Forwards Proprietary Request for Addl Info Re Erpi Proprietary Rept Bwrvip,Standby Liquid Control Line Repair Design Criteria (BWRVIP-53), TR-108716,July 1998,submitted by 980702 Application.Encl Withheld
ML20205K280
Person / Time
Issue date: 04/07/1999
From: Carpenter C
NRC (Affiliation Not Assigned)
To: Terry C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20137H190 List:
References
TAC-MA2328, NUDOCS 9904130085
Download: ML20205K280 (4)


Text

9 April 7, 1999 h

Cart ierry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF "BWR VESSEL AND INTERNALS PROJECT, STANDBY LIQUID CONTROL LINE REPAIR DESIGN CRITERIA (BWRVIP-53)," TAC NO. MA2328

Dear Mr. Terry:

By your application dated July 2,1998, you submitted for NRC the staff to review the Electric Power Research Institute (EPRI) proprietary report, "BWR Vessel and Internals Project, Standby Liquid Control Line Repair Design Criteria (BWRVIP-53), " EPRI report TR-108716,

)

July 1998. The BWRVIP-53 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.

The NRC staff has completed its preliminary review of the BWRVIP-53 report. As indicated in the enclosed request for additional information (RAl), the NRC staff has determined that additionalinformation is needed. We request that BWRVIP respond to the RAI as soon as possible, in order for the NRC staff to complete its review in a timely manner. Since the encisoed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary, as appropriate.

If you have any questions, please contact me at (301) 415-2169.

Sincerely, Original Signed By:

C. E. Carpenter, Jr., Lead Project Manager Component integrity Section Materials and Chemical Engineering Branch j

Division of Enginee,ing Office of Nuclear Reactor Regulation

\\

Enclosure:

As stated g

e cc:

See next page Distribution:

'3 10 1 g,S EMCB R/F KRWichman GHolahan WLanning, R1 f b-PUBLIC w/o Encl.

DGNaujock MEMayfield BMallet, R2 File Center KAKavanagh TYChang JGrobe, R3 f)

ACRS JRRajan AHowell, R4 )( l\\ h--N b DOCUMENT NAME: G:\\BWRVIP\\BWRVIPS3.RAI 97'f/

INDICATE IN BOX: *C"= COPY W10 ATTACHetENTIENCLOSURE, "F= COPY WIATT! ENCL, *@eNO COPY E % SC /

SI'tXQSC /

E EMCB Q E

EMCB1PM E

E CECarpenter J,RCaruk KAManK RAHE g 03/31/1999 7 [/1999 h

///1999 \\

J/Ip1999 pte OFFICIAL RECORD COPY

" J^' ^^"'tE IS PROPRIETARY 9904130085 990407 PDR TOPRP EXIE R 4 yd

\\

C' C) W k '

t_ S TL M B w t POL,

\\

O

r April 7, 1999 Carl Tony, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF "BWR VESSEL AND INTERNALS PROJECT, STANDSY LIQUID CONTROL LINE REPAIR DESIGN CRITERIA (BWRVIP-53)," TAC NO. MA2328

Dear Mr. Terry:

By your application dated July 2,1998, you submitted for NRC the staff to review the Electric Power Research Institute (EPRI) proprietary report, "BWR Vessel and Intemals ProjeM, Standby Liquid Control Line Repair Design Criteria (BWRVIP-53), " EPRI report TR-10871G,

' July 1998. The BWRVIP-53 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subjeci reactor components.

The NRC staff has completed its preliminary review of the BWRVIP-53 report. As indicated in the enclosed request for additional information (RAI), the NRC staff has determined that additional infor. nation is needed. We request that BWRVlP respond to the RAI as soon as possible, in order for the NRC staff to complete its review in a timely manner Since the encisoed concems a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary, as appropriate.

If you have any questions, please contact me at (301) 415-2169.

Sincerely, Original Signed By:

C. E. Carpenter, Jr., Lead Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reac+or Requistion

Enclosure:

As stated cc:

See next page Distribution:

EMCB R/F KRWiChman GHolahan WLanning, R1 PUBLIC w/o Encl.

DGNaujock MEMayfield BMallet, R2 File Center KAKavanagh TYChang

. irobe, R3 ACRS JRRajan AHowell, R4 DOCUMENT NAME: G:\\BWRVIP\\BWRVIPS3.RAI INDICATE IN BOK: *C"=CCJ'Y WlO ATTACHt(ENTfENCLOSURE, "F= COPY WIATTfENCL, *00 NO COPY 0

EMCB1PM E-S % SC /E E % SC /E EMCB M E

CECarpenter, J,RCarud KAManK RAHE g 03/31/1999 7 [/1999 \\

///1999 \\

J//@1999 g

OFFICIAL RECORD COPY ENCLOSURE IS PROPRIETARY k'_

ntig e

g k

4 UNITED STATES

,g g

NUCLEAR REGULATORY COMMISSION i

2 WASHINGTON, D.C. 20666 4 001

.....[

April 7, 1999 l

Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF "BWR VESSEL AND INTERNALS PROJECT, STANDBY LIQUID CONYROL LINE REPAIR DESIGN CRITERIA (BWRVIP-53)," TAC NO. MA2328

Dear Mr. Terry:

l By your application dated July 2,1998, you submitted for the NRC ctaff to review the Electric Power Research Institute (EPRI) proprietary report, "BWR Vessel and intemals Project, I

Standby Liquid Control Line Repair Design Criteria (BWRVIP-53)", EPRI report TR-108716, July 1998. The BWRVIP-53 repoit was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.

The NRC staff has completed its preliminary review of the BWRVIP-53 report. As indicated in the enclosed request for additionalinformation (RAl), the NRC staff has determined that additionalinformation is needed. We request that BWRVIP respond to the RAI as soon as possible, in order for the NRC staff to complete its review in a timely manner. Since the enclosed concerns a report that the Nr(C staff has found to be proprietary in nature, the requested information will also be considered proprietary, as appropriate.

If you have any questions, please contact me at (301) 415-2169.

Sincerely,

/

/

A C. E. Carpenter

., Lee roject Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

See next page ENCLOSURE IS PROPRIETARY L

l cc:

O George Jones, Executive Chairman Steve Lewis, Technical Chairman By/RVIP Assessment Task BWRVIP Assessment Task Pe1nsylvania Power & Light Entergy i

A6 1 P. O. Box 756 Tyo North Ninth Street Waterloo Road Allentown, PA 18101 Port Gibson, MS 39150 Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman BWRVIP inspection Task BWRVIP inspection Task PECO Energy Yankee Atomic 965 Chesterbrork Blvd.

580 Main Street MC 62C-3 Bolton, MA 01740

)

Wayne, PA 19087-5691 Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task BWRVIP Mitigation Task Southem Nuclear Operating Co.

Clinton Power Station, M/C T-31C 40 inverness Center Parkway P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 l

I Robert Carter, EPRI BWRVIP Vaughn Wagoner, Technical Chairman Assessment Manager BWRVIP Integration Task Greg Selby, EPRI BWRVIP Carolina Power & Light Company inspection Manager One Hannover Square 9C1 EPRI NDE Center P.O. Box 1551 P. O. Box 217097 Raleigh, NC 27612 1300 W. T. Harris Blvd.

Charlotte, NC 28221 Bruce McLeod. Technical Chairman BWRVIP Repair Task Southern Nuclear Operating Co.

Post Office Box 1295 40 inverness Center Parkway Birmingham, AL 35201 1

Warren Bilanin, EPr<l BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.

Palo Alto, CA 94303 l

l l

l