ML20205K353

From kanterella
Jump to navigation Jump to search
Provides History of Peer Review of Rept on Shipping Container Response to Severe Highway & Railroad Accident Conditions
ML20205K353
Person / Time
Issue date: 09/06/1985
From: Gillespie F
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Minogue R
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20205K177 List:
References
FOIA-88-378 NUDOCS 8811010080
Download: ML20205K353 (4)


Text

_ . . _ . -. -. - -- - _~ . -.- _ . - .

UNITED STATES

  • @* %,k NUCLEAR REGULATORY COMMiss10N W ASHINGTON, D. C. MS5
          • September 6, 1985 i  !

l 4

MEMORANDUM FOR: Robert B. Minogue Director i 2 Office of Nuclear Regulatory Research FROM: Frank P. Gilles i Director DivisionofRiskbalysisandOperations  !

l Office of Nuclear Regulatory Research .

I 5

SUBJECT:

PEER REVIEW OF LLNL REPORT ON SHIPPING CONTAINER RESPONSE l l TO SEVERE HIGHWAY AND RAILROAD ACCIDENT CONDITIONS  ;

t

! j This memorandum is in response to your request for a history of the subject l i peer review. The NRC need for the peer review dates back to early 1984 and j was confirmed at the December 10, 1984 status report meeting with NMS$ which r i

both you and John Davis attended. Since the LLNL work is intended to form the  !

basis of NRC efforts to demonstrate (in the public arena) the capabilities of licensed shioping casks to withstand severe accidents, the actual and perceived l 1 independence of any peer review was considered a major objective. Peer review [

by a university group not intimately involved with the safety issues associated ,

with radioactive material transportation was considered to meet this objective. j l The Denver Research Institute (ORI), University of Denver, had shown interest f

in previous NRC RFPs dealing with transportation of radioactive materials, i

. The University of Washington in St. Louis was known to have done work in the  !

hazardous material transportation field for DOT. Both were infomed of the  ;

details of NRC's efforts with Lt.NL and the intent to issue a grant to l i accomplish a peer review. The grant method of funding was selected to r further ensure independence. NPiSS has been aware of this process since last i i year and the subject was discussed at the May 1985 information exchange meeting i j between NRC and DOE (R. Cunningham in attendance) which was arranged by NMSS. l

, Botn universities responded with requests for federal assistance and, at one  !

l time, both were considered as possible grant recipients. The technical panel l

selected to consider the merits of the proposals included J. Cook, NHSS, and l q C. Belote and W. Lahs of RES. The panel detemined that DR1 was the better j of the two proposals. This selection, and the grant process, was justified I i before the Federal Assistance Board, whose recommendation you hate been asked to f j approve.

l 4 i d  ;

1  !

d

! 8011010000 881003 f i PDR FOIA i i AUDING8-378 PDR i

i 0

g, 0FFICE OF NUCLEAR REGULATORY RESEARCH CONCURRENCE SHEET GRANTS FEB 19 gg W. Lahs/C. Belot

}ROJECT Sh~AGER 4me

/

Date d

Aff[

p J . Mal a ro . \, c a 5_. k' < <t. 'ke Date 2 '

CS Reculatorv Analvsis '

BRANCH CHIE]

N. Price Date /#!b TECHNICAL /MGMT ASSISTANT FOR DRA0

/ '

R G. Burdick DEPUTY DIRECTOR FOR DRA0 Date 7/fM

(,ea .ti e e.

C@tTRACTCR: University of Denver Flh: G1090 TITLE: Peer Review of Report Entitled, "Shipping Container Response to Severe Highway and Railroad Accident Conditions" NEW D RtNtwAt 10 tat 1ERM: Three98 12/iS/86 h OTHER MODIFICATION DATES OF PERFORMANCE FOR THESE FUNDS 1 certify that funds are available for the above-referenced M[e t-in the amount of 5 for FY .

DISTR g *No-cost extension. -

Cire Chron -

RDG Forehand b TIN R.~ HAYES,, CHJEF Proj Nr: Lahs/Belote FIS AL PLANNING &A0NTROL BRANCH. PPCS T/MA:fMer OFFICE OF NUCLEAR REGULATORY RESEARCH RESID Wylbur Contractor Youcher File d /R( '. -

Office reg-[k E'SIDAO -

Surname Fofbid:jp Ernst Date V/ /86 4/li/86 ,

4 h/__

PART I

.. ng191966 U.S. Nuclear Regulatory Comission f* AA bN

  • RFAA(RequestforAssistanceAction) 3l Assistance Contr,oi No.:
4. TYPE OF ACT10h REQUESTED: (Check and INSTRUCTIONS: This form is to be CompleteAsAppropriate) used for Federal Assistance Requests to include Grants and []ExecuteaGrant.

Cooperative Agreements.

[ ] Execute a Cooperative Agreement SUBMIT the Completed Form to: [X] Execute a Modification to a Grant:

Grant No.: Grantee:

Ofrector Division of Contracts NRC-G-04-85-015 Univ. of Denver Office of Administration []ExecuteaH.dificationtoaCooperative Agreement.

Cooperative Agreement i:

Cooperator:

5. Title and Brief Description o'f Work (50 Word Sumary)

Peer Review of Report Entitled, "Shipping Container Response to Severe Highway and Railroad Accident Conditions" i

6. Attachments (Specify)
1. Memo from W.R. Lahs to W. Forehand, dated 1/23/86 l

\

I l

t t.b 1 9 198 5 7.. FUNDING

a. B&R Nurrber b. FIN c. APPNHumber(s) ,

601940 G1090 31X0200.606

d. FUNDS AVAILABILITY: This certifies that funds in the amount of

$ are available for obligation in the current budget for the above described work.

8. DATE SIGNED SIGNATUREOFCERTff1NGOFFICAL

>b1 2&

s,s

{ f / /

Martin R. Hayes, ' Chief ."

Fiscal Plannino & Contro Branch, PF-' S. RES

9. PROJECT OFFICER'S NAME: Mall STOP: TELEPHONE NUMBER:

William Lahs 1130SS 37874

10. REMARKS:

o Please mke a no-cost extension to this grant until 12/15/86.

o The reason for this extension is contained in Attachment 1 to this RFAA.

11. SIGNATURE - Selec ion Official or Representative DATE SIGNED N AtiE:

[M c-rnst

- _[

TITLE: Director  ;

DIVISION: of Risk Analysis and Operations I 0FFICE: of Nuclear Reculatory Research 1

l 1

l l

l 1