Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207J844 + (ML20207J844)
- ML20207J846 + (ML20207J846)
- ML20207J849 + (ML20207J849)
- ML20207J850 + (ML20207J850)
- ML20207J852 + (ML20207J852)
- ML20207J853 + (ML20207J853)
- IR 05000440/1986014 + (ML20207J854)
- ML20207J855 + (ML20207J855)
- ML20207J858 + (ML20207J858)
- ML20207J860 + (ML20207J860)
- ML20207J864 + (ML20207J864)
- IR 05000338/1986026 + (ML20207J865)
- ML20207J866 + (ML20207J866)
- ML20207J868 + (ML20207J868)
- ML20207J871 + (ML20207J871)
- ML20207J872 + (ML20207J872)
- PNO-II-86-049, on 860711,earth Tremor Measuring 3.7 on Richter Scale Occurred in Dalton,Ga.No Seismic Monitor Alarms Received.No Damage Occurred to Plant.Remote Seismic Monitoring Instruments Being Checked + (ML20207J875)
- ML20207J876 + (ML20207J876)
- IR 05000267/1986008 + (ML20207J877)
- ML20207J878 + (ML20207J878)
- ML20207J879 + (ML20207J879)
- ML20207J880 + (ML20207J880)
- TXX-4931, Forwards Revised Overview Quality Team Program for Comanche Peak Response Team Activities, in Response to 860609 Request for Action on Items Re Activities of Overview Quality Team + (ML20207J883)
- ML20207J884 + (ML20207J884)
- ML20207J887 + (ML20207J887)
- ML20207J889 + (ML20207J889)
- ML20207J890 + (ML20207J890)
- ML20207J892 + (ML20207J892)
- ML20207J893 + (ML20207J893)
- 05000412/LER-1988-012-01, :on 880822,control Room Air Pressurization Sys Actuated.Caused by Oxidizing Gas Release.Air Compressor Placed in Svc for Repressurization + (ML20207J894)
- ML20207J898 + (ML20207J898)
- ML20207J899 + (ML20207J899)
- ML20207J901 + (ML20207J901)
- ML20207J904 + (ML20207J904)
- ML20207J905 + (ML20207J905)
- ML20207J907 + (ML20207J907)
- ML20207J908 + (ML20207J908)
- IR 05000373/1999001 + (ML20207J909)
- ML20207J910 + (ML20207J910)
- ML20207J911 + (ML20207J911)
- ML20207J913 + (ML20207J913)
- ML20207J915 + (ML20207J915)
- ML20207J917 + (ML20207J917)
- ML20207J918 + (ML20207J918)
- BECO-88-138, Responds to NRC Bulletin 88-007, Power Oscillations in Bwrs. Search of Plant Design Changes Concluded That,Except for Upgrade of Original Control Room Recorders,No Mods Made to GE-supplied Neutron Monitoring Sys Which Affect Response + (ML20207J919)
- IR 05000424/1986038 + (ML20207J921)
- NRC-88-3371, Forwards Proprietary & Nonproprietary Amend 4 to RESAR-SP/90 Pda Module 1, Primary Side Safeguards Sys. Application for Withholding & Affidavit Also Encl. Proprietary Amend 4 Withheld (Ref 10CFR2.790) + (ML20207J923)
- ML20207J924 + (ML20207J924)
- ML20207J925 + (ML20207J925)
- ML20207J926 + (ML20207J926)
- 3F0786-17, Forwards Responses to Questions 1,2 & 4 Re 850725 & 1219 Fire Protection Evaluation Submittals.Question 3 Being Reevaluated.Equipment Operability Requirements Sufficient for Fire Protection During Shutdown Modes + (ML20207J927)