Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H995 + (ML20202H995)
- ML20202H996 + (ML20202H996)
- 05000324/LER-1986-009, :on 860311,upscale Spike of Reactor Bldg Ventilation Exhaust Radiation Monitor Instrument Trip Unit Occurred.Cause Not Determined.Trip & Isolation Signals Reset & Sys Returned to Svc + (ML20202H998)
- ML20202H999 + (ML20202H999)
- ML20202J003 + (ML20202J003)
- ML20202J004 + (ML20202J004)
- 05000457/LER-1997-005-08, :on 971106,relief Valve 2SI8851 Lifted & Failed to Reseat.Caused by Limited Margin Between Pump Start Pressure Transient & Valve Lift Setpoints.Replaced Failed Relief Valves W/New Valves & Performed Testing + (ML20202J005)
- NPL-98-0099, Forwards Response to Violations Noted in Insp Repts 50-266/97-25 & 50-301/97-25.Corrective Actions:Remainder of Facade Freeze Protection Sys Evaluated & Preliminary Results Indicate That Several Addl Functions Should Be Added + (ML20202J006)
- ML20202J008 + (ML20202J008)
- ML20202J009 + (ML20202J009)
- ML20202J011 + (ML20202J011)
- ML20202J012 + (ML20202J012)
- ML20202J013 + (ML20202J013)
- IR 05000312/1986008 + (ML20202J014)
- ML20202J014 + (ML20202J014)
- ML20202J016 + (ML20202J016)
- ML20202J018 + (ML20202J018)
- ML20202J019 + (ML20202J019)
- ML20202J021 + (ML20202J021)
- ML20202J022 + (ML20202J022)
- ML20202J023 + (ML20202J023)
- 05000482/LER-1986-014, :on 850731 & 860313,hourly Patrols of Fire Dampers Not Performed,Violating Tech Spec 3.7.11.Caused by Personnel Error.Patrols Reestablished & Rept Added to Reading List + (ML20202J025)
- ML20202J026 + (ML20202J026)
- ML20202J027 + (ML20202J027)
- ML20202J031 + (ML20202J031)
- ML20202J032 + (ML20202J032)
- ML20202J033 + (ML20202J033)
- 05000389/LER-1986-005-02, :on 860310,discovered That Time Limit for Performance of Semiannual ESF Sys Relay Surveillance Exceeded.Caused by Failure to Assign Tracking Responsibility to Any Dept.Operations Dept Assigned Tracking + (ML20202J036)
- ML20202J038 + (ML20202J038)
- ML20202J040 + (ML20202J040)
- ML20202J049 + (ML20202J049)
- ML20202J052 + (ML20202J052)
- ML20202J053 + (ML20202J053)
- ML20202J055 + (ML20202J055)
- ML20202J057 + (ML20202J057)
- ML20202J060 + (ML20202J060)
- ML20202J064 + (ML20202J064)
- ML20202J065 + (ML20202J065)
- ML20202J066 + (ML20202J066)
- 05000423/LER-1986-022, :on 860308,while Operating at 30% Power,Two Independent Channels of Steam Generator a Steam Line Pressure Found Failed High Due to Frozen Sensing Lines on Pressure Transmitters.Heat Tracing Reinstalled + (ML20202J067)
- ML20202J068 + (ML20202J068)
- ML20202J069 + (ML20202J069)
- ML20202J071 + (ML20202J071)
- ML20202J072 + (ML20202J072)
- ML20202J073 + (ML20202J073)
- ML20202J074 + (ML20202J074)
- 05000321/LER-1986-013, :on 860305,w/unit in Refueling Mode & During Hydrostatic Test on RWCU Filter/Demineralizer B,Rwcu Sys Isolation Occurred.Cause Undetermined.No Corrective Actions Planned + (ML20202J076)
- ML20202J078 + (ML20202J078)
- ML20202J079 + (ML20202J079)
- ML20202J080 + (ML20202J080)
- ML20202J081 + (ML20202J081)