Monthly Operating Rept for Jan 1986
ML20203D976
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/31/1986
From: White P, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8604240045
Download: ML20203D976 (10)


Text

-_.

OPERATING DATA REPORT Docket No. 50-311 Date February 10,171 Completed by Pell White Telephone 935-5000 Extension 4455 Operatino Status 1.

Unit Name Salem No. 2 Notes 2.

Reporting Period January 1986 3.

Licensed Thermal Power (MWt) 3411 4.

Nameplate Rating (Gross MWe)

M 5.

Design Electrical Rating (Net MWe)

M 6.

Maximum Dependable Capacity (Gross MWe)W 7

Maximum Dependable Capacity (Not MWe) M 8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9.

Power Level to Which Restricted, if any (Net MWe)

N/A

~

10. Reasons for Restrictions, if any N/A This Month Year to Date

_Cumulativ

11. Hours in Reporting Period 744 744 37729
12. No. of Mrs. Reactor was Critical 357 0 357.0
13. Reactor Reserve Shutdown Hrs.

0 0

20682.

14. Hours Generator On-Line 3533.

349.8

15. Unit Reserve shutdown Hours 349.8 19886.

0 0

0

16. Cross Thermal Energy Generated (MWH) 110831_3
17. Gross Elec. Energy Generated 1108313 6085401 (MWM) 368430
18. Net Elec. Energy Generated IMWH) 348599 368430

__ 1994491

19. Unit Service Factor 348599 18883443 47.0 47.0 52.7
20. Unit Availability Factor

_ __ 21._ Unit Capacity Factor-- --

47.0 47.0 52.7 (using MDC Net) 42.4 42.4 45.3

22. Unit Capacity Factor (using DER Nat) 42.0 42.0 44.9
23. Unit Forced Outage Rate 46.8 46.8 37.5
24. Shutdowns scheduled over next 6 months N/A (type, date and duration of eac!
25. If shutdown at end of Report Period, Estimated Date~ of Startup(

1/5/86 26 Units in Test Status (Prior to Commercial Operation):

Forecast Abhieved Initial Criticelity 6/30/80 8/2/80 Initial Electricity 9/1/80-6 / 3 / 81._

r 8-1-7.R2 Commercial Operation 9/24/FU 10/13/8_1 860424004S 8 li TQ DR ADOCK 0 DR

~

ALTRAGE DAILY UNIT POWER LEVEL

\\

Docket No.

50-31 Unit Name Salem' i

Completed by Pell White Date Februtry 10 1 Telephone 609 '9 Extension !_4455 Month January 1986 Day Average Daily Power Level (MWe-NET)

Day Average Daily Power Level (MWe-NET) 1 0

17 1096 2

0 18 1085

'3 0

19 146 4

0 20 0

5 368 21 0

6 1069 22 0

7 1115 23 0

8 1106 24 0

9 1100 25 0

10

_ 1099 26 0

11 1094 27 0

12 1102 28 0

13 - 1088

~~

-~

~ ~ ~~~~ [

29 0

14 1094 30 0

15 1084 31 0

16 0

Pg. 9.1-7 R1

UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 l

REPORT MOMTH January 1986 Unit Name Salen No.2 j

Date February 10,1986 Completed by J.P. Ronafalvy Telephone 609-935-6000_

e Extension 4455 Method of Duration Shutting License Cause and Corrective Mo.

Date Type Hours Reason Down Event System Component Action to 1

2i Reactor Report Code 4 Code 5 Prevent Recurrence i

Gland Rings Turbine 010 0101 P

101.8 B

1 ND TURBIN HP and VHP

-O t

Air Cooling System 012 0105 F

-tat Ai 5

AA HTEXCH louvers generator l

Nuclear Reactor 040 0119 F

207.7 -

Af 1

CB PUMPXX Coolant /Recirculatine 29 A.'/

I Pumps j

4

~

  1. 3 A

q

]

3 1

1 4

i i

1 2 Reason i

3 Method 4 Exhibit G 5 Exhibit

)

