Forwards Insp Rept 99900732/97-01 on 971002-03 & Notice of Nonconformance.Nonconformance Represents Deviation from Procurement Specs Imposed Upon Engineering Products Div by Customers,Therefore Significant.Response Requested
ML20203D950
Person / Time
Issue date: 12/10/1997
From: Black S
NRC (Affiliation Not Assigned)
To: Sakofsky S
GOULDS PUMPS, INC.
Shared Package
ML20203D954 List:
References
REF-QA-99900732 99900732-97-01, 99900732-97-1, NUDOCS 9712160355
Download: ML20203D950 (2)


Text

_ _ _ - _ _ _ _ __ _

95 88 %

p J*,

UNITE 3 STATES

,. v g

NUCLEAR REGULATORY COMMISSION WASHINoToN. D.C. 20655-0001

\\*****

December 10, 1997 Mr. Stephen Sakofsky, Director

'luality Assurance Industrial Products Group Gould's Pumps, Incorporated 240 Fall Street Seneca f alls, New York 13148

SUBJECT:

NRC INSPECTION RLPORT NO. 99900732/97-01

Dear Mr. Sak < sky:

On October 2-3, 1997, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Gould's Pumps, Incorporated, Industrial Products Group, Engineered Products Division (EPD) facility in feneca Falls, New York. The enclosed report presents the results of that inspection.

During this inspection, the NRC inspector founc 6 hat the implementation of your quality assurt.nce program failed to meet certain NRC requirements imposed on you by your customers.

Specifically, EPD has issued certificates of compliance for replacement parts without ensuring that all the material critical characteristics have been verified. The inspector deteruined that EPD is not verifying that the chemical composition of castings are in compliance with the applicable American Society for Testing and Materials (ASTM) standards.

Instead, it was found Sat for approximately 10 years, EPD has been verifying only selected chemical lements in corrosion resistant castings. Additionally, EPD did not verify that ASTM required heat treatment

!,/

of certain alloys had been performed.

This nonconformance is cited in the enclosed Notice of Nonconformance (NON),

/

and the circumstances surrounding it are described in detail in the enclosed report. You are requested to respond to the nonconformance and should follow the instructions specified in the enclosed NON when preparing your response.

This nonconformance is significant because it represents a deviation from the

qus, procurement specifications that were imposed upon EPD by its customers.

Consequently, those deviations for each licensee application of the EPD supplied components must be evaluated in. accordance with 621.21, " Notification of failure to comply or existence of a defect and its evaluation," of 10 LFR Part 21.

-gy>T)t1( bN l

" b

a caPV g g g* *g y 9712160355 971210 PDR GA999 ENVQOUP

?DR 99900732

~

)

a

i

'Mr.'S~

Sakofsky.

--2L-:

December 10, 1997 fn accordance-with 10 CrR 2.790 of the NRC's1" Rules of Practice," a' copy of this

letter and its enclosure will be placed in'the NRC's Public Document Room l(PDR).

Sincerely, Original _sigr.ed by: Suzanne C. Black Suzanne C. Black, Chief-Quality Assu*ance,' Vendor Inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reacter Regulation Docket-99900732/97-01

Enclosure:

1.

Notice of Nonconformance 2.

Inspection Report 99900732/97-01 DISTRIBUTION:

HQMB R/F PUBLIC DNaujock EJSullivan-JDavis GDick MWebb RLaufer DSkay

_ RPulsifer CSh aki IJLee Docket File 99900732 Central Files / RIDS 1E:0 IJLee DOCUMENT NAMp G:\\ PETRO \\lR-GP To t:ceive a copy of t$ pohment, indicate in the boa: *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy 0FFICr HQMB;dBCH E