ML20203G035
| ML20203G035 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/25/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Koester G KANSAS GAS & ELECTRIC CO. |
| Shared Package | |
| ML20203G039 | List: |
| References | |
| NUDOCS 8607310242 | |
| Download: ML20203G035 (2) | |
See also: IR 05000482/1986016
Text
.
/
0,
UNITED STATES
yN
. ',
NUCLEAR REGULATORY COMMISSION
h-
REGION IV
k,
811 RYAN PLAZA DRIVE, SUITE 1000
ARLINGTON, TEXAS 78011
,,,
JUL 2 51986
In Reply Refer To:
Docket:
STN 50-482/86-16
Kansas Gas and Electric Company
ATTN:
Glenn L. Koester
Vice President - Nuclear
P. O. Box 208
4
Wichita, Kansas 67201
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Cummins, 8. L.
Bartlett, D. M. Hunnicutt, and G. A. Pick of this office during the period June
1 to July 5,1986, of activities authorized by NRC Operating License No. NPF-42
for the Wolf Creek Generating Station, and to the discussion of our findings
with Mr. G. D. Boyer and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included plant status, followup on
previously identified NRC items, operational safety verification, engineered
safety features system walkdown, onsite followup of events, monthly
surveillance observation, monthly maintenance observation, plant safety review
committee, and nuclear safety review' committee. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
These
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter. .
We have also examined actions you have taken with regard to previously
identified NRC items.
The status of these items is identified in paragraph 3
of the enclosed report.
The response directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the aperwork Reduction Act of 1980, P
6-511.
V: RI
' RI
hP
C:RSBh
h8
P 8
'
BLBartlett
c JECummins GAPick
DMHunnicutt
RMullikin
DRF un}er
7 27/86
7/O/86
7 /$/86
7 / 2 786
T/Vf86
'7 /1/ /86
/
C:RPB
-
JEGagl
do
7 h.6/8
8607310242 860725
Q
7
ADOCK 05000482
G
1
l
k
1
._ -
---.
_
-
.-
s
Kansas. Gas and Electric Company
2
,
,
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed by:
J. E. GAGLIARDO"
,.
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/86-16
-
cc w/ enclosures:
Kansas Gas and Electric Company
ATTN: Otto L. Maynard, Manager
of Licensing
P. O. Box 309 (Sharp Road)
Wichita, Kansas
67201
Forrest Rhodes, Plant Superintendent
Wolf Creek Generating Station
P. O. Box 309
Burlington, Kansas
66839
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB
Myron Karman, ELD, MNBB (1)
- Resident Inspector
R. D. Martin, RA
- Section Chief, (RPB/B)
DRSP
- R&SPB
RIV File
- RSB
MIS System
- RSTS Operator
D. Weiss, LFMB (AR-2015)
- w/766