Forwards Project Identification Summary Sheets Outlining Two Addl Tasks for Review of Seismic Design Licensing Condition. Response Re Adequacy of Funding Requested.Meeting W/Usgs in Early Oct Suggested.Tasks Should Be in Place by 850101
ML20209D342
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 09/27/1984
From: Brocoum S
Office of Nuclear Reactor Regulation
To: Devine J
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
Shared Package
ML20150F500 List: ... further results
References
FOIA-86-391 NUDOCS 8410090355
Download: ML20209D342 (7)


Text

.

. _.. ~

,a DISTRIBUTION:

DCD 016 GSB RDG SEP 2 7 m Qg go' Mr. James F. Devine U. S. Geological Survey M. S. 106 National Center South Lake Drive Reston, VA 22092

Dear Jim:

Last sumer in a discussion on the USGS's role in the Diablo Canyon Seismic License Condition we agreed,that before we add tasks to our contract for the Diablo Canyon review, to discuss the USGS's role.

I tried to reach you and Ted, but I missed you both before you went on international travel. We are beginning the modification of the USGS contract to add the two tasks which are sumarized on the enclosed Project Identification Sumary (PID) sheets. These PID sheets briefly outline what we would like the USGS to advise us on in the License Condition.

Once these sheets are signed and approved by H. Denton, we will be more or less locked into the funding levels indicated. What we need to know as soon as possible is if these funding levels are reasonable from the USGS's point of view.

As far as the actual work to be performed, we have flexibility and we will not lock in to the actual wording until the contract negotiations.

We would like to meet with the USGS to discuss the contract during early

' October. We are planning to have these tasks in place by January 1, 1985.

Sincerel,

5 Stephan Brocoum, Acting Chief Geosciences Branch r

l Division of Engineering cc:

T. Algermissen, USGS 9PP b410090555)840927 4F= ADOCK 05000275 O

DE:GSB N SBrocoum:sl l

9/26/84 p: OW% -3 O

~

1...

}

?-

3

' . J OFFICE OF NUCLEAR REACTOR REGULATION

~T

'.7 PROJECT IDENTIFICATION SUMfMRY,(PIDS)

USGS TECHNICAL ASSISTANCE TO THE GEOSCIENCES

. Task 13

. TITLE:

BRANCH

. Diablo Canyon FIN: 88663 Gen 19nu and Tactnniet

~

CONTRACT NUMBER (Non-D0E):

'B&R NUMBER:

NRR OPERATING PLAN INDEX NO.:

NRC-03-84-068 20-19-10-11-2 DIVISION:

DE GSB OJECT MNAGER:H. Lefevre CONTRACTORU. S. Geological Survey CONTRACT METHOD:-. Interagency agreement CITY, STATE (Non-DOE): Reston, VA SMALL BUSINESS / MINORITY CONTRACT (Non-00E)

SUB-CONTRACTOR (S): None' YES /

/

NO /X /

l l

0 PROJECTED PERIOD OF PERFORIMNCE START: 01/01/85 END:

10/1/88 PROJECTED FINANCIAL DATA (000's)

FEE RECOVERABLE:

YES / J. NO / /

TOTAL CURRENT FY NEXT FY NEXT.+1 VALUE BUDGET (85)

BUDG (86)

BUDG (87) NEXT +2 BUDG (88) 425 85 135 125 80 APPLICATION (RELATE THE PROJECT TO A SPECIFIC PLANNED ACCOMPLISHMENT)

The USGS provides expertise in a wide variety of earth sciences disciplines and is to provide information and advice to the NRC during the parallel staff effort re-resulting from the License Condition on Diablo Canyon to revalidate the seismic design bases.

O e

I

^~M__7_?_ _"* :"_'f _P_?_Ti' 6h

-f---

_-_-m.--_

y 3..

. WORK REQUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED)

The USGS will assist the staff by"a 4Mplishing the foll5 wing:

1.

Reviewing the geological and geoph'ysical data, informat, ion and interpretation provided by the Licensee.

2.

ReYiewingdataahailablefromUSGSandUSGS-fundedstudiesoff coastal California.

3.

Aiding in the development of the NRC program.

4.

Conducting geologic reconnaissances of the Diablo Canyon site and region.

5.

Defining geological and current tectonic framework of Diablo Canyon region including a definition of those faults which may have an impact upon the reevaluation of the seismic design at Diablo Canyon.

6.

Preparing draft and final reports on the geology and tectonics of the DCNPP site and region.

