Text
- .
e.
):
Q F 3_ g B
V 1ey Power Staton Sh ppingport. PA 150770)04 h
%cw Gmup iathc4352%
July 26, 1988 U
S.
Nuclear Regulatory Commission ttn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 147/2 Revision 1 Gentlemen:
Enclosed are:
1.
An application for a
revision to our previous Amendment request to the above Operating Licenses to revise the Action statements listed for the Reactor Trip Breakers in Table 3.3-1.
This change was reviewed by the OSC and ^9C and determined to be safe and does not involve an unreviewed safety question.
2.
Documents designated Attachments A, B and C which setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.
This is a
revision to a previous submittal for which a license amendment application fee has been paid, therefore, no additional application fee is required.
Very truly yours,
. D. Sieber l
Vice President Nuclear Group 8808150235 880726 Ok PDR ADOCK 05000334 0
P PNU
B2avor Valloy Powar Station, Units 1 and 2 "Propossd' Operating License Change Request Page 2 I
cc:
Mr.,J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Project Manager Director, Safety Evaluation & Control (VEPCO)
Mr. T. M. Gerusky, Director BRP/ DER Mr. R. Janati, BRP/ DER
-