Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D043 + (ML20211D043)
- ML20211D044 + (ML20211D044)
- ML20211D045 + (ML20211D045)
- ML20211D048 + (ML20211D048)
- PNO-II-87-011, heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept + (ML20211D050)
- ML20211D054 + (ML20211D054)
- ML20211D056 + (ML20211D056)
- ML20211D059 + (ML20211D059)
- ML20211D061 + (ML20211D061)
- A05988, Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed + (ML20211D062)
- ML20211D063 + (ML20211D063)
- AECM-86-0327, Forwards Info to Document 861010 Discussions W/Nrc & Support 860902 Application for Amends to License NPF-29 & CPPR-119 to Permit Sys Energy Resources,Inc to Assume Plant Operation.Design of Offsite Power Sys Unaffected + (ML20211D064)
- NSD-NRC-97-5332, Forwards Addl Info Re AP600 Large Break LOCA Wcobra/Trac Methodology,Requested in Recent Telcons W/L Lois,C Fineman & W Huffman + (ML20211D065)
- ML20211D068 + (ML20211D068)
- ML20211D069 + (ML20211D069)
- ML20211D071 + (ML20211D071)
- ML20211D072 + (ML20211D072)
- ML20211D076 + (ML20211D076)
- ML20211D077 + (ML20211D077)
- ST-HL-AE-1782, Discusses Safeteam Investigation of Allegation Re Bechtel Engineering Efforts,Per .Concerns Unsubstantiated. Related Correspondence + (ML20211D079)
- ML20211D081 + (ML20211D081)
- ML20211D083 + (ML20211D083)
- ML20211D084 + (ML20211D084)
- ML20211D086 + (ML20211D086)
- ML20211D091 + (ML20211D091)
- ML20211D092 + (ML20211D092)
- ML20211D093 + (ML20211D093)
- ML20211D094 + (ML20211D094)
- ML20211D095 + (ML20211D095)
- ML20211D096 + (ML20211D096)
- ML20211D097 + (ML20211D097)
- ML20211D100 + (ML20211D100)
- 05000458/LER-1997-005-02, :on 970822,reactor Scram Occurred Due to Failure of Connector to Electrical Trip Solenoid Valve. Replaced Shorted Connector Prior to Plant start-up + (ML20211D102)
- ML20211D103 + (ML20211D103)
- 05000352/LER-1986-042-01, :on 860814,Surveillance Test ST-6-095-450-1 Re Div I-IV Safeguard Power Distribution Alignment & Voltage Check Not Performed.Discovered on 860901.Caused by Procedure Errors.Test Revised.Related Correspondence + (ML20211D104)
- 3F0997-30, Forwards Suppl Info to TS Change Request Notice 210 Re Proposed Changes to TS & Other Aspects of Licensing & Design Basis,To Address Mods & Procedure Changes Required to Mitigate Consequences of Certain SBLOCA + (ML20211D106)
- ML20211D108 + (ML20211D108)
- ML20211D109 + (ML20211D109)
- ML20211D110 + (ML20211D110)
- ML20211D111 + (ML20211D111)
- ML20211D114 + (ML20211D114)
- ML20211D115 + (ML20211D115)
- ML20211D116 + (ML20211D116)
- ML20211D117 + (ML20211D117)
- ML20211D119 + (ML20211D119)
- ML20211D120 + (ML20211D120)
- ML20211D123 + (ML20211D123)
- ML20211D124 + (ML20211D124)
- 05000312/LER-1987-003, :on 870120,welding Work Performed in Fire Zones 13 & 75 Required Continuous Fire Watch Post,But Only Hourly Fire Watch Performed by Fire Protection Staff.Caused by Personnel Error.Personnel Involved Reprimanded + (ML20211D126)
- ML20211D128 + (ML20211D128)
- ML20211D129 + (ML20211D129)