of Work on HPSI Pumps by Sept 1986 + (ML20214J656)
- ML20214J658 + (ML20214J658)
- ML20214J661 + (ML20214J661)
- ST-HL-AE-1805, Advises That Review of Westinghouse Stress 1 Repts Should Be Finalized by Early 1987.Meeting at Westinghouse Ofc in Pittsburgh,Pa Recommended for First Wk in Mar 1987.Related Correspondence + (ML20214J664)
- ML20214J665 + (ML20214J665)
- ML20214J666 + (ML20214J666)
- ML20214J667 + (ML20214J667)
- ML20214J670 + (ML20214J670)
- ML20214J673 + (ML20214J673)
- ML20214J674 + (ML20214J674)
- TXX-6087, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Facility Not Vulnerable to Described Single Failure Problem + (ML20214J677)
- IR 05000412/1987033 + (ML20214J678)
- ML20214J683 + (ML20214J683)
- IR 05000352/1987010 + (ML20214J685)
- U-600669, Forwards Technical Justification to 860312 Request to Defer Preoperational Tests Re MSIV Leakage Control Sys Until After Fuel Load + (ML20214J686)
- ML20214J689 + (ML20214J689)
- ML20214J690 + (ML20214J690)
- ST-HL-AE-1811, Informs of Util Actions in Response to Certain Concerns Received from Former Employee of Contractor.Safeteam Investigation of Installations Noted During Plant Walkdown Currently Underway.Related Correspondence + (ML20214J691)
- ML20214J694 + (ML20214J694)
- ML20214J696 + (ML20214J696)
- ML20214J698 + (ML20214J698)
- ML20214J702 + (ML20214J702)
- ML20214J705 + (ML20214J705)
- ML20214J707 + (ML20214J707)
- ML20214J708 + (ML20214J708)
- ML20214J709 + (ML20214J709)
- ML20214J712 + (ML20214J712)
- IR 05000285/1986010 + (ML20214J714)