Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207D066 + (ML20207D066)
- ML20207D067 + (ML20207D067)
- ML20207D069 + (ML20207D069)
- ML20207D071 + (ML20207D071)
- ML20207D072 + (ML20207D072)
- ML20207D073 + (ML20207D073)
- ML20207D075 + (ML20207D075)
- ML20207D076 + (ML20207D076)
- ML20207D081 + (ML20207D081)
- ML20207D082 + (ML20207D082)
- ML20207D086 + (ML20207D086)
- 05000410/LER-1986-015-01, :on 861203,reactor Scram Occurred While in Shutdown Mode.Caused by Reactor Protection Sys Power Supplies Inadvertently Cross Connected,Resulting in Loss of Power.Design Change Built Into MSIV + (ML20207D087)
- ML20207D088 + (ML20207D088)
- 05000413/LER-1999-007, :on 990426,operation Prohibited by TS 3.4.7 Was Noted Due to Inoperable Train of Rhr.Caused by Inadequate Work Sequencing.Returned B Train RHR to Operable Status by Restoring Power to Valve 1NI136B + (ML20207D089)
- ML20207D090 + (ML20207D090)
- ML20207D091 + (ML20207D091)
- ML20207D093 + (ML20207D093)
- ML20207D095 + (ML20207D095)
- ML20207D096 + (ML20207D096)
- ML20207D100 + (ML20207D100)
- ML20207D102 + (ML20207D102)
- NOC-AE-000433, Forwards Change QA-039 to Rev 13 of Operations QA Plan, Reflecting Next Phase of Organizational Realignment for STP Nuclear Operating Co.Change Does Not Represent Reduction in Commitment of Plan,Per 10CFR50.54(a) + (ML20207D103)
- ML20207D104 + (ML20207D104)
- ML20207D105 + (ML20207D105)
- 05000328/LER-1983-097, :on 830717,containment Sump Level Channel Declared Inoperable Due to Possible Air Bubble in Ref Leg to Transmitter.Transmitters Replaced W/Double O-Ring Transmitters + (ML20207D107)
- ML20207D110 + (ML20207D110)
- ML20207D112 + (ML20207D112)
- ML20207D115 + (ML20207D115)
- IR 05000397/1986028 + (ML20207D117)
- ML20207D118 + (ML20207D118)
- ML20207D119 + (ML20207D119)
- ML20207D121 + (ML20207D121)
- 05000301/LER-1986-008, :on 861128,reactor Tripped During Beginning of Life Physics Test.Caused by Low Water Level in Steam Generator A.Event Will Be Discussed in Normal Training Cycle for Licensed Operators in Next Training Cycles + (ML20207D123)
- ML20207D125 + (ML20207D125)
- ML20207D126 + (ML20207D126)
- ML20207D130 + (ML20207D130)
- ML20207D132 + (ML20207D132)
- ML20207D134 + (ML20207D134)
- 05000410/LER-1986-010-01, :on 861123,25% of Control Rods Received Full Scram Signal When All Group 2 Control Rod Solenoid Valves de-energized.Cause Undetermined.Investigation in Form of Supervisory Procedure S-SUP-1 Begun + (ML20207D136)
- ML20207D137 + (ML20207D137)
- ML20207D138 + (ML20207D138)
- ML20207D140 + (ML20207D140)
- L-86-205, Forwards Monthly Operating Repts for Apr 1986 & Revised Monthly Operating Rept for Mar 1986 + (ML20207D141)
- ML20207D142 + (ML20207D142)
- ML20207D144 + (ML20207D144)
- PNO-II-99-019, on 990518,unanalyzed Nuclear Safety Condition Involving Storage of Contaminated Processing Equipment Was Identified.Licensee Is Assembling Investigation Team to Determine Root Cause & Corrective Actions + (ML20207D145)
- ML20207D150 + (ML20207D150)
- ML20207D152 + (ML20207D152)
- ML20207D154 + (ML20207D154)
- ML20207D155 + (ML20207D155)
- ML20207D156 + (ML20207D156)