Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209D331 + (ML20209D331)
- ML20209D332 + (ML20209D332)
- ML20209D333 + (ML20209D333)
- 05000353/LER-1999-003-02, :on 990607,bypass of RW Cleanup Sys Leak Detection Sys Isolation Functions on Three Separate Occasions Was Noted.Caused by Inadequate Review & Approval of Change to Sys Procedure.Procedure S44.7.C Revised + (ML20209D336)
- ML20209D337 + (ML20209D337)
- ML20209D339 + (ML20209D339)
- ML20209D340 + (ML20209D340)
- ML20209D342 + (ML20209D342)
- ML20209D343 + (ML20209D343)
- ML20209D345 + (ML20209D345)
- ML20209D347 + (ML20209D347)
- ML20209D349 + (ML20209D349)
- ML20209D350 + (ML20209D350)
- ML20209D351 + (ML20209D351)
- ML20209D352 + (ML20209D352)
- ML20209D355 + (ML20209D355)
- ML20209D356 + (ML20209D356)
- IR 05000353/1987003 + (ML20209D358)
- 05000410/LER-1986-024-01, :on 861231,visible Corrosion Observed on Div I & II Battery Bus Bars & Terminals.Caused by Naturally Occurring Leakage from Battery Seals.Corrosion Removed + (ML20209D359)
- ML20209D363 + (ML20209D363)
- ML20209D364 + (ML20209D364)
- ML20209D365 + (ML20209D365)
- ML20209D368 + (ML20209D368)
- ML20209D369 + (ML20209D369)
- ML20209D370 + (ML20209D370)
- ML20209D371 + (ML20209D371)
- ML20209D372 + (ML20209D372)
- ML20209D373 + (ML20209D373)
- IA-85-427, Discusses BNL Study of Need for Independent Agency to Investigate Incidents at NRC Licensed Facilities. Documentation Requested for Each Substantive Change to Draft Rept + (ML20209D374)
- ML20209D374 + (ML20209D374)
- ML20209D378 + (ML20209D378)
- ML20209D379 + (ML20209D379)
- 05000285/LER-1999-002, :on 980910,inadvertent Ventilation Isolation Actuation Signal Occurred While Maint Was Being Performed. Caused by Switch Failure.Key Switch for RM-062 Has Been Replaced.With + (ML20209D380)
- NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions + (ML20209D383)
- PNO-V-87-032, on 870422,small Stones in Bottom Hemispherical Head of Hot Leg Side of Steam Generator 1 Discovered.Work Activities in Steam Generators Suspended Until Primary Side of Steam Generators 1 & 2 Inspected + (ML20209D384)
- ML20209D387 + (ML20209D387)
- ML20209D388 + (ML20209D388)
- ML20209D391 + (ML20209D391)
- ML20209D392 + (ML20209D392)
- ML20209D393 + (ML20209D393)
- ML20209D397 + (ML20209D397)
- ML20209D398 + (ML20209D398)
- ML20209D399 + (ML20209D399)
- ML20209D400 + (ML20209D400)
- ML20209D402 + (ML20209D402)
- ML20209D404 + (ML20209D404)
- ML20209D405 + (ML20209D405)
- ST-HL-AE-2112, Forwards Actuation Train Relay Response Time Test Summary & Results & marked-up Proof & Review Tech Spec Page 3/4 3-17, for Info & Use.Based on Results of Test,Changes Proposed in Should Be Incorporated Into Tech Specs + (ML20209D408)
- ML20209D409 + (ML20209D409)
- ML20209D410 + (ML20209D410)
- ML20209D411 + (ML20209D411)