Text
... _.
- - -.. - -. - - - - _. ~. - -.
~
&&W h
\\
p UNITED STATES
- ~
l g
NUCLEAR REGULATORY COMMISSION WASHINGTON, o.C. 3000 hem o,k I
February 23. 1998 4
LICENSEE:
COMMONWEALTH EDISON COMPANY FACILITIES: ZION NUCLEAR R)WER STATION, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF MEETING CONCERNING Pl.ANS AND PREPARATIONS TO IMPLEMENT THE ZION IMPROVED TECHNICAL SPECIFICATIONS i
On January 13,1998, the NRC staff met with Commonwealth Edison Company (Comed) at a public meeting at the Zion Station taalning facility to discuss Comed's preparations to implement the Zion improved Technical Specifications (ITS). The Zion ITS were approved by license i
amendment dated December 19,1997, which requires implementation before Unit 2 enters Mode 4, i
i At the meeting, Comed described the ITS training that has bean completed for operators, i
managers, and engineers. Comed a.*o described other preparations for implementation including: controls over relocated requirements; procedure and surveillance readiness; follow-up to industry experiences with ITS implementation; and reviews, self assessments and audits related to readiness to implement the Zion ITS. The major items remaining to be completed by Comed before implementation include, verification of the relocation of certain items from current Technical Specifications to licensee controlled documents, completion of remaining procedure i
revisions, and an audit and several checks on readiness to implement.
l No concems were identified with Comed proceeding with implementation following comnie; ion of their planned preparations. Comed has scheduled implementation of the Zion ITS for =iarch 20, 1996.
A list of attendees is provided as Enclosure 1..\\ copy of the handout provided by Comed at this meeting summarizing the licensee's presentation is included as Enclosure 2.
Subsequent to this meeting, on January 15,~ 1998, Comed announced that they were -
permanently ceasing operations at Zion N 3ar Power Station, Units 1 and 2. Because operations have ceased, Unit 2 will not enter Mode 4 and implementation of the ITS is not required. During a Febrt.ary 3,1998, meeting between Comed and NRC, and by letter dated l
I DFQ ' h 1
a 9803020177 900223 1
PDR ADOCK 05000295 P
PDR RU EECEDIER C8PY R.E.R.M..I.BlEl
.--------.-.--.2-.
A a m
. s
__gw.-.e-w-
.,s,*_,gg.,.,,..
.,,,.g,
-..,i._,-.-,,--4, y.
..yi9.p y
2-February 12,1998, Comed stated that they will not implement ITS and will continue to comph with their custom Technical Specifications.
Lawrence Rossbach, Project Manager Project Diredorate 1112
.i Division of Reactor Projects Office of Nuclear Reactor Regulation Docket Nos. 50-295 and 50-304
Enclosures:
- 1. Ust of Attendees
- 2. Ucensee's Presentation cc w/encls: See next page f
i 1
a.
i 1
2 February 23, 1998 J
February 12,1998, Comed stated that they will not implement ITS and will continue to comply j
with their custom Technical Specifications.
j Orig, signed by:
l Lawrence Rossbach 'roject Manager t
Project Directorate ill-2 i
Divisbn of Reactor Projects Office of Nuclear Reactor Regulation
. Docket Nos. 50-295 and 50-304
Enclosures:
- 1. List of Attendees
- 2. Licensee's Presentation l
. cc w/encis: See next page l_
DISTRIBUTION.
Hard Conv w/encls 1 & 2:
. JOedist File' PUCLIC-i PDill-2 R/F l
ACRS, T-2E26 L
OGC,015818 LRossbach i'
KO'Brien, Rill E
WBeckner E-Mall w/ encl 1 only SCollins/FMiraglia,SJC1/FJM BBoger, BAB2 '
Adensam, EGA1 1-CMoore, ACM RCapra, RAC1 TMartin, (e-mail to SLM3) i SShaeffer, EDO, SWS D. Calhoun, Rlil M. Leach, Rill e A. Vogel, Rlli A. Markley,!AWM DOCUMENT NAME: G:)CMNTSPtZIONnZl0113MT. SUM
. TO MY A COPY OF TMS DOCUMENT, INDICATE IN THE box: at:" e COPY WITHoUT ENCLOSURES "E" = COPY WITH ENCLOSURES "N" OFFICE.
PM:PD3-2 g:
[f.APAS-27 (L D:PD3-2 E
N NAME' LRossbach:sp/'ud Mb-RCapra RE DAre 2/ y is8 21 - % isc 2/ i 9 198 OFFICIAL RECORD COPY
Zion Nuclear Power Station Unlis 1 and 2 I
cc:
i Ms. O. Kingsley, Presiderd Document Control Desk-Ucensing Nuclear Generaton Group Commonwealth Edison Company Commonwealth Edison Company 1400 Opus Place, Suite 400 i
Execu0ve Towers Westill Downers Grove,lilinois 60515 1400 Opus Place, Suite 500.
i Downers Grovo,Ilhnois 60515 Mr. David Helwie '
Nuclear Serv 6ces Senior Vloe President Mchael1. Mller, Esquire Commonwealth Edison Company tl Sidley and Austin Execuevo Towers West 111 One First National Plaza 1400 Opus Place, Suite 900 Chica00,lllinois 60603 Downers Grove,lL 60515 I
Dr. Cecil Lue-Hmg
- Mr. Gane H. Stanley Director of Research and Development PWR's Vice President l.
