Confirms 860620 Telcon Re Util Response to Notice of Violation 86-08B.Paragraph B, Failure to Control Design Changes Contains Error.Revised Statement Submitted
ML20207J904
Person / Time
Site: Fort Saint Vrain 
Issue date: 06/24/1986
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20207J881 List:
References
P-86437, NUDOCS 8607290290
Download: ML20207J904 (2)


Text

I

'$ A' Public Service-

.ii. s.-i.

Company of Colorado 16805 WCR 19 1/2, Platteville, Colorado 80651 June 24, 1986 Fort St. Vrain Unit No. 1 P-86437 2@20M2 >

Regional Administrator Attn:

Mr. J. E. Gagliardo, Chief Reactor Projects Branch M l l IM Region IV U.S. Nuclear Regulatory Commission

~

p 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Docket No. 50-267

SUBJECT:

I & E Inspection Report 86-08B

REFERENCE:

(IT NRC Letter, Gagliardo to Walker, dated 05/19/86 (G-86265)

(f) PSC Letter, Gahm to Gagliardo, dated 06/17/86 (P-86427)

Dear Mr. Gagliardo:

This letter is to document the telepaone conversation between Mr. Craun, Mr. Holmes and Mr.

Jaudon onducted on June 20, 1986 concerning PSC's response to the Notice of Violation 86-08B.

Paragraph 8, " Failure to Control Design Changes", contains an error and the revised statement is hereby submitted.

As stated in PSC's Letter of Response dated June 17, 1986, the following statement was made in error:

"...Since the CN/CN reissue required box was incorrectly checked "No",

subsequent reviews which occur during the "As Built Verification" process would not have found that a CN/CN reissue was required.

gR07290290 860723 g

ADOCK 05000267 PDR 1'~ b l h

_m.

i 4

e *'

v.

P-86437 June 24, 1986 Since the "As Built Verification" (ABV) process at Fort St. Vrain is a field walkdown and verification that the field matches-the design documentation, the ABV process would have found and corrected the deficiency.

Consequently, the above referenced statement should be revised as follows:

"Even though the CN/CN reissue required box was incorrectly checked "No" on the CN-1902 CWP/DR and CN-1798A was referenced to perform the document update, subsequent reviews which occur during the "As Built Verification" process (not yet completed at the time of issuance of the violation) would have found that a CN/CN reissue was required."

Should you have any further questions, please contact Mr. M. H. Holmes at (303) 480-6960.

4 Sincerely,

/d /

J. W. Gahm Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station l

i JWG/gim i