Forwards Final Insp Rept Feeder by El Meils Re Feedwater Pump Turbine Failure.Listed Areas for Evaluation for Enforcement Action Should Be Included in Final write-up
ML20202J080
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/28/1986
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20202H992 List:
References
FOIA-86-244 NUDOCS 8607170021
Download: ML20202J080 (1)


Text

-

w

^

d p MGu UNITED STATES q#*g NUCLEAR CEGULATORY COMMisslON

' f 799 ROO5eveLT ROAD S

REGION 111 L-g cLem ettym itunOis soin gg / 81986 MEMORANDUM FOR:

Nicholas J. Chrissotimes, Branch Chief, Division of Reactor Projects FROM:

Edward G. Greenman, Deputy Director, Division of Reactor Projects

SUBJECT:

FERMI 2 SOUTH REACTOR FEEDWATER PUMP TURBINE FAILURE (DN50-341)

Enclosed is the final inspection report feeder prepared by E. L. Meils, a Region III consultant.

I am of the view that this report is sufficient to address the specific feedwater turbine allegations that are part of our overall action plan containing this and several other allegations.

I recomend you include applicable documentation on this issue in one special inspection report which I envision would address all of the outstanding Fermi allegations.

After reviewing the report contents, your final write-up should include an evaluation for enforcement action covering the following areas:

1.

Deficient installation documentation 2.

Turbine to pump alignment not performed according to procedure 3.

Failure to incorporate warm-up procedures during the preoperational test program.

4.

Failure of operations to investigate vibration alarms 5.

Adequacy o' the preoperational test program.

For information, I still plan to meet with the alleger and go over the action plan we have developed.

I would anticipate completing this effort in early March.

In the interim, please provide me with a status report on allegation followup and any items which would require additional inspection prior to a plant restart.

<j, &.&st.LW ward G. Greenman, Deputy Director Division of Reactor Projects

Enclosure:

Inspection Report Feeder (South Reactor Feedwater Pump. Failure) cc w/ enclosure:

A. B. Davis C. E. Norelius e607170021 e60709 R. Lickus PDR FOIA C. H. Weil PUNTENN86-244 PDR G. C. Wright