._.
o o DCD 006 4
February 23, 1998 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West lll 1400 Opus Place, Suite 500 Downers Grove,IL 60515
Dear Mr. Kings'ey:
This refers to the meeting conducted at the Region lli Office of the Nuclear Regulatory I
Commission (NRC) in Lisle, lilinois, on February 6,1998. This meeting was to discuss the status of your actions to improve fire protection at Quad Cities Station with regards to the 4
requirements of 10 CFR 50, Appendix R. During the meeting, a number of questions were highlighted regarding the use of the Interim Alternative Safe Shutdown Method (IASM),
Individual Plant Examination for External Event (IPEEE) sensitivities, and whether the revised safe shutdown analysis will fully comply with the requirements of 10 CFR 50, Appendix R.
In accordance with Section 2,790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
We appreciate your cooperation in this matter, if you have any questions regarding this meeting, please contact me at 620/829 9700.
Sincerely,
/
/s/ Ilarold O. Otristensen for 1
John A. Grobe, Director 4
Division of Reactor Safety Docket Nos, 50-254;50 265 License Nos. DPR 29; DPR 30
Enclosures:
1.
List of Attendees 2.
Licensee Presentation Slides-See Attached Distribution DOCUMENT NAME: G:DRS\\QUA02108.DRS i......,,..
...,e.em
.n.~.
.~%.
r em
.n.~,.....o....v.m m OFFICE Rlli p) Rlli Al Rlli lV Rlli Rlli p
f NAME Chyu:sd pmc Gardner h' Ring t1LW /d Dapasgf)
Grobe \\Vf DATE 02/;p/98 02/ta /98 02/:c/98 02/20/98 02/2398 '
OFFICIAL RECORD COPY IlIHilIll1:IDI 11 9002260200 900223 ADOCK0500g4 PDR P
/
J e/ a
s 4
O. D. Kingsley 2
February 23, 1998 cc w/encis:
M. Wallace, Chief of Staff D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager
- 1. Johnson, Licensing Director DCD - Licensing l
E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard l
Nathan Schloss, Economist Office of the Attorney General l
State Liaison Offiner I
Chairman, Illinois Commerce Commission W. D. Leech, Manager of Nuclear MidAmerican Energy Company Distribution Docket File w/encls Rill PRR w/encls Rlli Enf. Coordinator w/encls PUBLIC IE-01 w/encls SRI, Quad Cities w/encls TSS w/encls LPM, NRR w/encls J. L. Caldwell, Rlll w/encls R. A. Capra, NRR w/encls DRP w/encls A B. Beach, Rlil w/encls DOCDESK e mail DRS w/encls a
4 4
QUAD CITIES. APPENDIX.R.8TATUS MEETING IN REGION lil FEBRUARY 6.19H LIST OF ATTENDEES
&c}gatBeaulatory Commission A. Bill Beach, Regional Administrator, Region 111 Robert Pulsifer, Project Manager, NRR
- Tad Marsh, Chief, Plant Systems Branch, NRR Patrick Madden, Senior Fire Protection Engineer, Plant Systems Branch, NRR John A. Grobe, Director, Division of Reactor Safety, Region lli Marc Depas, Acting Deputy Director, Division of Reactor Projects, Region ill Ronald Gardner, Chief. Engineering Specialists Branch 2, Region ill Doris Chyu, Reactor Engineer. Engineering Specialists Branch 2, Region 111 Joel Guzman, Reactor Enginear, Division of Reactor Safety, Region ill Mark Ring, Chief, Projects Branch 1 Region lll Angela Greenman, Public Affair Officer, Region lli Chrh Miller, Senior Resident inspector, Quad Cities Commonwealth Edison (Comed)
Ed S. Kraft, Jr., Quad Cities Site Vice President Frank Famulari, Manager, Q&SA Steve Perry, Comed Vice President John Hosmer, Comed Engineering Vice President John Garrity, Comed Engineering Charles Peterson, Comed Regulatory Assurance H. Roger Gavankar, Quad Cities Appendix R Project Manager Tom Thorsell, Comed Chief Engineering for Electrical and I&C Jim Brownell, Comed Senior Fire Protection Engineer David Wozniak, Comed Engineering Paul Knoespel, Quad Cities PSA Nick Fioravante, TMCS, Inc., Consultant Eric Beaumont, Comed Engineering Greg Tice, Comed Engineering Wayne Dingler, Sargent and Lundy Stan Chingo, Comed Fire Protection / Appendix R Engineering Delfo Blanchinl, Project Director, Sargent and Lundy David Tubt's, Midamerican Energy Donald Mershon, Nexus Technical Service Corporation - Dresden Mark Gasser, Consultant, Gasser Associates Mark Wagner, Comed Licensing Bob Rybak, Comed Licensing Member of the Public Don Splinter, Wisconsin Electric
