Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207J180 + (ML20207J180)
- ML20207J182 + (ML20207J182)
- 05000400/LER-1986-008-03, :on 861206,digital Rod Position Indication Sys Not Operable During Power Ascension Test.Caused by Failure to Review Procedure Against Requirements of Tech Spec Special Test Exception 3.10.5 + (ML20207J183)
- ML20207J186 + (ML20207J186)
- ML20207J187 + (ML20207J187)
- ML20207J188 + (ML20207J188)
- ML20207J189 + (ML20207J189)
- NUREG/CR-6592, Forwards Copies of ORNL Final Rept, Evaluation of Terminated Nuclear Matl Licenses, NUREG/CR-6592,for Distribution to Commissioners.W/O Rept + (ML20207J192)
- ML20207J193 + (ML20207J193)
- ML20207J195 + (ML20207J195)
- 05000285/LER-1988-017, :on 880708,discovered That Special Rept on Fire Barrier Inoperability,Required by Tech Spec 5.9.3,not Submitted.Caused by Lack of Procedural Responsibilities & Controls for Fire Protection + (ML20207J199)
- ML20207J200 + (ML20207J200)
- ML20207J201 + (ML20207J201)
- ML20207J202 + (ML20207J202)
- ML20207J203 + (ML20207J203)
- ML20207J205 + (ML20207J205)
- IR 05000424/1986126 + (ML20207J206)
- ML20207J208 + (ML20207J208)
- IR 05000312/1986026 + (ML20207J209)
- ML20207J210 + (ML20207J210)
- ML20207J211 + (ML20207J211)
- ML20207J212 + (ML20207J212)
- RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air + (ML20207J213)
- ML20207J216 + (ML20207J216)
- ML20207J217 + (ML20207J217)
- ML20207J218 + (ML20207J218)
- ML20207J219 + (ML20207J219)
- ML20207J220 + (ML20207J220)
- ML20207J221 + (ML20207J221)
- IR 05000416/1988015 + (ML20207J224)
- ML20207J226 + (ML20207J226)
- ML20207J227 + (ML20207J227)
- 05000382/LER-1986-012, :on 860625,discovered That Surveillance for Fire Doors D221 & D222 Not Performed on Daily Basis.Caused by Lack of Interdepartmental Communication.Procedure OP-903-001 Revised + (ML20207J228)
- 05000213/LER-1986-026, :on 860622,while in Mode 1,reactor Trip Occurred When Power Increased Above 10%.Caused by Ceiling Tile Stuck in Relay,Causing RCS Low Flow Indication.Debris Removed & Scram Circuits Tested + (ML20207J229)
- ML20207J231 + (ML20207J231)
- TXX-6202, Forwards Payment of Civil Penalty in Amount of $50,000 for App B Violations Noted in + (ML20207J232)
- IR 05000295/1988001 + (ML20207J233)
- IR 05000423/1986009 + (ML20207J234)
- ML20207J235 + (ML20207J235)
- ML20207J236 + (ML20207J236)
- BECO-86-103, Notifies of Elimination of Position of Nuclear Senior vice- President & Creation of Chief Operating Officer to Handle Nuclear Organization.Tech Spec Change Will Be Submitted + (ML20207J238)
- ML20207J239 + (ML20207J239)
- ML20207J240 + (ML20207J240)
- ML20207J241 + (ML20207J241)
- 05000275/LER-1984-039, :on 840229,Mode 4 Entered W/O Meeting Surveillance Requirements of Tech Spec 3.8.3.1.On 831028, Insufficient Load Applied to 125-volt Battery 1-3.Caused by Lack of Instructions.Procedure Revised + (ML20207J242)
- ML20207J245 + (ML20207J245)
- ML20207J246 + (ML20207J246)
- ML20207J247 + (ML20207J247)
- ML20207J248 + (ML20207J248)
- ML20207J250 + (ML20207J250)
- ML20207J251 + (ML20207J251)