Notice of Violation from Insp on 860512-0701
ML20212A578
Person / Time
Site: Clinton 
Issue date: 07/23/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20212A574 List:
References
50-461-86-37, NUDOCS 8607290075
Download: ML20212A578 (2)


Text

_ _ _ _ _ _ - _ _

f

=

6 NOTICE OF VIOLATION Illinois Power Company License No. CPPR-137

~

As a result of the inspection conducted on May 12 through July 1,1986, and in accordance with the " General Policy and Procedures for NRC Enforcement l

Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:

10 CFR 50, Appendix B, Criterion Vi as implemented by the Illinois Power Company Operational Quality Assurance Manual (0QAM), chapter 5, Instructions, Procedures, and Drawings, requires the following:

j 1.

Instructions, procedures, or drawings shall include appropriate qualitative and/or quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

2.

Instructions, procedures, or drawings for fabrication, installation, testing, and operation shall contain step-by-step instructions in the degree of detail necessary for performing a required function or task.

Contrary to the above:

1.

Procedure CPS No. 9052.02, LPCS Valve Operability Checks, revision 20, did not contain sufficient acceptance criteria to assure that the Low Pressure Core Spray (LPCS) injection shutoff valve (1E21-F005) would open in the time required to support the Clinton Power Station (CPS)

Final Safety Analysis Report (FSAR); did not provide acceptance criteria for inservice inspection (ISI) stroke time testing of two containment isolation valves (1E21-F001 and 1E21-F005) in the close direction; and did not provide acceptance criteria for ISI of at least two additional LPCS valves (1E21-F003 and IE21-F006) identified in the CPS ISI program.

2.

Procedure CPS No.,.9052.02, revision 20, did not contain sufficient detailed instructions to assure that the following required tasks were accomplished:

a.

Timely notification of the shift supervisor of failure to meet CPS FSAR requirements for LPCS system operability.

b.

ISI of two LPCS valves (1E210F003 and 1E21-F006) identified in the CPS ISI program.

c.

CPS Technical Specifications 4.6.4.1 and 4.8.4.2.2 for the LPCS system.

This violation had potential generic applicability to other CPS surveillance procedures.

This is a Severity Level IV violation (Supplement II).

860729 PDR k 860723 G

05000461 PDR

r o

b Notice of Violation 2

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.

7/J3/ft N0t&L

^% _

Dat'ed /

R. F. Warnickl-Chief G

7 A

Projects Branch 1

,)

.