f A Unicom Company i
f i
Quad Cities Station i
l 1
l Post Fire Safe Shutdown Project 4
February 6,1998
A Unicom Company Meeting Agenda Introduction Ed Kraft Safe Shutdown Project Roger Gavankar Issues Jim Brownell / John Garrity
/ Tom Thorsell Confirmatory Actions Chuck Peterson Q&SA Overview Frank Famulari Closing Remarks Ed Kraft 2
t l
A Unicom Company l
Introduction f
l 4
l Committed to Improve Our Post Fire Safe l
Shutdown Capability
]
Revising the Existing Safe Shutdown 4
i Analysis 1
Major Project with Detailed, Resource Loaded Plan and Schedule 4
i 3
t
3 A Unicom Company 1
)4 Resolution Strategy l
i j
Revise Safe Shutdown Analysis r
Conform Procedures to SSA l
Complete Modifications e
I i
t i
i l
F l
i 4
t i
i l
~
i
.. _ -,. ~.,
,__._,,,,,..-..-_..m_
s A Unicom Company Overview of Safe Shutdown Project Rigorous Process Issue Identification and Resolution Potential Unreviewed Safety Questions Potential Post Fire Safe Shutdown Discrepancies Modifications Compensatory Measures 5
A Unicom Company Rigorous Process Overview D evelopm ent of i
i A cceptance C riteria i
R esolution of i
Technical &
R egulatory issues &
R evise SS A See Note 1 1
R eview Valida te an d SS A = Safe Shutdown A nalysis SSD = Safe Shutdown Approve the SS A SSM = Safe Shutdown M ethod R evise, R eview, N ote 1: Type of issue Validate and A pprove 2 6 % - A d m inis tra tive SSD im plem entation 17% - Enhancem ent P ro ce d u re s j
12 % - Im proved S S M nd conduct Training i
45% - Existing S S A
& P ro ce d u re s t
6
i i
.!i i
j}\\l
)}s P
ro A
cM c
dt
+
Cc e
r e tip ue r
eta
- c e
r i
s a nce C
WC R
o Mm o
e ep Dn r
I v
ae sp s
i sn a
us sr e
r a Ae S
et o S
r A
y R
p E O O
P
(
r et i
vp ae oR R
h ge g
l r
ce Se e
r ua ev Sv t
g ab de Ae cMA i
i t i
. oc i t u
)
w w
,s o o
ot r
t di ny es n
r s
o u
5 5
0
.0 5
5 4A 0
s 59 9
59 Pro c
ess M
A a
w n
P Ep R aSO i
Rnp eO t
n eg g i R Y!
i y
vievn eeC n
nniei s i
m o
eedwt e
wex&
i e
r n
R t
U M
n ee ti Nt i S
Yi Rng ta C w 7
t i
r u
t p
h 1
Comed Rigorous Process
^ " " ' ' " " " " " '
SSA Review Steps
! Q&SA !
- 1. Site FP Engineer
- 2. Site Engineering
- 3. Corporate Licensing SSA reviewed against
-I
- 4. Corporate FP Eng.
G&SA
- 5. Industry Expe$se acceptance criteria
- e. s te o era ns 1.2.4.6 g,
n e. Group
- 8. PO RC Joint review by issues team, procedure team, and corporate & off-site expertise 1.2.4.5.6 Broad spectrum of experts review for impact O&SA 1
of technical & regulatory issues
- 3. 5 Final review per site procedures
- 2. 6.7.8 8
9
1 Comed Rigorous Process
^ "*-" -
Issue Identification and Resolution Concerns by Others v
QuestiorJ Review by Resolution by incorporate Concern by Technical
> lssue Identi8ed ->
PlF Technical as Team Expert Issues Group Appropiate v
v Modifications Corrective Question Action Answered Program l
9 9
e
Condid Rigorous Process
" * - c-- >
Evaluation of Change to SSA Stop O pe rab.hty Evalua ton no Prepare USQ (U SQ 7)
Package Submittal Po du os Repa
~
Ee no Ope rabihty Evalua non Revised
. f ompare 3"Exemp/
8 SSA tmo
'N NO-> Com pensatory M odifica ES Stop
-mo-N i
/
NO Design
[
Change YES-
>\\ R equired New Exemptons
> Submittal 10
- W
._.,un--.s.
