d p MGu UNITED STATES q#*g NUCLEAR CEGULATORY COMMisslON
' f 799 ROO5eveLT ROAD S
REGION 111 L-g cLem ettym itunOis soin gg / 81986 MEMORANDUM FOR:
Nicholas J. Chrissotimes, Branch Chief, Division of Reactor Projects FROM:
Edward G. Greenman, Deputy Director, Division of Reactor Projects
SUBJECT:
FERMI 2 SOUTH REACTOR FEEDWATER PUMP TURBINE FAILURE (DN50-341)
Enclosed is the final inspection report feeder prepared by E. L. Meils, a Region III consultant.
I am of the view that this report is sufficient to address the specific feedwater turbine allegations that are part of our overall action plan containing this and several other allegations.
I recomend you include applicable documentation on this issue in one special inspection report which I envision would address all of the outstanding Fermi allegations.
After reviewing the report contents, your final write-up should include an evaluation for enforcement action covering the following areas:
1.
Deficient installation documentation 2.
Turbine to pump alignment not performed according to procedure 3.
Failure to incorporate warm-up procedures during the preoperational test program.
4.
Failure of operations to investigate vibration alarms 5.
Adequacy o' the preoperational test program.
For information, I still plan to meet with the alleger and go over the action plan we have developed.
I would anticipate completing this effort in early March.
In the interim, please provide me with a status report on allegation followup and any items which would require additional inspection prior to a plant restart.
<j, &.&st.LW ward G. Greenman, Deputy Director Division of Reactor Projects
Enclosure:
Inspection Report Feeder (South Reactor Feedwater Pump. Failure) cc w/ enclosure:
A. B. Davis C. E. Norelius e607170021 e60709 R. Lickus PDR FOIA C. H. Weil PUNTENN86-244 PDR G. C. Wright