7590-01 P UNITED STATES NUCLEAR REGULATORY COMMISSION COMMONWEALTH EDISON COMPANY DOCKET NOS 50295 AND 50-304 NOTICE OF WITHDRAWAL OF AMENDMENT TO FACILITY OPERATING LICENSM

The U.S. Nuclear Regulatory Commission (the Commission, has granted the request of Commonwealth Edison Company (Comed, the licensee) to withdraw its Nov$mber 7,1996, applications for proposed amendments to Facility Operating License Nos. DPR 39 and DPR-48, iswd to the licensee for operation of the Zion Nuclear Power Station, Units 1 and 2, located in Og!s County, Illinois. Notice of Consideration of issuance for these amendments was pub!ished l

in the FEDERAL REGir TER on December 13,1996 (61 FR 66704-05).

The first proposed amendment would have modified the facility technical specification (TS) surveillance requirements from verifying greater,than or equal to 17 percent steam l

generator secondary side wide range water level to greater than or equal to 17 percent steam generator secondary side narrow range water level. The second proposed amendment would have changed the TS values for the reduced power range neutron flux high setpoint trip that are 1

i specified when one or more code main steam safety valves are inoperable. The third proposed I

amendment would have clarified the TS operability requirements for the residual heat removal

(

loops during core alteration operations. By letter dated February 12,1998, Comed withdrew the amendment requests because they are no longer needed. By letter dated February 13,1998, i Comed certified that they have permanently ceased operations at Zion Nuclear Power Station, Units 1 and 2. Since Comed has permanently ceased operations at Zion Station, the license i '

amendment requests submitted on November 7,1996, are no longer needed.

l For further details with respect to this action, see (1) the three applications for i amendment dated November 7,1996, and (2) the staffs letter dated February 23, 1998.

i 4

Y 9003020175 980223 PDR ADOCK 05000295 P PDR

, j ,,

I 2

l These documents are ava!!able for public inspection at the Comm:ssions Public Document Room, the Gelman Building,2120 L Street, NW., Washington, DC, and at the local public document room located at the Waukegan Public Library,128 N. County Stree', Waukegan, Illinois 60085.

Dated at Rockville, Maryland, this 23rd day of February 1994.

FOR THE NUCLEAR REGULATORY COMMISSION

  1. &- W Lawrence W. Rossbach, Project Manager Project Directorate lil-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation i