Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P790 + (ML20198P790)
- ML20198P793 + (ML20198P793)
- ML20198P794 + (ML20198P794)
- ML20198P796 + (ML20198P796)
- 05000370/LER-1997-002-01, Forwards LER 97-002-01 Re Reactor Trip Which Occurred Due to RCP Motor Failure.Rev Submitted to Reflect Changes to Commitment W/Regard to Replacement of Unit 2B RCP Motor + (ML20198P797)
- ML20198P799 + (ML20198P799)
- ML20198P803 + (ML20198P803)
- ML20198P806 + (ML20198P806)
- ML20198P807 + (ML20198P807)
- ML20198P808 + (ML20198P808)
- ML20198P809 + (ML20198P809)
- ML20198P812 + (ML20198P812)
- ML20198P816 + (ML20198P816)
- ML20198P818 + (ML20198P818)
- ML20198P820 + (ML20198P820)
- ML20198P821 + (ML20198P821)
- RBG-44218, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-13 on 970720-0830.Corrective Actions:Control Panel Lineup Immediately Performed for Division 1 Dg,Shift Briefing Form Generated & Individuals Involved Counseled + (ML20198P822)
- PY-CEI-NRR-2253, Submits Supplemental Response to NOV EA-96-253.Util Accepts DOL Administrative Review Board Ruling as Further Clarification on Issue of What Does & Does Not Constitute Protected Activity Under Section 211 of ERA + (ML20198P823)
- ML20198P824 + (ML20198P824)
- ML20198P826 + (ML20198P826)
- ML20198P827 + (ML20198P827)
- ML20198P829 + (ML20198P829)
- ML20198P830 + (ML20198P830)
- NSD-NRC-97-5414, Forwards Responses to RAIs Re Comments on AP600 Normal Rhrs from Reactor Sys Branch on Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (ML20198P833)
- ML20198P835 + (ML20198P835)
- ML20198P836 + (ML20198P836)
- NSD-NRC-97-5412, Responds to RAI Re Comments on Sgs in Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (ML20198P838)
- 05000259/LER-1986-015-01, :on 860424 & 29,during Installation of Permanent Switch Protective Covers on Reactor Protection Sys (RPS) MG Panel Switches,Rps Trip Occurred.Caused by Accidental Bump of Control Switch + (ML20198P840)
- ML20198P841 + (ML20198P841)
- ML20198P843 + (ML20198P843)
- ML20198P845 + (ML20198P845)
- ML20198P847 + (ML20198P847)
- ML20198P849 + (ML20198P849)
- ML20198P850 + (ML20198P850)
- ML20198P852 + (ML20198P852)
- NRC-98-0013, Provides Committed Written Justification for Operating W/Replacement Pilot Assemblies for Duration of Operating Cycle + (ML20198P853)
- ML20198P856 + (ML20198P856)
- 05000370/LER-1997-002-03, :on 970711,reactor Tripped Due to RCP Motor Failure.Caused by Design/Manufacturing Deficiency Which Existed in Nc Pump Motor.Motor Stator 2D Was Replaced W/Rewound Spare + (ML20198P857)
- ML20198P858 + (ML20198P858)
- ML20198P859 + (ML20198P859)
- ML20198P864 + (ML20198P864)
- L-97-055, Forwards Dqe & Dl Organization Chart as of 970915, Illustrating pre-merger Dqe Organization,As Requested in + (ML20198P865)
- ML20198P866 + (ML20198P866)
- ML20198P867 + (ML20198P867)
- ML20198P868 + (ML20198P868)
- ML20198P869 + (ML20198P869)
- ML20198P870 + (ML20198P870)
- ML20198P872 + (ML20198P872)
- ML20198P877 + (ML20198P877)
- ML20198P879 + (ML20198P879)
- NG-98-0016, Application for Amend to License DPR-49,revising LCO for PCIVs in TS Section 3.7.B to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys,Per NUREG-1433 + (ML20198P881)