MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
. .
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 AND 2 OVERVIEW QUALITY TEAM PROGRAM FOR COMANCHE PEAK RESPONSE TEAM ACTIVITIES JULY 23, 1986 Ek s John Y. Streeter, Chairman CPRT-0QT eph F." Artuso, CPRT-0QT Larry W db6ckie 7CPRT-OQT 5 - 9 e- / ,
Jame's V. Nee 1y, CPRT-0QT ,J es R. We11s, CPRT-0QT TEXAS UTILITIES GENERATING COMPANY A DIVISION OF TEXAS UTILITIES ELECTRIC COMPANY O 45 PD PDR PAGE 1 0F 7
^ REVISED 7/23/86
1.0 Purpose and Objectives The purpose of the Overview Quality Team (0QT) is to support the Senior Review Team (SRT) by supplementing the Comanche Peak- Response Team (CPRT) quality assurance efforts to provide further assurance that the CPRT Quality Assurance Program as described in Appendix C of the CPRT Program Plan is effectively implemented. The OQT will function until such time that the SRT concludes that the level of CPRT activities no longer justifies the need for the OQT. The OQT will accomplish its purpose by providing an evaluation of the implementation of the CPRT QA Program relative to achievement of the following objectives:
Adequacy and completeness of QA procedures necessary to accomplish the overall QA Program objectives.
Adequacy of training and qualification of personnel involved in the auditing and surveillance processes.
Adequacy of frequency, timeliness and thoroughness of QA surveillance and audits necessary to assure that both the form and substance of QA Program elements are fully evaluated.
Conduct of QA activities in accordance with applicable industry standards and practices.
The quality of the following activities is assured by other measures instituted by the SRT and these activities are not within the scope of the OQT:
SRT activities.
Technical review of Results Reports, Assessment of CPRT program adequacy.
The OQT overview of the implementation of ISAPs and DSAPs is intended to be an in process review of ongoing implementation activities, including the ongoing files review efforts of the Results Report and Working Files Review Committee. Therefore, the OQT will not conduct reviews of the implementation of an ISAP or DSAP after the Results Report has been submitted to SRT for review and approval unless such reviews are directed by the SRT.
PAGE 2 0F 7 REVISED 7/23/86
2.0 Relationship of OQT and SRT The OQT will receive direction from the SRT. Direction will be given in the form of memoranda, oral instructions given. during meetings between the OQT and SRT, .and through correspondence cand discussions .between the Chairmen of the SRT and OQT acting in behalf of their respective teams.
For administrative ease, during periods between formal OQT meetings _ the direction from the SRT will generally be of the latter form.
3.0 General Description of OQT Program The activities and methods utilized by the OQT to accomplish its purpose ~ are identified in the following sections.
During the period of time OQT is functioning, each type of activity subject to OQT overview will be overviewed at least. once. Those activities deemed by the SRT or OQT to warrant increased attention will receive more overview from the OQT.
3.1 Interviews and Reviews of Personnel Records Interviews of selected members of the CPRT staff will be conducted to discuss their responsibilities and the means used to achieve the quality assurance objectives. . Interviews will include, but will not necessarily be limited to, the following individuals:
CPRT Program Director, Review Team Leaders, Issue Coordinators, Inspectors, QA Managers, and QA Auditors OQT will also review the records of selected personnel, and interview if necessary, to determine if they are adequately qualified and trained to perform their assigned tasks, and that they can perform them objectively and without influence from prior organizational affiliations.
PAGE 3 OF 7 REVISED 7/23/86
3.2 Procedure Reviews Selected procedures will be reviewed to determine if the procedures, when properly implemented, will achieve the objectives of the QA Program. Such reviews will determine if commitments in selected action plans are adequately addressed in the procedures, and whether the procedures adequately provide for or specify the necessary organizational structure, interfaces, record requirements, work processes, review and approval processes, document control, file content and retrievability requirements.
3.3 Audit Plans and Record Review OQT will review selected audit plans for the purpose of assessing the adequacy of audit frequency, timeliness, and thoroughness. OQT will discuss any desired additions or changes with the Design Adequacy Program (DAP) and Quality of Construction (QOC) Program Review Team Leaders and QA Managers.