7.

Attending meetings in Bethesda, Maryland, the DCNPP site and elsewhere in order to accomplish the preceeding tasks.

MODIFICAT10HS (DESCRIBE MAJOR CHANGES TO THE PROJECT

.o l

i l

=

)

1-

)

. JUSTIFICATION FOR LICENSE FEE RECOVERABILITY I

e I

=.

4 COMPLETE'AS APPLICABLE -

Recomended:

Endorsed:

Endorsed:

EN U sed:

Appr5ed:

PROJECT MGR.

SECTION LDR BRANCH CHF QSTDIR.

DIV. DIR.

  1. '/

J/py L. Reiter p_ t provre/p-

' 9 Vn11ml/nitials)

< nrneniim s

nrnen>>.

~ d ht D

IY!Id (Date) e

_ ~.

4

/,

)

,1 a

T-OFFICE OF NUCLEAR REACTOR REGULATION

.m..

Oo PROJECT IDENTIFICATION

SUMMARY

(PIDS) p.

USGS TECHNICAL ASSISTANCE TO THE TASK 14

. TITLE: GEOSCIENCES BRANCH DIABLO CANYON FI!i:B8663 EMPTRICAl GROUND MOTION CONTRACT NUMBER (Non-D0E):

'. B&R NUMBER:

NRR OPERATING PLAN NRC-03-84-068 20-19-10-11-2

.INDEX NO.:

DIVISION:

DE BRANCH:

GSB PROJECT MANAGER:

H. Lefevre CONTRACTOR:U. S. Geological Survey CONTRACT METHOD:- Interagency Agreement CITY, STATE (Non-00E):

SMALL BUSINESS / MINORITY C0iiTRACT (Non-DOE)

SUB-CONTRACTOR (S): None' YES /

/

NO /X /

1 PROJECTED PERIOD OF PERFORMANCE START: 01/01/85 END: 10/1/88

~

PRpJECTED FINANCIAL DATA (000's)

FEE RECOVERABLE:

YES / /. ti0 / /

TOTAL CURRENT FY NEXT FY NEXT +1 NEXT +2 VALU E '-

BUDGET (85)

BUDG(86)

BUDG (87) BUDG (88) 170 60 45 45 20 APPLICATION (RELATE THE PROJECT TO A SPECIFIC PLANNED ACCOMPLISHMENT)

One of the conditions. imposed by the Commissioners on the Diablo#'anyon C

operating license required.that the Licensee (PG&E) revalidate the ground motion at the site. The U. S. Geological Survey is to perform analysis of the near field strong ground motion data base to provide the NRC staff with j

the ability to make an estimate of the Diablo Canyon ground motion independent of the licensee's work.

e em e.

1:tsfM1e-39/

6-f 'S 6

\\

j "j'

)

~

',1

. WORK REQUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED)

The USGS will-$ssist,the staff by accomplishing the fol. lowing:

Updatethestronggroundmotiondathbasetoincludeasmuchaspossibledata from distances less than.about 50 kilometers.

2. Perform both linear and non-linear regression analysis of the data base.to develop
  • attenuation equations for peak acceleration, peak velocity and spectral values for both horizontal and vertical components of ground motion. 3. Assess which parameters

.such as focal mechanism,embedment, site geology, topography, etc.,

significantly influence the ground motion. 4.' Make provisions in the predictive equations for accounting for significant parameters. 5. Prepare draft and final reports in which the data, the analysis technion and the results of the studies are presented in detail. 6. Attend meetings

~~

in Bethesda, MD CA and elsewhere, Washington, D.C., San Francisco, C4i" San Luis Obispo,

~

~

to present the status of research to the staff, ACRS, Commission and to participate in the review of Licensee's efforts in this area.

MODIFICATIONS (DESCRIBE MAJOR CHAliGES TO THE PROJECT 9

9

~..

)

l

,,)

i

.'q

  • i

.JUSilFICAT10t[ FOR LICEllSE FEE RECOVERABILITY

~

~

C0t1PLETE AS APPLICABLE -

Recomended:

Endorsed:

Endorsed:

Endorsed:

Appr5ed:

PROJECT MGR.

SECTION LDR BRAtlCH CHF ASST DIR.

DIV. DIR.

f/ty.H. Lefevrf/y 7/fy S. Brocoum

'e L. Reiter S. Brocoum J. Kniaht R.Vollmfinitials)

$h0l[?

(Date) e FOTA %-39/

L A ~l%

.