---...-...w.-,anmn_a.-
.aa3~n-
._.~..~ ~._ ~
~ _ -_.~ _.--
-..a-...-n 4
i g
C a
i3
.I M
l 1
1 l
1 P
g%
4 W
C O
4 g
\\
t t
m i
O u.
1 O
O d
i.
a w
tuum a
l c
Comed A Unicom C-:- ;: ;y l
Project Goals to be Achieved i
i i
j Reduced Manual Actions 1
Fewer and Simpler Procedures Assure Design Basis Reflects Plant as
]
Currently Configured j
Improved UnitIndependence c
t 12
!.l-L-.
--..---.-.._-____.--________-...,.__-_2
l A Unkom Company l
SSA Revision
{
Incorporation of the SBO Diesel Generator 4
l Additional Common Power Supply Review
- Incorporated Breaker Coordination Results I
- Multiple and High Impedance Fault Results i
i Additional Common Enclosure Evaluation 4
- Added 250 VDC Control Power Fusing l
Expanded Spurious Operations Scope
- For Example: Pumps, Additional Va ves l
]
13
...-.y.m,_
__,,._.._.__e_
,.,.__,,,,,._,--,-r w
A Unicom Company i
Procedure Revision 4
}
l Timeline for Performing Actions l
- Preserving Water Level Dual Unit Shutdown i
4 i
I I
i i
t i
14 i~
I r
.,_--,__.,-,-,,-,_._._.._-,,._.,,,,,.,,.,-.._,,,.,.,,_,.,,-,_--_.--,.,._,.,.v_,.....,,
=*-
A Unicom Company Modifications Completed Modifications To Be Completed Prior to Startup 1
Post Startup Modifications and Compensatory Measures Current Estimate ~ S5 Million I
Simpler and More Robust Post Fire Safe Shutdown. Capability i
15
Comed Modifications
^ " " " - " - - " '
Completed Unit 1 Unit 2 RHR 19 valves hot short RHR 19 valves hot short Penetration fire barriers Penetration fire barriers Additionallight packs SBO cable reroute 1/2 EDG exhaust reroute Recire 5B valve hot short RCIC minimum flow logic l
RCIC reliefvalve HPCIinterposing relay P
16 e
A Unicom Company Modifications Prior to Startup i
Unit 1 Unit 2 4 kV contro' power 4 kV control power 250 VDC 250 VDC MSIV room. door closure MSIV room door closure 8
RHRSW minimum flow RHRSW minimum flow SBO fuel transfer SBO fuel transfer RCIC room temperature RCIC room temperature Alternate power to RCIC 16 valve Alternate power to RCIC 16 valve Recire 5B valve hot short RCIC minimum flow logic RCIC relief valve 4
17 4
Comed i
A Unicom Company
)
Post Startup Modifications and l
Compensatory Measures 1
[
Lights Located on Flocr l
SBO Cable (FinalInstallation)
{
Existing Configuration 1
250 VDC Transfer Switch Use of 250 VDC Removable Links t
Notes:
l These require no people to be staged in the plant-L l
Schedule for removal by April 20,1998 e
i f
A Unicom Company Licensing Milestones c
l Exemptions Review - Complete 2/26 l
- No Exemptions anticipated
}l SSA 50.59 - Complete 3/17 l
- No USQ's anticipated 4
l Procedures 50.59 - Complete 4/14
- No USQ's anticipated i
L f
I 19
.,,,_,..._.m._-...