Metropolitan Sanitary District Commonwealth Edison Company of Greater Chicago Execu#ve Towers West 111
- 100 E. Erle Street 1400 Opus Place, Suite 900 Chicago, Illinois 60611 Downers Gtove,IL 60515 Phillip Steptoe, Esquire Mr. Steve Perry
- Sidley and Austin BWR's Vice President One First National Plaza Commonwealth Edison Company Chica0o, Illinois 60603 Execu#ve Towers West til 1400 Opus Place, Suite 900 4
Mayor of Zion Downers Grove,IL 60515 Mr. Dennis Ferrar Commonwealth Edian Company degulatory Services Manager Site Vice President-Zion Commonwealth Edison Company
. 101 Shiloh Blvd.~
Executve Towers West 111
- Zion, Illinois 60099-2797 1400 Opus Place, Nte 500 Downers Grove,IL 40515
~
lilinois Department of Nuclear Safety Office of Nuclear Facikty Safety Ms. Irena Johnson, Ucensing Director 1035 Outer Park Drive Nuclear Regulatory Services s
Springfleid, Illinois 62704 Commonwealth Edison Company Executive Towers West til U.S. Nuclear Regulatory Commisalon 1400 Opus Place, Suite 500 l
Zion Resident inspectors Of5ce Downers Grove,IL 60515 105 Shiloh Blvd.
Zion, Illinois 60099 Commonwealth Edison Company Reg. Assurance Supervisor-Zion Regional Administrator 101 Shiloh Blvd.
U.S. NRC, Region til Zion, Illinois 60099-2797 601 Warrenville Road Usle, Illinois 60532-4351:
Commonwealth Edison Company
' Zion Station Maneger
-- 101 Shiloh Blvd.
i Zion, Illinois 60099-2797 -
l
,----w-n n
- - - - --r
~....
i JANUARY 13,1998, MEETING BETWEEN COMMONWEALTH EDISON COMPANY AND NRC ZION IMPROVED TECHNICAL SPECIFICATIONS IMPLEMENTATION Name Company Desiree Calhoun NRC/R lll/DRP Mel Leach NRC/R ill/DRS Lawrence Rossbach NRC/NRR/DRPW Tony Ve9el NRC/R-Ill/DRP Jack Brons Comed / Zion Jim Eaton Comed / Zion Robert Godley Comed / Zion Ray Landrum Comed / Zion Mike Madigan Comed / Zion Ken Norris Comed / Zion Tim O'Connor Comed / Zion Rob Starkey Comed / Zion Rick Zyduck Comed / Zion k
ENCLOSUhd 1
[
t ITS Implementation XRC Public Meeting i
Comed 1
January 13,1998 Zion Station 1
ENCLOSURE 2 I
t
alt mAe
~m44,_,a_,s.4 4.m.__-_g_,,L
,,pa,g.wa.e,a_4A_A..
as 6:___,
m,..
2 e44-.4-ae a
et 4%,de.iu.4 A
e6.sJ A.,aasa_.
i-.*
.4m..aa.
m i
0 O
W e
tN t
I I
1 i
o m
W M
O i
Co i
.e.4 c0 l
N l
M d
1 1
4 i
k cc Ch Ch 9
O 6
m3 E
cc
- 9
(
d 4
4 5
e
-.s,
- m m.
m m..--
t Agenda Introduction Jack Brons ITS Overview Ken Norris Implementation Process Mike Madigan Q&SA Assessment Rick Zyduck Post Implementation Robert Godley Questions and Answers t
January 13,1998 Zion Station - Comed 3
ITS Ovenriew Structure i
Major Philosophy Changes and Benefits i
Training Questions & Answers 1
i i
h Jamnary 13,1998 Zion Station - Comed 4
i-
)
i
l l
l l
i i
Structure t
6 Revised License l
New Specifications Administrative Technical Requirements New Bases l
1 Relocated Items i
Examples of Changes January 13,1998 Zion Station - Comed 5
j 4
l I
i
Major Philosophy Changes and Benefits L
Rules for Technical Specifications
- Increases consistency of usage
- Section 1.1 " Definitions"
- Section 1.2 Logical Connectors"
- Section 1.3 " Completion Times"
- Section 1.4 " Frequency"
- Section 3.0 " Limiting Condition for Operation / Survei'!ance Requirement Applicability"
- Safety Function Determination Program
- Examples January 13,1998 Zion Station - Comed 6
l l
l Major Philosophy Changes and Benefits (Continued)
?