F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as i

S: Scheduled B-Maintenance or Test 2--Manual Scram.

for Prepara-Source j

C-Refueling j

3-Automatic Scram. tion of Data i

D-Regulatory Restriction 4-Continuation of. Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee 7-M811 Finis t ra tive 5-Load heduetion-Event -Rem t G-Operational Er'ror-explain 9-Other (LER) Pi1e H-Other-explain (NUREG 0161) 4 4

l 4

l

\\

j i

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-311 REPORT MONTH JANUARY 1986 tTNIT NAME: Salem 2 DATE:

February 10, 1986 COMPLETED BY:

J. Ronafalvy TELEPHONE:

609/339-4455

  • DCR NO.

PRINCIPLE BYSTEM SUBJECT No major modifications completed this month.

i

\\

Design Change Request 4

j

~

e

,.mi.

mr.=m

.,ww.

m, w 4,

_m-we.

-.,%~wh 6 ew - Om -

h h

=~

M"**'**+N*6 l

l

l PSE&G1SALEN GENERATING STATION SAFETY RELATED NORK ORDER LOG j

SALEN UNIT 2 11 NO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099180201 i.

2 23MS10 235G RELIEF ti FAILURE DESCRIPTION:

DENAND ON CONTROL IS HIGHjOPEN LIMIT LIGHT IS ILLUNINATED.

}

CORRECTIVE ACTION:

STROKED VALVE AND ADJUSTED CLOSED LIMIT.

8507171117 1

2 2CV69, CHARGING ISOL. VALVE l

FAILURE DESCRIPTION:

2CV69, CHARGING SYSTEN ISOLATION VALVE HAS A PACKING I

LEAK.

l CORRECTIVE ACTION $

ADJUSTED PACKING.

8511010441 2

2SJ2 LINITORQUE l

FATLURE DESCRIPTION:

THE VALVE HAS A PACKING LEAK.

I I

CORRECTIVE ACTION:

TIGHTENED PACKING. LE_AK STOPPED.

I 4

85110404B0 2

2SJ1 LIMITOROUE FAILURE DESCRIPTION:

THE VALVE HAS A PACKING LEAK.

I CORRECTIVE ACTION:

TIGNTENED PACKING.

STOPPED LEAK.

8512060026 2

22 RH18 CONTROL VALVE l'

FAILURE DESCRIPTION:

VALVE HAS A PACKING LEAK.

l l

CORRECTIVE ACTION:

P Q ING FOUND IN GOOD SHAPE.

INSTALLED NEN FLANGE

l, i

SALEN iMEIT 2 j

I WO NO DEPT UNIT EQUIPMENT IDENTIFICATION i

t 8601020135 t

2 24NS10 FAILURE DESCRIPTION:

24NS10 WILL NOT STAY IN AUTO.

j, i

CORRECTIVE ACTION:

REPLACED CONTROLLER 2PC-546C 'IO GET MS10 INTO AUTO.

l' 8601030106 U

2 22GB3 i

FAILURE DESCRIPTION:

REPACK 22GB3.

CORRECTIVE ACTION:

ADDFD 2 RINGS OF PACKING.

8601060633 i

2 21 WASTE GAS COMPRESSOR FAILURE DESCRIPTION:

PUNP WILL NOT RUN AND OTHER PtNtP IS INOPERABLE.

l CORRECTIVR ACTION:

REPLACED BEARING.

i

~

8601060048 i

2 21 S/G PRESSURE CHANNEL II J

FAILURE DESCRIPTION:

921 STEAN GENERATOR PRESSURE CHANNEL II FAILED LOW.

I CORRECTIVE ACTION:

FOUND CHANNEL FAILED LOW.

REPLACED AMP CARD AND CAL CARD ON 2PT-515.

