Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P489 + (ML20211P489)
- ML20211P490 + (ML20211P490)
- ML20211P493 + (ML20211P493)
- ML20211P495 + (ML20211P495)
- ML20211P496 + (ML20211P496)
- ML20211P499 + (ML20211P499)
- ML20211P500 + (ML20211P500)
- ML20211P501 + (ML20211P501)
- ML20211P502 + (ML20211P502)
- ML20211P503 + (ML20211P503)
- ML20211P505 + (ML20211P505)
- PNO-I-99-042, on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified + (ML20211P506)
- ML20211P510 + (ML20211P510)
- ML20211P511 + (ML20211P511)
- ML20211P513 + (ML20211P513)
- ML20211P516 + (ML20211P516)
- ML20211P517 + (ML20211P517)
- ML20211P522 + (ML20211P522)
- ML20211P523 + (ML20211P523)
- ML20211P526 + (ML20211P526)
- ML20211P527 + (ML20211P527)
- 05000220/LER-1986-020, :on 860618,during Startup from Refueling Outage,Pinhole Leak Discovered in newly-installed 3/4-inch Sample Line Outside Primary Containment.Caused by Flaw in Pipe.Line Disconnected,Capped & Tested + (ML20211P528)
- ML20211P529 + (ML20211P529)
- ML20211P531 + (ML20211P531)
- ML20211P532 + (ML20211P532)
- ML20211P533 + (ML20211P533)
- ML20211P537 + (ML20211P537)
- ML20211P539 + (ML20211P539)
- 3F0287-17, Ro:On 870121,during Performance of Surveillance Procedure SP-110,CRD a Ac Breaker Failed to Trip.Caused by Malfunction of Undervoltage Trip Coil Device.Breaker Replaced & Successfully Tested + (ML20211P540)
- ML20211P541 + (ML20211P541)
- ML20211P542 + (ML20211P542)
- ML20211P543 + (ML20211P543)
- BSEP-87-0181, Semiannual Radioactive Effluent Release Rept Jul-Dec 1986 + (ML20211P544)
- ML20211P545 + (ML20211P545)
- ML20211P546 + (ML20211P546)
- NSD-NRC-97-5374, Submits AP600 Response to Loss of Offsite Power That Was Requested by Tad Arsh at 970904,meeting W/Nrc on Fire Protection.Analysis Uses More Realistic Assumptions than Used in SSAR Analysis + (ML20211P547)
- ML20211P548 + (ML20211P548)
- ML20211P549 + (ML20211P549)
- NRC-97-0113, Submits Commitments Re Fermi 2 S/Rv as Agreed During 971015 + (ML20211P550)
- ML20211P553 + (ML20211P553)
- ML20211P554 + (ML20211P554)
- 05000219/LER-1997-012, :on 970916,setpoint Was Found to Be non-conservative.Caused by Failure to Include Possible Uncertainties.Appropriate Procedures Were Revised to Reflect New Setpoint Based on SE + (ML20211P556)
- ML20211P559 + (ML20211P559)
- ML20211P561 + (ML20211P561)
- ML20211P565 + (ML20211P565)
- ML20211P568 + (ML20211P568)
- ML20211P569 + (ML20211P569)
- ML20211P570 + (ML20211P570)
- ML20211P571 + (ML20211P571)
- ML20211P572 + (ML20211P572)
- SVP-97-226, Responds to NRC 970425 & s Re Violations Noted in Insp Repts 50/254/97-02 & 50/265/97-02.Corrective Actions: on 970307,B Channel of RPS Was Returned to Tripped Condition & 108D Relay Was Declared Inoperable + (ML20211P574)