Expanded Bases
- Structure of Bases facilitates better resolution / understanding of any l
LCO section
- Provides detailed information in the following areas:
Background
- Actions Applicable Safety Analysis Surveillance Requirements i
LCO References
- Applicability
- Provides guidance on "how" to meet Requirements
- Expanded and Enhanced Design Bases Included
- Bases Control Program January 13,1998 Zion station - Comed 7
_ \\
1 l
l Major Philosophy Changes and Benefits (Continued)
{
l Relocated Requirements
- Relocation Matrix 1
I
- Allows revision by appropriate process
~
i i
l i
L i
i January 13,1998 Zion Station - Comed 8
i i
l j
I L
l Training Activities General Station 1
- Awareness
- Department Specific f
Licensed Operator
- Initial
- On-Shift Monitonng
- Continuing
- ParallelImplementation
- Phoenix Manager ITS Mentor I
Engineering ~
January 13,1998 Zion Station - Comed 9
I
~
I!
- It !!!i;!
(!iLL !t! >!!>Ill 0
1 sr e
w w
sn e
A i
d v
E m
r d
o C
e n
n v
a o
i ta O
t S
s no n
iZ S
o T
i t
I seuQ 8
99 1
3 1
yrauna J
'l;b' I
I >
l Implementation Process InitialImplementation Period 5 Point Review Implementation Self-Assessment Dedicated Implementation Team Planned Activities
- Relocation Controls and Matrix
- Procedure and Surveillance Readiness
- ITS Readiness Recheck Q&SA Assessment January 13,1998 Zion Station - Comed 11
~
5 Point Review In-Service Testing l
F,mergency Diesel Generator Testing ESFAS & Reactor Protection Testing Overlap of Surveillances Off-Line Survei: ances January 13,1998 Zion Stanon -- Comed 12 l
e 1
.i Implementation Self-Assessment i
Non-Comed Incivic ual Experience with ITS Implementation L
Results i
- Strengths
- Vulnerabilities j
i I
+
January 13,1998 Zion Station - Comed 13 l
a l
Implementation Self-Assessment (Continued)
Strengths
- Technical Merits of Database Control
- SFDP
- Bases Control Program
- Incorporation of Changes into Procedures
- Implementation of More Restrictive Requirements January 13,1998 Zion Station - Comed 14
Implementation Self-Assessment (Continued)
Vulnerabilities
- Control of Relocated Items
- Relationship Between EWCS and Databa.c
- Level of Detail Inconsistencies 1
- Minor Technical Issues I
January 13,1998 Zion Station - Comed 15
a Dedicated Implementation Team l
SENIOR MANAGER PROJECT
+
MANAGER i
ADMIN SHIFT SUPPORT MENTORS 7
I I
I r
OPERATIONS ENG'NEERING REGULATORY LEADS LEAD ASSURANCE l
LEAD l
c I
I I
i l
PROCEDURE LSS TSIP ENGINEERING ITS BASES DATABASE WRITERS 3
ENGINEERS SUPPORT CHANGES 1
4 6
TRAINING 1
i l
i January 13,1998 Zion Station - Comed 16 l
t
~
i l
i l
Planned Activities l
Relocation Controls and Matrix
- Controls l
Controlled Database l
Appropriate Control Requirements
- License Amendment Process
- 50.59 and Other Applicable Regulations
- M.atr1X f
January 13,1998 Zion State: - Comed 17 4
l
I l
Planned Activities (continued) j Procedure Readiness I
- Administrative Controls i
1 i
- Surveillances l
1 l
- Required Action Implementation
- Safety Function Determination Program i
I i
January 13,1998 Zion Station - Comed 18
r i
Planned Activities (Continued)
Surveillance Readiness
~
l
- Verification ofITS Requirements to l
Surveillance Procedures j
~
- Verification of Surveillance to Electronic Work i
r i.
Control Scheduling System (EWCS)
- Quality Checks 1
i
- Surveillances Completed or Scheduled I
j l
January 13,1998 Zion Station - Comed 19 i
{
Planned Activities (Coritiritted) b ITS Readiness Recheck j
L l
- Operator Rounds r
1
- Review Current Inoperabilities and SFDP i
i 1
- Recheck Station Schedule
- Surveillances Current 1
- Final Management Concurrence
[
January 13,1998 Zion Station - Comed 20 l
w
Schedule Projected Key Dates and Milestones
- Q&SA Assessment 1/30/98
- Relocation Controls and Matrix 2/13/98
- Bases Clarifications 2/20/98
- Procedure & Surveillance Readiness 2/20/98
- OSR/PORC 2/9 -
3/6/98
- ITS Readiness Recheck 2/23 - 3/6/98
- On-Shift Mentors 3/9 - 5/9/98
- Implementation 3/20/98 January 13,1998 Zion Station - Comed 21
Q&SA Assessment
- 1996 Audit QAA 22-96-07
- UFSAR Updates
- References and Bases t
- Incomplete Procedures
- 1997 Audit QAA 22-97-05
~
- UFSAR Updates j
- Safety Function Determination Procedure
- Surveillance Database
- 1998 January Assessment
- Corrective Action Records Followup
- G.L. 96-01 Followmp
- Implementation & Transition Plan Review i
January 13,1998 Zion Station - Comed 22 i
+
e w
- l t
t t
l l
L Post Implementation 1
i On-Shift Meritoring l
l i
Technical Requirements Manual 1
Continued Bases Enhancements l
i i
January 13,1998 Zion Station - Comed 23 1
l
.