ML20202J064

From kanterella
Jump to navigation Jump to search
Forwards Annual Rept for 1998 of Challenges to Pressurizer PORV or Psvs at Units 1 & 2
ML20202J064
Person / Time
Site: Beaver Valley
Issue date: 01/29/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-017, L-99-17, NUDOCS 9902090031
Download: ML20202J064 (2)


Text

,

{? D I

Beaver Valley Power Station Shippingport, PA 15077-0004

.g SUSHIL C. JAIN (412)093-5512

' Senior Vice President Fax (724) 643-8069 Nuclear Services Nuclear Power Division January 29, 1999 L-99-017 U. S. Nuclear Regulatory Conunission Attention: Document Control Desk

! ashington, DC W

20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Annual Report of All Challenges to the Pressurizer Power Operated Relief or Pressurizer Safety Valves i

Attached is the annual report for 1998 of all challenges to the pressurizer power operated relief valves (PORV) or the pressurizer safety valves at Beaver Valley Power Station L

Unit Nos. I and 2.

Sincerely, j

P g -s_ 2 g Sushil C. Jain c:

Mr. D. S. Collins, Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator l

9

.DiL1VEllNG 9902090031 990129 -

O tl A L 1 T V PDR ADOCK 050003341

[N{RGY P

pg

Beaver Valley Power Station 1998 Annual Report of Pressurizer PORV or Pressurizer Safety Valve Challennes

..c This report is submitted in accordance with the Beaver Valley Power Station Unit Nos. I and 2 Technical Specifications 6.9.1.4 and 6.9.1.5.b, respectively.

l i

Unit 1:

l There were no challenges to the Power Operated Relief Valves (PORV) at Unit I during the period of January 1,1998, to December 31,1998.

i There were no challenges to the pressurizer safety valves at Unit I during the period of I

January 1,1998, to December 31,1998.

l Unit 2:

l t

There were no challenges to the PORVs at Unit 2 during the period of January 1,1998, to December 31,1998.

i There were no challenges to the pressurizer safety valves at Unit 2 during the period of l

January 1,1998, to December 31,1998.

j l

i e

l 6

i I

l i

y

+

4 6

-