Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203D888 + (ML20203D888)
- ML20203D889 + (ML20203D889)
- ML20203D892 + (ML20203D892)
- ML20203D895 + (ML20203D895)
- ML20203D898 + (ML20203D898)
- ML20203D900 + (ML20203D900)
- ML20203D901 + (ML20203D901)
- ML20203D904 + (ML20203D904)
- ML20203D909 + (ML20203D909)
- ML20203D910 + (ML20203D910)
- ML20203D914 + (ML20203D914)
- ML20203D915 + (ML20203D915)
- ML20203D917 + (ML20203D917)
- ML20203D920 + (ML20203D920)
- ML20203D928 + (ML20203D928)
- ML20203D938 + (ML20203D938)
- ML20203D942 + (ML20203D942)
- ML20203D945 + (ML20203D945)
- NSD-NRC-98-5578, Forwards Proprietary Revised W Response to Request for Addl Info Item 440.580.Open Item Pertains to AP600 PRHR Osu Tar. Proprietary Response Withheld (Ref 10CFR2.790) + (ML20203D947)
- ML20203D948 + (ML20203D948)
- ML20203D950 + (ML20203D950)
- ML20203D952 + (ML20203D952)
- ML20203D955 + (ML20203D955)
- ML20203D960 + (ML20203D960)
- 0CAN129705, Forwards ANO Commitment Change Summary Rept for Sept 1995- Nov 1997. Rept Lists Each Commitment for Which Change Made During Reporting Period & Provides Basis for Each Change + (ML20203D963)
- ML20203D964 + (ML20203D964)
- ML20203D966 + (ML20203D966)
- ML20203D968 + (ML20203D968)
- TXX-4901, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Per 860430 Request for 2 Month Extension to Response Deadline + (ML20203D971)
- ML20203D973 + (ML20203D973)
- PNO-III-86-070, on 860716,small Drip Wise Leak Observed on 8- Inch Suction Line to DHR Pump,Following Reactor Trip. Insulation Removed.Leak Due to Two Cracks Immediately Adjacent to Test Plug Weld + (ML20203D974)
- ML20203D976 + (ML20203D976)
- ML20203D978 + (ML20203D978)
- 3F0286-04, Monthly Operating Rept for Jan 1986 + (ML20203D979)
- ML20203D981 + (ML20203D981)
- ML20203D984 + (ML20203D984)
- IR 05000030/1998201 + (ML20203D985)
- ML20203D987 + (ML20203D987)
- RBG-44386, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-20.Corrective Actions:Rp Technician & Crew W/Which Technician Was Working Frisked Using PCM-1Bs & No Contamination Was Found + (ML20203D991)
- ML20203D993 + (ML20203D993)
- 05000277/LER-1986-014-02, :on 860618,shutdown Initiated Due to Potential Loss of Emergency Svc Water (Esw).Caused by Need to Repair ESW Pipe Leak Occurring in Inlet to RHR Room Cooler 2A.Pipe Temporarily Repaired & Ultrasonically Tested + (ML20203D994)
- ML20203D995 + (ML20203D995)
- NSD-NRC-98-5579, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses Provided in Table 1.NRC Should Review Encls & in Form W of Status to Be Designated in NRC Status Column of Oits + (ML20203D996)
- 0CAN078607, Forwards Rev 8 to QA Manual Operations. Changes Do Not Reduce Commitments in Quality Program Description Accepted by Nrc.Rev 8 Pertains to Changes in Organization & Current Practices in Implementing Requirements + (ML20203D998)
- ML20203E001 + (ML20203E001)
- ML20203E002 + (ML20203E002)
- ML20203E005 + (ML20203E005)
- ML20203E009 + (ML20203E009)
- ML20203E015 + (ML20203E015)
- ML20203E016 + (ML20203E016)
- ML20203E017 + (ML20203E017)