CALIBRATED TO AS LEFT NUMBERS ON CHANNEL SENSOR CAL 2PD-2.5.031.

i i

I

l!i l

i SALEM UNIT 2 1:

i WO NO DEPT INIIT EQUIPMENT IDENTIFICATION 0601100040 2

POPS CH 2 AIR PRESS OHA I

FAILURE DESCRIPTION:

POPS CH 2 AIR PRESS LOW OHA CAME UP WITH CONTROL AIR PRESSURE AT 905; PRESSURE IS UP TO 949, ALARM IS T

STILL UP.

t CORRECTIVE ACTION':

FOUND PRESS DEVICE 2PD9862 TO BE OUT OF CALIBRATION, i

CALIBRATED A NEW DEVICE & TNSTALLED TO CLEAR ALARM.

1 I

3601240763 2

23BF22 i

1, i

FAILURE DESCRIPTION:

VALVE IS LEAKING WATER THRU 1RE PACKING.

I lu I

CORRECTIVE ACTION:'

TIGHTENED' PACKING.

1 j

i i

l 8

),

f-i 1

{

I 4

4 i

t Ji i

4.1 J...

1

/

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NC. 2 JANUARY 1986 SALEM UNIT NO. 2 (Cold shutdown).

Following The Unit began the period in Mode 5 Valve 2PR4, repairs to the inlet flange leak for Prassurizer Safety d was No. 2 Unit was returned to service on 1/05/86 at 0547 hours0.00633 days <br />0.152 hours <br />9.044312e-4 weeks <br />2.081335e-4 months <br /> anon 1/14/86 returned to full power operation. reduced to 94% due to the loss o a

result of shearing of the shcar pins.

On the Unit was returned to full power.

)

1318 hours0.0153 days <br />0.366 hours <br />0.00218 weeks <br />5.01499e-4 months <br /> (the same day),1/19/86 at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, a controlled 22 Reactor Coolant was performed to repair excessive leakage from No.

In addition to the No. 22 RCP seal repefr, No. 24 The Unit was returned to Pump (RCP) seal.

Reactor Coolant Seals was also replaced.

service on 2/03/86 at 0505 hours0.00584 days <br />0.14 hours <br />8.349868e-4 weeks <br />1.921525e-4 months <br />.

..n- - -,,,., -


,-r----..e-----

- /

REFUELING INFORMATION DOCKET No.:

50-311 UNIT NAMER Ralem 2 J. Ronafalvy DATE:

February 10, 1986 COMPLETED BY:

TELEPHONE:

ID9/935-6000 EXTENSION:

3455 Month _ January 1986 f

Refueling information has changed from last month:

YES No _ X 1.

September 20, 1986 hcheduleddatefornextrefueling:

2.

November 19, 1986 4

Scheduled date for restart following refueling:

3.

Will Technical Specification changes or other license 4.

A) amendments be required? NO YES ____

u_

Not determined to date Has the reload fuel design been reviewed by the Station 2

B)

Operating Review Coartittee?

No X

J If no, when is it scheduled? __ August 1986 __

YES I

for submitting proposed licensing actions 5.

Scheduled date (s)

August 1986 if required Important licensing considerations associated with refueling:

6.

L_ _

yong --

~_

f

_.~_

Number of Fuel Assemblies:

193 7.

A)

Incore 140 B)

In Spent Fuel Storage 1170 Present licensed spent fuel stora'ge capacity:

8.

1170 Future spent fuel storage capacity:

Date of last refueling that can be discharged 9.

to spent fuel pool assuming the present March 2003 licensed capacity:

8-1-7.R4 i

____.,m...,____

G PSEG Pue'.c Serv ce Electric and Gas Company P.O. Box E Hancocks B :dge, Ne<. Jerse, 0803E Salem Generating Station rebruary 10, 1986 Director, Office of Inspecticn and Enforcement t

U.S. Nuclear Regulatory Commission Washington, DC 20555 Dear Sir i

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 l

In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specification, 10 copies of the following monthly operating j

reports for the month of January 1986 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, hl 4

J.

. Eupko, Jr.

- - _. ~ ~~

General Manager - Salem Operations.._

JRskch cc: