Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G030 + (ML20203G030)
- ML20203G032 + (ML20203G032)
- ML20203G033 + (ML20203G033)
- ML20203G035 + (ML20203G035)
- ML20203G037 + (ML20203G037)
- ML20203G038 + (ML20203G038)
- ML20203G040 + (ML20203G040)
- ML20203G042 + (ML20203G042)
- ML20203G045 + (ML20203G045)
- PNO-V-92-010, on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop + (ML20203G047)
- ML20203G048 + (ML20203G048)
- ML20203G049 + (ML20203G049)
- NOC-AE-000036, Special Rept:On 971111,valid Failure of Sdg 21 Occurred. Caused by Failed Governor Speed Setting Potentiometer.Sdg 21 Governor Speed Setting Potentiometer Replaced + (ML20203G050)
- ML20203G051 + (ML20203G051)
- PNO-II-92-053, on 920821,plant Experienced Safety Injection & Reactor Trip.Unit Being Cooled by Dumping Steam to Main Condenser.Cause of Low Pressure Safety Injection Being Investigated.State of Tn Informed + (ML20203G053)
- ML20203G055 + (ML20203G055)
- PNO-II-92-054, on 920822,plant Lost Offsite Power When Unit Startup Transformer Failed.Plant Currently in Hot Shutdown, W/Restart Expected Late Tonight.State of Sc Informed.Region Also Informed State & Other Federal Agencies + (ML20203G056)
- ML20203G057 + (ML20203G057)
- ML20203G058 + (ML20203G058)
- ML20203G060 + (ML20203G060)
- ML20203G063 + (ML20203G063)
- ML20203G064 + (ML20203G064)
- ML20203G067 + (ML20203G067)
- ML20203G070 + (ML20203G070)
- PY-CEI-NRR-0508, Forwards Perry Nuclear Power Plant-Unit 1,Offgas Sys Charcoal Adsorber Combustion Events Final Rept. Temp & Combustion Product Plots of 860706 & 0602 Events Also Encl + (ML20203G074)
- ML20203G075 + (ML20203G075)
- ML20203G076 + (ML20203G076)
- ML20203G079 + (ML20203G079)
- ML20203G080 + (ML20203G080)
- ML20203G081 + (ML20203G081)
- 05000482/LER-1997-015-01, Forwards LER 97-015-01 Which Documents That Violation of TSs Occurred Re Required ISI VT-3 Exams of Pressurizer Safety Valves,Per 10CFR50.73(a)(2)(i)(B) + (ML20203G087)
- ML20203G088 + (ML20203G088)
- ML20203G091 + (ML20203G091)
- ML20203G093 + (ML20203G093)
- ML20203G097 + (ML20203G097)
- ML20203G098 + (ML20203G098)
- ML20203G099 + (ML20203G099)
- ML20203G102 + (ML20203G102)
- ML20203G103 + (ML20203G103)
- ML20203G106 + (ML20203G106)
- ML20203G107 + (ML20203G107)
- ML20203G109 + (ML20203G109)
- ML20203G110 + (ML20203G110)
- IR 05000352/1997007 + (ML20203G111)
- ML20203G112 + (ML20203G112)
- 05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl + (ML20203G113)
- ML20203G115 + (ML20203G115)
- ML20203G116 + (ML20203G116)
- ML20203G117 + (ML20203G117)
- ML20203G121 + (ML20203G121)
- ML20203G122 + (ML20203G122)