ML20206J184
| ML20206J184 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 06/23/1986 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Harold Denton, Tam P Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-6-067, 2NRC-6-67, TAC-62950, NUDOCS 8606270028 | |
| Download: ML20206J184 (1) | |
Text
,,
'Af Duquesm @
8eaver valley No. 2 Unit Project Organtration 2NRC-6-067 SEG ButIdi"9 (412) 643-5200
$ ho port. PA 15077 t 1 June 23, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Reaulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTI01:
Mr. Peter Tam, Project Manager Division of PWR Licensina - A Office of Nuclear Reactor Requi ation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Confirmatory Item No. 26 Gentl emen:
The i nstal l ation of the shunt trip attachment (S TA) on the breakers in the Reactor Trip Switchaear at Beaver Valley Unit No. 2 has been finished.
Althouah this eouinment has not yet been turned over to Duquesne Liaht Comoany from the NSSS vendor oraanization, the STA modification was compl eted by FCN OMWM-10610 and is in el ace at Beaver Valley Unit No. 2.
This notification comol et es a confirmatory item request identified in Section 7.2.2.3 of the Reaver Valley Unit No. 2 Safety Evaluation Reoort.
DUQUESNE LIGHT C0dPANY 8
B g62 g g gg8g$312 By
{
PDR J.'d. Carev Vice President RWF/ijr NR/STA/RTS cc:
Mr. Peter Tam, NRC Pro.iect Manaaer Mr. L. Prividv, NRC Resident Insoector 1\\o
,