Forwards Insp Rept 50-400/86-76 on 860922-26,1006-10 & 1103- 07 & Notice of Violation.Attention to Unresolved Items Requested.Licensee Oral Commitments Documented in Rept
ML20207J235
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/29/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207J237 List:
References
NUDOCS 8701080353
Download: ML20207J235 (2)


See also: IR 05000400/1986076

Text

- _ _

.

December 29, 1986

Docket No. 50-400

License No. CPPR-158

Carolin Power and Light Company

ATTN: r. E. E. Utley

Senior Executi?e Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N0. 50-400/86-76)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by )

F. R. McCoy on September 22-26, October 6-10, and November 3-7, 1986. The

inspection included a review of activities authorized for your Shearon Harris

facility. At the conclusion of the inspection, the findings were discussed with

those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of Viola-

tion.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The enclosed Inspection Report documents oral commitments (see paragraphs 6,

7,10, and 11) made by a licensee representative and discussed in the exit

interview. If your understanding of this commitment differs from the report

statements, please inform this office promptly.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and

any reply will be placed in the NRC Public Document Room. If you wish to

withhold information contained therein, please notify this office by telephone

within ten days of the date of this letter and submit a written application to

8701090353 861229

PDR ADOCK 05000400

0 PDR

TED\

- - --------

-

.

.

Carolina Power and Light Company 2 December 29, 1986

withhold information contained therein promptly thereafter. Such application

must be consistent with the requirement of 10 CFR 2.790(b)(1). If we do not hear

from you in this regard within the period specified above, this letter, its

enclosures, and any reply will be made available to the public and be placed in

the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by D. Verrelli)

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

pc w/encls:

R. A. Watson, Vice President

y/ Harris Nuclear Project

J). L. Tibbitts, Director of Regulatory

/ Compliance

VJ. L. Willis, Plant General Manager

cc w/encis:

. Barth, OGC

). Moore,0GC

s/NRC Resident Inspector

Document Control Desk

State of North Carolina

RII RII i RII

RI.I]

.( , h'*

RI '

RI

) (W'

FMc'7,Coyr s MS I ek C 1 an V ra F 'dkson DVerrelli

12/4r/86 12/g ' 6 12/gt//86 12/gt86 g'12/act/86 12/p/86