- PNO-III-86-013, on 860219,both Unit 2 Diesel Generators & Units 1 & 2 Shared Diesel Declared Inoperable.Cause Undetermined.Partially Closed Fuel Line Valve on Diesel Generator 2A Discovered.Generators Retested + (ML20205K268)
- ST-HL-AE-2014, Forwards Updated Info Re App R & Fire Hazards Analysis Rept, Per Commitment Made During 870318 Meeting W/Nrc.Encls Describe Deviation to App a & R Identified to Date. Compliance W/Nfpa Codes Not within Scope of Submittal + (ML20205K273)
- ML20205K279 + (ML20205K279)
- ML20205K280 + (ML20205K280)
- ML20205K282 + (ML20205K282)
- ML20205K283 + (ML20205K283)
- ML20205K288 + (ML20205K288)
- ML20205K291 + (ML20205K291)
- ML20205K296 + (ML20205K296)
- ML20205K297 + (ML20205K297)
- IA-99-158, FOIA Request for Copy of P Bollwerk Rept Re Investigation Into Jan 1996 Layoffs at Millstone Nuclear Power Station in Waterford + (ML20205K298)
- ML20205K298 + (ML20205K298)
- ML20205K300 + (ML20205K300)
- ML20205K303 + (ML20205K303)
- ML20205K304 + (ML20205K304)
- ML20205K307 + (ML20205K307)
- 05000369/LER-1999-001-04, :on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review + (ML20205K308)
- ML20205K310 + (ML20205K310)
- PNO-I-87-023, on 870323,reactor Critical Following 5-month Outage.Remote Shutdown Panel Test Conducted on 870322.Steam Generator Instruments Monitored Due to Lack of Agreement + (ML20205K311)
- ML20205K312 + (ML20205K312)
- ML20205K314 + (ML20205K314)
- PNO-I-88-112, on 881027,33 Patients Received Therapy Treaments in Excess of 10% of Prescribed Dose.Caused by Lack of Incorporating New Source Into Computer Program Used for Treatment Planning.Inspector from State of MD Sent to Site + (ML20205K315)
- ML20205K317 + (ML20205K317)
- U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With + (ML20205K322)
- ML20205K324 + (ML20205K324)
- ML20205K326 + (ML20205K326)
- ML20205K327 + (ML20205K327)
- CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use + (ML20205K328)
- NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with + (ML20205K330)
- ML20205K332 + (ML20205K332)
- ML20205K334 + (ML20205K334)
- ML20205K335 + (ML20205K335)
- PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With + (ML20205K337)
- ML20205K338 + (ML20205K338)
- ML20205K340 + (ML20205K340)
- B11999, Forwards BAW-1878, Haddam Neck Plant Technical Rept Supporting Cycle 14 Operation. Cycle 14 Tech Spec Operating Limits Submitted W/Reload License Amend Request Still Valid & Supported by Revised Fuel Burnups + (ML20205K343)
- ML20205K344 + (ML20205K344)
- ML20205K345 + (ML20205K345)
- ML20205K346 + (ML20205K346)
- ML20205K350 + (ML20205K350)
- ML20205K351 + (ML20205K351)
- ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld + (ML20205K352)
- ML20205K353 + (ML20205K353)
- ML20205K355 + (ML20205K355)
- ML20205K356 + (ML20205K356)
- ML20205K358 + (ML20205K358)
- ML20205K359 + (ML20205K359)
- ML20205K360 + (ML20205K360)
- ML20205K361 + (ML20205K361)
- ML20205K362 + (ML20205K362)
- ML20205K363 + (ML20205K363)