..,_....m.,
-.w.y
- -, w e --
A Unicom Company SBO Diesel Generator Reason for Change:
-Increased Capacity
- Auxiliaries Located Outside Fire Area
- Reduced Manual Actions
- Increased Tolerance for a Spurious Start
- Differences:
- Manual Loading
- Safety / Augmented Quality i
M Safety Review of Change 50.59 Criterion Circumstance Reason Criterion Met Probability ofoccurrence of an Use ofSBO to No changes to prior analysis of accident previously analyzed is not power SSD in either SBO accidents or fire as an increased event fire accident Consequences ofan accident Same as above Same as above previously analyzed is not increased Probability ofoccurrence of-Same as above Same as above malfunction of equipment previously evaluated is not increased Con, sequences of a malfunction of Same as above Same as above equipment previously analyzed is not increased Possibility of a malfunction of a Same as above All type of accidents / malfunctions different type than previously ofSBO a! ready evaluated when l
evaluated is not created SBO was installed Possibility of an accident of a different ise as above Same as above type than previously evaluated is not created Margin ofsafety as defined is not Same as above No adverse impact on the ability to decreased achieve and maintain post fire safe shutdown because of same religbility requirements (0.95)
L w
A Unicom Company a
Dedicated 125 VDC Battery l
Reason for Change:
- Simplify Cold Shutdown Repairs
[
- Reduced Manual Actions
- Reduced Repair Time Differences:
i
- Repair Details
- Power Supply 4
I 22 1
Comed Safety Review of Change
^ ""
50.59 Criterion Circumstance Reason Criterion Met Probability of occurrence of an accident Use of battery cart No changes to prior analysis of previously analyzed is not increased to power SSD repairs the repair for an accidents or fire as post fire event an accident Consequences of an accident previously analyzed is not increased Same as above Same as above Probability ofoccurrence of a malfunction of equipment previously evaluated is not Same as above Same as above increased Consequences of a malfunction of Same as above Maintenance program to prevent equipment previously analyzed is not increased Possibility of a malfunction of a different Same as above No change to the type of repair type than previously evaluated is not created previously approved Possibility of an accident of a different type Same as above Same as above than previously evaluated is not created Margin of safety as defined is not decreased Same as above No adverse impact on the ability to achieve and maintain post fire safe shutdown.
23 e
9 1
A Unicom Company l
Review of Exemptions Review in progress, areas include:
Suppression and Detection for Alternate Shutdown Areas - (Review Complete)
Hot Shutdown. Repair - Control Power Fuse Pulling (In Progress)
Separation of Redundant Equipment - (In Progress) j i
i 24 4
0 0
y-n 3--.
y
-e
-em3
-r,
%.m w--
g+w w,-
c,r, s--
g ru
-y F
cggqEs1 Other Issues Under Consideration Residual Heat Removal Minimum Flow Reactor Recirculation Pump Failure to Stop Reactor Feed Pump Failure to Stop High Drywell Pressure on LOOP All Issues Scheduled to be Resolved by March 6,1998 25
A Unicom Company Milestones March 24,1998 SSA Complete April 19,1998 Safe Shutdown Procedures and Training April 20,1998 Plan and Schedule for Resolution of l
Xon-Conformancds 26
~
COfnEd A Unicom Compan:-
CAL Letter Revise, Review, Validate & Approve Safe Shutdown Analysis
- Revise Set Criteria, Change to Meet Criteria
- Review S & L Independent Review Station Review, Per Slide 8
- Personnel Other Than Those Who Prepared the Revision
- Validate Compare to the Criteria - NEP 05-04 & QCAP 1500-16
- Approve UFSAR Change Process 27
~
4 -
i 1
A Unicom Company l
CAL Letter Revise, Review, Validate & Approve i
l Safe Shutdown Procedures
- Revise j
Change to Meet SSA
- Review Onsite Review Process (Independent Technical Review l
by Operations and Appendix R Engineer), PORC l
- Validate j
Timeline Verification of all 8 SSD Procedures l
Walkdown of all 8 SSD Procedures
- Approve l
Operations Department Supervisor 28 e.
l
~:.
Comed
..m _ c _
CAL Q&SA Independent Oversight
- Q&SA will:
- Verify SSA Acceptance Criteria
- Conduct Assessment of Team Resolution ofIssues
- Review Final Procedures
- Conduct Overview:
Design Changes Compensatory Measures Training 29 e
A Unicom Company CAL Requirements Train Operators and Other Required Personnel Submit any newly identified USQ's and/or exemptions for approval 10 CFR 50 Appendix R
- Identify discrepancies prior to restart
- Compensatory measures identified and implementec Meeting with XRC 30
=
8 i
a Oz a.
7Q Xo 5
Esw m
M
,