Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206J102 + (ML20206J102)
- 05000354/LER-1998-008-01, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a + (ML20206J104)
- ML20206J105 + (ML20206J105)
- ML20206J106 + (ML20206J106)
- ML20206J109 + (ML20206J109)
- 05000302/LER-1988-020, :on 881012,hydraulic Snubber RCH-81 Found Disconnected at Piping End.Snubber Removed to Allow Maint on Adjacent Valve on 871119.Snubber Reinstalled.Procedure Revised for Tracking Purpose + (ML20206J111)
- ML20206J112 + (ML20206J112)
- ML20206J113 + (ML20206J113)
- ML20206J114 + (ML20206J114)
- PNO-III-86-061, on 860622,reactor Tripped as Result of Signal Showing MSIV Not Fully Open.Caused by Failed Relay in MSIV Circuitry Giving Incorrect Indication.Relay Replaced & Tested + (ML20206J117)
- ML20206J119 + (ML20206J119)
- ML20206J120 + (ML20206J120)
- ML20206J121 + (ML20206J121)
- ML20206J124 + (ML20206J124)
- ML20206J125 + (ML20206J125)
- ML20206J126 + (ML20206J126)
- ML20206J127 + (ML20206J127)
- ML20206J130 + (ML20206J130)
- ML20206J131 + (ML20206J131)
- RBG-23914, Forwards Rev 4 to Preservice Insp Plan Submitted on 841105. Submittal Contains 860512 Relief Request & Text Changes Identified for Rev 4.Fee Paid,Per RM Diggs 860609 Request to Cahill + (ML20206J132)
- ML20206J135 + (ML20206J135)
- PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized + (ML20206J136)
- ML20206J137 + (ML20206J137)
- ML20206J141 + (ML20206J141)
- ML20206J142 + (ML20206J142)
- PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions + (ML20206J144)
- 05000285/LER-1987-003, :on 870307,while Performing Main Steam Safety Valve Test,Three Safety Valves Failed to Lift within Plus/ Minus 1% of Nameplate Setpoint.Caused by Normal Drift.Valves Recalibr & Tested + (ML20206J145)
- ML20206J146 + (ML20206J146)
- ML20206J147 + (ML20206J147)
- ML20206J148 + (ML20206J148)
- IR 05000454/1988020 + (ML20206J149)
- ML20206J150 + (ML20206J150)
- ML20206J154 + (ML20206J154)
- LIC-99-0028, Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage + (ML20206J157)
- ML20206J160 + (ML20206J160)
- ML20206J161 + (ML20206J161)
- ML20206J166 + (ML20206J166)
- ML20206J167 + (ML20206J167)
- ML20206J170 + (ML20206J170)
- ML20206J172 + (ML20206J172)
- IR 05000155/1988022 + (ML20206J173)
- ML20206J175 + (ML20206J175)
- CEO-88-124, Forwards forty-five Day Submittal for Rancho Seco 1988 Annual Exercise & Dress Rehearsals + (ML20206J180)
- ML20206J182 + (ML20206J182)
- ML20206J184 + (ML20206J184)
- ML20206J186 + (ML20206J186)
- ML20206J187 + (ML20206J187)
- ML20206J188 + (ML20206J188)
- ML20206J189 + (ML20206J189)
- ML20206J190 + (ML20206J190)
- ML20206J193 + (ML20206J193)