Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212A534 + (ML20212A534)
- ML20212A536 + (ML20212A536)
- PNO-I-86-099, on 861217,four Spent Mo-99/Tc99m Generators Reported Stolen from Carrier Van While Parked at Driver Residence in Philadelphia,Pa.On 861217,three Generators Found.As of 861218,one Generator Still Missing + (ML20212A537)
- L-97-043, Responds to NRC Re Violations Noted in Insp Repts 50-334/97-05 & 50-412/97-05 on 970818.Corrective Actions: Management Expectations Re Use of Current Programs for Troubleshooting Energized Equipment Have Been Reinforced + (ML20212A538)
- ML20212A542 + (ML20212A542)
- ML20212A544 + (ML20212A544)
- 05000325/LER-1986-029, :on 861116,automatic Reactor Scram on High Pressure Occurred.Caused by Exceeding Bypass Capacity of Main Steam Turbine Bypass Valves During Runback of Main Generator.Valve Controller Properly Configured + (ML20212A545)
- ML20212A548 + (ML20212A548)
- ML20212A551 + (ML20212A551)
- 05000325/LER-1997-010-02, :on 970919,discovered Failure to Comply W/ Surveillance Requirements to Test EDGs During Shutdown. Caused by Personnel Error.Review of TSs Will Be Performed to Identify Surveillances Required to Be Performed + (ML20212A552)
- ML20212A553 + (ML20212A553)
- ML20212A555 + (ML20212A555)
- ML20212A558 + (ML20212A558)
- ML20212A560 + (ML20212A560)
- ML20212A562 + (ML20212A562)
- 05000414/LER-1995-001-01, Forwards LER 95-001-01,concerning Reactor Trip Due to Closure of Msiv.Rept Revised to Reflect Change to Corrective Actions Implemented + (ML20212A563)
- 05000397/LER-1986-037, :on 861120,plant Shut Down After Connector for Signal Cable of Acoustic Monitoring Channel 5C Determined to Be Not Environmentally Qualified.Caused by Inadequate Maint Work Request.Vital Work Requests Reviewed + (ML20212A564)
- ML20212A565 + (ML20212A565)
- ML20212A566 + (ML20212A566)
- 05000458/LER-1986-065, :on 861114,past Interpretation of Leakage Requirements for MSIV Found Incorrect.Memo Issued to Delineate Original Intent of Tech Spec Requirement & Associated Surveillance Procedures Revised + (ML20212A569)
- ML20212A570 + (ML20212A570)
- ML20212A571 + (ML20212A571)
- ML20212A572 + (ML20212A572)
- ML20212A573 + (ML20212A573)
- ML20212A576 + (ML20212A576)
- ML20212A577 + (ML20212A577)
- ML20212A578 + (ML20212A578)
- ML20212A579 + (ML20212A579)
- ML20212A580 + (ML20212A580)
- ML20212A583 + (ML20212A583)
- IR 05000282/1986007 + (ML20212A584)
- 05000414/LER-1995-001-02, :on 950221,reactor Trip Due to Closure of MSIV Occurred.Caused by Degraded Optical Isolator within Control Circuitry for Msiv.Degraded Isolators Tested & Replaced + (ML20212A586)
- ML20212A587 + (ML20212A587)
- ML20212A588 + (ML20212A588)
- ML20212A590 + (ML20212A590)
- ML20212A591 + (ML20212A591)
- IR 05000461/1986037 + (ML20212A594)
- ML20212A595 + (ML20212A595)
- IA-86-785, Listing of NRC Contracts W/Lll & Sandia for FY86 by FIN Number & Title,Including Listings of Nmss,Res & NRR Projects Currently Being Conducted at Lll & Costs & Obligations as of 860930 + (ML20212A596)
- ML20212A596 + (ML20212A596)
- ML20212A598 + (ML20212A598)
- ML20212A602 + (ML20212A602)
- ML20212A603 + (ML20212A603)
- PNO-II-86-048, on 860710,two Glaziers Employed by Util Contractor Fell 40 Ft After One End of Scaffolding Gave Way. Accident Occurred in New Simulator Training Bldg Outside Plant Security Fence.Men Taken to Hosp + (ML20212A604)
- ML20212A605 + (ML20212A605)
- ML20212A606 + (ML20212A606)
- ML20212A607 + (ML20212A607)
- ML20212A608 + (ML20212A608)
- IR 05000293/1986010 + (ML20212A612)
- 05000263/LER-1997-010, Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments + (ML20212A613)
- ML20212A614 + (ML20212A614)