Any areas of disagreement will be referred to the SRT for resolution.
Records generated for all audits conducted by the QA organizations of the DAP and QOC Program review teams will be reviewed by the OQT to deteruine if the audit objectives were achieved, and if the responses and corrective actions taken in response to those audits are complete and adequate.
3.4 Supplemental Auditors or Inspectors Should OQT concerns develop relative to the adequacy of the frequency, timeliness, or thoroughness of the audits, OQT will provide additional auditors and inspectors to serve as members of selected audit teams. Those inspectors and auditors will work under the direction of the DAP and QOC Program audit team leaders.
3.5 Observation of Audits OQT members will participate as observers of selected audits conducted by the QA organizations of the DAP and QOC Program review teams to obtain direct knowledge of the quality of the conduct of the audits.
PAGE 4 0F 7 REVISED 7/23/86
)
3.6 Direct Observation of Overview Inspection Activities OQT will perform direct observations of selected overview inspection activities to obtain direct knowledge of the quality of the conduct of those activities. The results of those direct observations will 'be compared to any related QA audit or surveillance results to assess -the effectiveness of the QA Program audit and surveillance activities.
3.7 Problem Resolution OQT will directly interface with Review Team Leaders to discuss and to achieve resolution of problems.
k'henever resolutions are not achieved, such issues will be referred to the SRT for resolution. k'heneve r timely resolution of Audit Action Requests, Corrective Action Requests, Corrective Action Reports, and OQT problems is not forthcoming, such issues will also be referred to the SRT for resolution.
3.8 NRC Inspection Report Review Available reports of all NRC inspections of CPRT QA activities and the responses and corrective actions taken which relate to those inspections will be reviewed by the OQT to identify information regarding the implementation of the CPRT QA Program.
3.9 Special Reviews l
Special reviews of CPR'I activities will.be conducted by the OQT as requested by the SRT.
3.10 Conduct of QA Activities OQT will review the work products of QA activities to determine if those activities are conducted in accordance with applicable industry standards and practices. Such work products include the products of audits, overview inspections, resolutions to problems as discussed in preceding sections.
PAGE 5 0F 7 REVISED 7/23/86
3.11 Open item Tracking Each OQT open item will be tracked by OQT to closure.
This will be accomplished by including a tabulation of all open items in each OQT periodic progress and status report which will indicate the action parties and due dates. Recommendations by the OQT to the SRT will likewise be tracked on the OQT open item list.
3.12 Exit Interviews ,
OQT exit interviews will be conducted with members of the SRT, or SRT appointed representatives, and Review Team Leaders, or their appointed representatives, to present the OQT observations and recommendations. The exit interviews will normally be held at or near the end of each formal meeting period.
3.13 Schedule A schedule of OQT activities will be prepared for the upcoming three-month period. This schedule will be reviewed and updated monthly and a copy will be attached to each OQT periodic progress and status report.
4.0 Periodic Progress and Status Reports Reports summarizing the progress and status of the OQT effort, reviews, observations and conclusions will be prepared periodically, approximately on a monthly basis, and will be submitted to the Chairman of the SRT with copies to the other SRT members, the Review Team Leaders, and the TUGC0 Executive Vice President Nuclear Engineering and Operations (NEO). The periodic progress and status reports will include an executive summary highlighting the important observations and recommendations, plus a tabulation of all open items and a copy of the updated OQT schedule.
PAGE 6 0F 7 REVISED 7/23/86
5.0 Final Report At the conclusion of the OQT program, a final report will be prepared by the OQT summarizing the results presented in the periodic progress and status reports and will be submitted to the Chairman of the SRT with copies to the other SRT members, Review Team Leaders, and the TUGC0 Executive Vice President, NEO. The final report will present the results of the entire OQT effort in providing additional assurance that all QA organiz.ations have adequately implemented their respective QA programs.
The final report will include an overall evaluation of the effectiveness of the CPRT QA Program implementation based on an OQT assessment of the degree of achievement of the four objectives stated in Section 1.0.
i PAGE 7 0F 7 REVISED 7/23/86