Responds to Re Jul 1985 Criticality Event & Forwards Insp Rept Containing Review of Event & Other Technical Issues.W/O Rept.Related Info Encl
ML20202J052
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/09/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Petticrew R
MONROE COUNTY, MI
Shared Package
ML20202H992 List:
References
FOIA-86-244 NUDOCS 8607170015
Download: ML20202J052 (13)


Text

__ _ -- . .. _ _. _ _ _ _

SD AA '

RGoyN1 5 JAN 9W ENCLOSURE 18.A Mr. Richard E. Petticrew, Chairman Monroe County Board of Commissioners 106 East First Street -

Monroe, MI 48161

Dear Mr. Petticrew:

This letter is in response to your August 13, 1985 letter to the Nuclear Regulatory Comission related to the July premature criticality event which occurred at the Femi plant. Enclosed is a copy of the recently issued NRC Region III inspection report documenting our review of not only this event, but other technical issues and enforcement matters as well. This report also documents management meetings held by Region III with the Detroit Edison Company on July 23 and September 10, 1985.

I am sending you this copy via express mail so that you and the other Comissioners may have an early opportunity to review these subjects in detail. For your information, I have also provided an expedited copy of the report to Congressman  !

John Dingel's Office. Please note that the utility will be notified of our decision regarding enforcement action under separate correspondence when we complete our actions in this regard. At that time I will also provide you with t topy of our enforcement correspondence. -

Edward Greenman of my staff recently briefed you and the Connissioners at a public meeting regarding the premature criticality event and other techr.ical issues outstanding at the Fermi Plant. I am of the view that dialogue of this type is useful. Again, I plan to brief you prior to the plant being allowed to go above 5% power.

ii you-taveTy quu3t1Uns 7n thi3 7Fgard~, ple&Teoc ntact tnis of fice. 1 Ortcir d f-@' h 3.is C. FeWM James G. Keppler Regional Administrator

Enclosure:

NRC Region III Inspection Report No. 50-341/85040 cc w/ enclosure:

J. R. Eckert, Director, Monroe City-County Office of Civil Preparedness bec: N. Chrissotimos $071$?ise60709 P. Byron PUNTENN86-244 PDR J. Strasma R. Lickus RIII RI RIIT RIII RII G

$nean/las L

>(

No ius A-Davis pler 1/ /86 1/V/86 1/ 86 1/ f/86 1/ 9/86 L __ __ ,. _ _ _ _

1 l

i Enclosure 19 Office of Investigation Shortly after the premature criticality event becune known the Region III Administrator requested the Region III Office of Investigation to investigate the licensee's action surrounding the event. In addition, OI is reviewing aspects of the licensee's handling of the seismic and embedment issues.

OI's reports are pending.

4 Lead Responsibility: 01 22

ss -. ,

Enclosure 20 Office of Investigation and Audit (OIA)

Shortly after the premature criticality event OIA began an investigation into the NRC handling of the event. The OIA report is pending.

1 i

i 1

I Lead Responsibility: DIA

.23

l Enclosure 21 Shift Operation Advisors The Detroit Edison Company committed to and is required by License Condition C.12 to have " Persons with BWR operating Experience on Shift" to make )

up for the lack of operating experience of Detroit Edison Personnel. 1 License Condition C.12 requires: "As a minimum, DECO shall train these advisors on the procedures, Technical Specifications and plant systems for the Fermi 2 facility and DECO shall examine the advisors on these topics at a level which will assure their familiarity with the plant."

At DECO's initiative the 50A's were licensed at the senior reactor operator level. However, DECO opted not to have the SOA participate in the routine operator requalification program but rather put in place a special program for the SOA's.

In an internal Deco memo from S. L. Latone, Director Operations - Training, to

0. K. Earle, Supervisor Licensing dealing with SOA License Status (Enclosure 22A) no special requalification program was described.

Region III DRP and DRS are currently reviewing the licensee's position relative to the issue.

l l

l Lead Responsibility: Region III, DRP/DRS 24

ENCLOSUTE 21.A DidToll Edison Date: June 25, 1985 NT-85-283 To: O. K. Earle, Supervisor

  • Licensing From: Stanley J. Latone, Director J / Lbh Nuclear Operations - Trainingd

Subject:

SOA License Status Mr. P. Byron, NRC and Mr. J. McMillin, NRC discussed the SOA issue and have agreed to except the following:

The SOA's licenses will remain active. A special requalification program will be developed. This program will consist of a pre-test followed by a four week training program detemined by the

_ ._ results of the pre-test. This prpgram will be developed by May 1986, anTimplement one month prior to the 50A's requal date. The 50A's will continue to attend the operating experience segment of requal on a cyclic basis.

If you have any questions, pleas.e contact me on extension 4102.

SJL JTC: nap --

4 e

a

Enclosure 22 Brief Phil Polk on Shift Operations Advisor (SOA)

E. G. Greenman has comitted to brief Chairman's office (Phil Polk) on the SOA issue prior to restart, in response to an earlier Technical Assistant's  ;.

briefing on the premature criticality.

