OPERATING DATA REPORT DGCKET NO. 50 - 352 DATE OCTOBER 15, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY i
H.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I2151 841-5022 OPERATING STATUS
- 1. UNIT NAME: LIHERICK UNIT 1 l NOTES UNIT 1 EXPERIENCED NO l
l l
- 2. REPORTING PERIDOI SEPTET 9ER, 1986 l
REPORTABLE OUTAGES.
l l
l
- 3. LICENSED THERMAL P0HERitWT) 3293 l
l l
l C. NAMEPLATE RATING IGROSS PME)8 1138 l
l l
l
- 5. DESIGN ELL 1RICAL RATING (NET PHEls 1055 l
l l
l
- 6. HAXIMUM DEPEt40ABLE CAPACITY IGROSS tWE)* 1092 l
l l
l
- 7. MAXINUM DEPENDABLE CAPACITY INET iMEls 1055 l
l C. IF CHANGES DCCUR IN CAPACITY RATINGS IITEMS NUPSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
- 9. P0HER LEVEL TO HHICH RESTRICTED, IF ANY INET NMEll 10- REASONS FOR RESTRICTIONS, IF ANYI THIS HONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIDO 720 5,807 5,807
- 12. NUPBER OF HOURS REACTOR HAS CRITICAL 720.0 4,508.0 4,508.0
- 13. REACTOR RESERVE SHtfTDolff HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 4,427.0 4,427.0
- 15. UNIT RESERVE SHUTDOPH HOURS 0.0 0.0 0.0
- 15. GROSS THERHAL ENERGY GENERATED itNH) 2,366,712 14,448,164 14,448,164
- 17. GROSS ELECTRICAL ENERGY GENERATED tlNH) 778,010 4,754,930 4,754,930
- 18. NET ELECTRICAL ENERGY GENERATED (tNH) 749,409 4,563,812 4,563,812 8610220087 860930 PAGE 1 0F 2 PDR ADOCK 05000352 b
OPERATING DATA REPORT (CONTItRIEDI DOCKET NO. 50 - 352 DATE OCTOBER. 15, 1986 THIS HONTH YR-TO-DATE CUNULATIVE
- 19. UNIT SERVICE FACTOR 100.0 76.2 76.2
- 20. UNIT AVAILABILITY FACTOR 100.0 76.2 76.2
- 21. UNIT CAPACITY FACTOR (USING HDC NET) 98.7 74.5 74.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.7 74.5 74.5
- 23. UNIT FORCED OLITAGE RATE 0.0 5.1 5.1
- 24. SHUTD06045 SCHEDULED OVER NEXT 6 NONTHS (TYPEe DATE: AND DURATION OF EACHis
- 25. IF SHUTDODN AT END OF REPORT PERIDO, ESTINATED DATE OF STARTUPt
- 26. UNITS IN TEST STATUS (PRIOR TO COPMERCIAL OPERATIONil FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 I2/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 COPMERCIAL OPERATION IST QTR 86 2/01/86 PACE 2 0F 2
-^
m = aano a
,g
}
AVERAGE DAILY UNIT PONER LEVEL DOCKET No. 50 - 352 UNIT LIHERICK UNIT 1 DATE OCTOBER 15, 1986 COMPANY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I2151 841-5022 MONTH SEPTEPSER 1986 DAY AVERAGE DAILY PCHER LEVEL DAY AVERAGE DAILY PONER LEVEL IPME-NETI I PNE-NET I 1
1044 17 1054 2
1041 18 1048 3
1046 19 1039 4
1031 20 1038 5
1037 21 1038 6
1043 22 1046 7
1051 23 1036 l
8 1043 24 1038 9
1045 25 1034 10 1053 26 1034 11 1029 27 1039 12 1025 28 1041 13 1058 29 1037 14 1041 30 1030 15 1044 l
16 1046 I
i i
i I
s_
~-
~
tJNIT SHUTDODNS AND P0HER REDUCTIONS DOCKET No. 50 - 352
)
UNIT NAME LIHERICK UNIT 1 DATE OCTOBER 15, 1986 REPORT MONTH SEPTEMBER, 1986 COMPLETED BY PHILADELPHIA ELECTR C COMPANY j
_ = _ - - - -
H.M.ALDEN ENGINEER-IN-CHARGE LICENSIllG SECTION PAJCLEAR GENERATION DIVISION TELEPHONE E215) 841-5022
.===-----.....
l l
l l
l METHOD OF l LICENSEE lSYSTEMICOMPONENT! CAUSE AND CORRECTIVE l
ITYPElDURATIONlREASONISHUTTING DOPNl EVENT l CODE l CODE l ACTION TO NO.! DATE l (111 (HOURS)I (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE
._=_ _
1 I
I ----- 1 I
I I
l i
l l
l I
l
~l I
l 1
(1)
(2)
-83)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE lEXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST E - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REPAJLATORY RESTFICTION 4 - OTHER (EXPLAIN)
FILE INUREG-0161)
E - OPERATOR TRAINIt4G + LICENSE EXANINATICN F - ADMINISTRATIVE 15)
G - OPERATIONAL ERROR (EXPLAIN)
H. OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE n..
m
Docket No. 50-352 Attachment to Monthly Operating Report for September, 1986 Limerick Generating Station Unit 1 September 1 through September 30, 1986 I.
Narrative Summary of Operating Experiences Unit 1 operated at approximately 100% power throughout the report period.
II.
Challenges to the Main Steam Relief Valve System There were no challenges to the main steam safety-relief valves during the month of September.
,/
gEt ATED CORRESPOMCENCt PHILADELPHIA ELECTRIC COMPANY U$3Yr[c 2301 M ARKET STREET P.O. BOX 8699
'86 0CT 20 P1 :19 PHILADELPHI A PA.19101 0FFTi s (2156841 4000 gg[FI i q.
'i Cctober 15, 1986 Docket No. 50-352/ M 3 N Director Office of Resource Management
~ ~ ~ ~ ~
US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
Enclosed is the monthly operating report for Limerick Unit 1 for the month of September, 1986, forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, f/'
W. M. Alden Engineer-In-Charge Licensirq Section Nuclear
.neration Division Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC E. M.
Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
INPO Records Center See Attached Service List i
cc:
Troy B. Conner, Jr., Esq.
Benjamin H. Vogler, Esq.
Mr. Frank R. Romano Mr. Robert L. Anthony Ms. Maureen Mulligan Charles W. Elliott, Esq.
Barry M. Hartman, Esq.
Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.
David Wersan, Esq.
Robert J. Sugarman, Esq.
Kathryn S. Lewis, Esq.
Spence W.
Perry, Esq.
Jay M. Gutierrez, Esq.
Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)
E.
M.
Kelly Timothy R.
S. Campbell July 23, 1986
. _ _.