ML20205K359

From kanterella
Jump to navigation Jump to search
Informs That Grant NRC-G-04-85-015 Should Be Extended 9 Months Until 861215
ML20205K359
Person / Time
Issue date: 01/23/1986
From: Lahs W
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Forehand W
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20205K177 List:
References
CON-FIN-G-1090, FOIA-88-378 NRCG-04-85-015, NRCG-4-85-15, NUDOCS 8811010090
Download: ML20205K359 (1)


Text

-

.m g ' "'4g U%ITED STATES 1

NUCLEAR REGULATORY COMMisslord i

3 W ASMG TON. D. C. W,ll

/

January 23, 1986 MEMOPANDUM FOR:

William Forehand Fiscal Planning and Control Branch, Policy Planning and Cnntrol Staff Office of Nuclear Regulatory Research FRON:

William R. Lahn Regulatory Analysis and Faterials Risk Branch Division of Risk Analysis and Operations Office of Nuclear Regulatory Research

SUBJECT:

EXTENSION OF PERIOD OF PERFORMANCE FOR GRANT:

NRC-9-04-85-015 FIN G1090 The major element of the subject grant was a peer review of a NUREG/CR report entitled, "Shipping Container Response to Severe Highway and Railroad Accident Conditiens." This report was to have beer provided to the centractor/

grantee in Septerber 1985.

Current estimates are that this repcrt will not be available until March 1986, at the earliest. As a result, no wnrk has been initiated by the grantee and the original period of performance, 7/15/85 -

3/15/86, should be extended 9 months until 12/15/86. The scope of work and funding for this grant rentin uncha,'ged.

,S.2th Wil11 err P. Lahn Regulatory Analysis and Paterials Risk Branch Division of Risk Analysis er,d Operations Office of Nuclear Regulatory Research 8811010090 881003 I

PDR FOIA i

AUDIN88-37a PDR j

1 l

1 f

NRC-G-04-85-015 Division of Contracts g

"~

' ' ~ - ~

  • *
  • O'.5. Kuclear Regulatory Comnission 11001F1CA110;; HUMBER One (1)

NOTiflCATION Of GRANT EXECUil0N G NEW

@ H001fICATION TO:

William Forehand AUTHOR 12A110: NUMBER Title)

Office of Nucle (ar Regulatory RES-G #C-015 Research

~

6 ate ll(Organization)//

t 8d GRANT CHANGES PER THIS ACT10N T ROM. _.

6'

/

Date) l on Stewa'it Technical Contracts Branch no-cost extension i

t Division of Contracts, ADH EXECUT1'0N DATE GRA.'iTEE (Name & Address)

,g yg

-TYPE Of GRMilT I

University of Denver i

University Park, P.O. Box 10127 University Denver. CO 80210 PER100 df FERF0DKsCE

~ ' ~

i PROJECl TITLE 7/15/85 - 3/15/86 Peer Review of Report Entitled "Shipping Container Response to Severe Highway and Railroad AccideTit PRINCIPA'l INVE$11GA10g l

Conditions" Myran N. Plooste

~MC Aufd6RTTE REPRESENliflVI~ !

l William Lahs

~~~' l

~

~~ ~

~

B&R HUMBER FIN NUllBOi

  1. 10VNT NEW NRC FUNDS

$ TOTAL FY 8 6 FUNDING TOTAL NRC OBLIGATIONS S 69.545.00

.___ __ 1 A11 Atl01EN1(S):

l IQUIPMENT GRANT I)DCU':E NT (,,,, _,.,,

ft $4/5p*/-$-)-

u.,

d MOO!FICATION NO. 1 TO GRANT NO. NRC-G-04-85-015 BETWEEN UNIVERSITY OF DENVER AND THE U.S. NUCLEAR REGULATORY COMMISSION A.

The purpose of this modification is to change the grant period in Block j

No. 3 of the Notice of Grant Award.

i B.

Specifically of this Grant No NRC-G-04-85-015; Block No. 3; Grant Period, is extended through December 15, 1986, at no additional cost to the Government.

1 C.

All other tenns and conditions under this Grant remain the same.

l D.

In witness whereof, the parties have executed this document.

E.

The effective date of this modification shall be March 15, 1986.

UNITED STATES OF AMERICA Date:

'/////(

By:

A// Mm,

'/ /

aul Edge W th Gran Office V l

Technical Contracts Branch j

Division of Contracts i

GRANTEE-i Date:

/[ d By:

4 1

c

Title:

c,,,,, u,. m,...

Assistant Treasurer and t

Director of Sponsored i

',sgi.,

Agreements Services 4 -

8 l

f.

c'

[

  • i

,p.;

{. '., s

$WSW/(!(;