'I I

f Lead Responsibility: Region III, DRP 25

- - - - - - -. . _ _, , : c . - _ _ _ _

s. .

COMMISSION BRIEFING ON FERMI 2 STATUS t

(MARCH /2,1986) t F

- _ . - _ . _.- _ . ._ _ = _. . - -__ _, - - - . ..- . _ .- . -.

FERMI HISTORY l

i LOW POWER LICENSE 3/20/85 PREMATURE CRITICALITY EVENT 7/02/85 COMMISSION MEETING 7/10/85 ,

FULL POWER LICENSE 7/15/85

! UNIT SHUTDOWN 10/11/85 PROJECTED  ?

i 4

=

i

1 CURRENT ISSUES

1. 01 AND OIA INVESTIGATION ISSUES
2. TECHNICAL ISSUES

Encl osure 4

. D I ESEL GENER ATORS DES I GN CH ANGE REV I EWS ------------------ '-----------Enclosure 10, 11, 12, 13 (Copy attached)

3. RESOLUTION OF PERFORMANCE RELATED ISSUES -------------R0IP 3
4. 2.206 PETITION TO ISSUE SHOW CAUSE ORDER d

LICENSEE ACTIONS

1. OPEN TECHNICAL ISSUES

. DIESEL GENERATORS ----------Enclosure 4

- MEETING WITH STAFF

- FORMAL LICENSEE EVALUATION

- ADDITIONAL TESTING

. SEISMI C ISSUE ---------------Enclosure 11

. EMBEDMENT ISSUE-------------Enclosure 12

. DESIGN CHANGE REVIEWS------Enclosure 13

- DESIGN CHANGES FOR 22 SYSTEMS IN QUESTION 4 - S&W REVIEWING NEEDED ACTION h

2. 50.54(F) RESPONSE

. INCREASED INVOLVEMENT BY CEO

. ESTABLISHMENT OF OVERVIEW COMMITTEE

- REVIEW LICENSEE ACTIONS

- MAKE RECOMMENDATIONS RE STARTUP

. PHASED STARTUP

. NEW VP

PERFORMANCE ISSUES AND NRC ACTIONS ISSUE NRC ACTION

1. PREMATURE CRITICALITY EVENT - CAL LIMITING POWER (7/85)

- 01 INVESTIGATION

- OIA INVESTIGATION

- BRIEFED LOCAL 0FFICIALS 1 2. EXCESSIVE PERSONNEL ERRORS - REQUIRED PERFORMANCE (9/85) IMPROVEMENT PROGRAM

- 50.54(F) LETTER i

3. FAILURE TO DISPOSITION KNOWN PROBLEMS; CONTINUED PERSONNEL ERRORS: SECURITY PROBLEMS; DESIGN CHANGE DEFICIENCIES i 4. 2.206 PETITION - CURRENTLY UNDER REVIEW i

S&W EVALUATION COMPLETION OF EtGINEERI!G WORK PURPOSE:

o EVALUATE PROCESS TO DETERMINE IF EIGINEERI!G PACKAGES AND ASSOCIATED CHAtGES TO BE CCNPLETED ARE IDEhTIFIED, PRIORITIZED AND C0!6RCLLED.

SCOPE:

o PROCESS USED DURIto 9 M0hTH PERIOD PRIOR TO FUEL LOAD.

o PROCESS USED SINCE FUEL LOAD.

METHOD:

o REVIEW PROCESS IN PLACE.

o TEST PROCESS IMPLEPINTATION TO DETERMINE IF E!GINEERI!G WORK ITEMS ARENERE (REF SCOPE) BEING INCLUDED IN APPROPRIATE LISTS.

c IMPLEME!EATION WILL BE TESTED USItG PLANS (CHECKLISTS) FOR SELECTED ACTIVITIES & DISCIPLINES.

o DURING THE EVALUATION, IDEhTIFIED POTEtEIAL FINDI!GS/ CONCERNS WILL BE COMMJNICATED TO DECO FOR RESCLUTION.

l 8so l -

._ l

EVALUATION TEAM:

o EXPERIENCED PERSONf EL FROM OFFICES OTHER THAN CHERRY HILL A!!D FERMI-2 SITE ORGANIZATION.

o APPROPRIATE DISCIPLINES REPRESEhTItG CROSS-SECTION OF BACKGROUfDS IN NUCLEAR PCWER PLATE DESIGN, COMPLETION, OPERATION AND EVALUATION.

SCHEDULE / STAT 1JS:

PLANNED ACTUAL o APPROVE PLAN (S) 2/11/86 2/11-13/86 a

o ORIENTATION OF EVALUATION TEAM 2/10-11/86 ALL BUT "IN-PROCESS" COMPL.

o PERFORMANCE 2/11-28/86 INITIATEI) o POST EVALUATION CONFERENCE 3/3/86 ---

o FINAL WRITTEN REPORT 3/21/86 ---