aS l
GPU Nelear. In:
One Upver Pond fined g.
'"'*"t NM "
NUCLEAR bl 201316 M00 December 5,1997 6730 97 2240
}.
U. S. Nuclear RegulatoryCommission
{
Attn: Document Control Desk Washington.DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50 219 Facility Operating License No. DPR 16 Additionalinformation Related to 10 CFR 50.54(f) Response i
References:
(1) GPU Nuclear f etter 6730 97 2011," Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Re: Adequacyand Availabilityof Design liasis Information," dated 2/10/97.
Sin;c the submittal of GPU Nuclear's 10 CFR 50.54(0 response, Reference 1, several NRC Inspections have identified concerns related to design basis issues. Many of these concerns could have been avoided with more effective implementationof our corre<:tive action processes. In response to these concerns, GPU Nuclear has taken an initiative to improve our cormetive acilon process. Specifically,GPU Nuclear intends to implement an improved corrective action system common to both Oyster Creek and Three Mile Island Unit 1 (TMI-1), lmprovementsinclude (l) clear requirements for timeliness of deliciency reporting, response to deficiencies and escalation, (2) use of a graded approach to establish the significance of the deficiency and clear requirements for reportin;;and resolving deficiencier,.and (3) requirements for verification of corrective action completion prior to closcout of significant conditions adverse to quality. The system is scheduled
' for implementation by April 1,1998. GPU Nuclear believes that this will result in a signliicant improvement in maintaining our design basis information and therefore is making this initiative to new and additional commitment to those already made in our 10 CFR 50.54(f) response.
In addition to this new commitment, CPU Nuclear is revising one comtv.itment made in Reference
- 1. Specifically, Commitment 7 stated that GPU Nuclear would " Complete five tone partial) and
'\\
POR ADOCK 05000219 fk 9712110022 9712os P I
Mlf%Ipp
'n
1
(
6730 97 2240 Page 2 of 3 upgrade two SDilDs"by 12/31/07 The tevised Commitment 7 stat (s" Complete /upgradeat least four SDilhs and revise cmrently issued SDilDs as dictated by the results of a one time detailed I SAR revici/' ny 9/30/98. This conunitment is being changed to provide the option ta revise or update existing SDilDs instead of preparing oew ones and to also add scope flexibility. 'lhe completion date is beintt civmged to coincide with the completion date for the one time detailed 1 SAR review (Commitment 8). The ra:ionale for the revised commitment is the improvement of the integration of Oyster Creck's design and licensing bases. This hnproved integration will be achieved by realigning any addi'ional deaign bases teconstitutionwork with the one time detailed I;SAR reviewimd will be maintained by the implementationor!!P 045 (Commitment 1). Although we are changing the number of SDilDs and their completion date, GPU Nuclear h, still providing a total design bases reconstitutioneffort of equivalent scope. OpU Nuclear's current status on Commitment 7 is that one new SDilD has already been completed and the upgrade of an existing SDilD is being Analimi. provides an updated list of GPU Nuclear's 10 Ci:R 50.54(f) resronse conunitments.
If you have any questions or cornments on this matter, please contact Ron Zak, Corporate Regulatoiy Affairs at (973) 316 7035.
Very truly yours
/[7lh..g/N U
T. Gary limughton President GPU Nuclear,Inc.
I
6730 97 2240 Page 3 of 3 1, T. Gaiy Broughton being duly sworn, state that I am President and Chief Executive 00icer of GPU Nuclear,Inc. and that I am duly authorized to execute and file tnis response on behalf of GPU Nuclear. To the best of my kntmledge and belief, the statements contained in this documcnt me s
true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CPU Nuclear employees and/or consultants. Such informationhas been revieweclin accordance v i h company practices and I believe it to be reliable.
t Jkpg
~
ts T. Gary Ilmughton President GPU Nuclear,Inc.
i d
M4 g4 #
A Notary I ublic of NJ JULIEf4f4E J. SCHOFFSTAll.
140 TAM PUBLIC OF NEW JrR$EY My Commission Empires Jene 24. 2002 L
c: Administrator NRC Region 1 Senior Resident inspector,0yster Cr:ek Oyster Creek NRC Project hlanager
. _ ~ _
o o
6730 97 2 40 PageIof2 Commitments and Status
' Ommitment Descr6ption -
Status /
]-
Number Completion Date -
1 Develop Engineering Division Procedure lip 04) to improve the Complete review and update process in the following areas:
listablish a periodic review of the SDilDs and FS AR to ensure consistency.
Provide improved process for SDBD maintenance and j
Control.
Develop improved guidelines and process for biennial
=
FSAR *Jpdate.
2 Consolidate resolution tracking for SDilD and SSF1 open items by Complete
+
entering them into the Deviation Report process to achieve a timely t
and effective resolution.
Complete 3
Complete procedure revisions for and training on an improved process for control and update of calculations and TDRs.
4 Utilize established processes to evaluate those systems under Complete consideration to establish future design basis reconstitution P
activities.
5
' Conduct personnel training on design basis issues and Me ne.v 12/31/97 FSAR update process (lip-045).
6 Develop a specific plan and schedule for improving setpoint basis Complete documentation / references.
7 Completc/upgradeat least four SDHDs and revise currently issued 900/98 (Revised)
SDBDs as dictated by the results of a one time detailed FSAR review.
j e
w
.,-.,----..~-..:--
~
0 o
6730 07 2240 Attachmeat i Page 2 of 2 (con't)
_ Commitments and Status
~
Commihnent Description Statusi Number Completion Date 8
Develop and implement a one time detailed FS AR review.
9/30/98 Implement an improved corrective action systtEcommon to both 4/1/98 9
(New)
Oyster Creek and TMI l which will include:
Clear requirements for timeliness of deficiency reporting, response to deliciencies and escalation.
Use of a graded approach to establish the significanceof the deficiency and clear requirements for reporting and resolvingdeficiencies.
Requirements for verification of corrective action completion prior to closcout of significant conditions adverse to quality.
SDilD = SystemDesignllasesDocument TDR = TechnicalData Report
.