ML20198P867

From kanterella
Jump to navigation Jump to search
Forwards Forms of Gfes Written Operator Licensing Exam Administered on 971008 to Employees at Facility.Copies Include Answer Keys,Grading Results & Individual Answer Sheets for Each Employee.W/O Encls
ML20198P867
Person / Time
Site: Millstone  
Issue date: 11/05/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: James Smith
NORTHEAST UTILITIES
References
NUDOCS 9711120037
Download: ML20198P867 (2)


Text

'

N November 5, 1997 l

l Mr. Jeff Smith Manager Operator Training Millstone 1, 2, 3 Northeast Utilities Energy Company P. O. Box 128 Waterford, Connecticut 06385

Dear Mr. Smith:

On October 8,1997, the NRC administered a generic fundamentals examination (GFE) section of th,e written operator licensing examination to employees of your facilities.

Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Three individuals from Millstone No.1 and one individual from Millstone No. 2 were administered the examination and four passed the examination. Please forward the results to the individuals along with the copies of their answer sheets. A "P" in the column labeled RESULTS indicates a passing grade of 80 percent or better on the GFE. Those individuals having an "F" in the RESULTS column failed the examination.

If you have any questions'concerning this examination, please contact Mr. Ivan Kingsley at 203-442 4355, Ext 451.

Sincerely, Original signed by Glenn W. Meyer, Chief Operator Licensing and

\\

Human Performance Branch g

Docket No. 50-245/336

Enclosures:

.q Y

1. Examination Form "A" and Form "B" with answers
2. Examination Results Summary for Millstone 1 and 2

}q

3. Individual Answer Sheets 7

.) )

OFFICIAL RECORD COPY P" MUM' I

c555M81!!9 l

__J

)

i Millstone 1 and 2 cc w/o enclosures:

N. S. Carns, Senior Vice President and Chief Nuclear Officer J. McElwain, Unit 1 Recovery Officer M. Bowling, Jr., Unit 2 Recovery Officer D. M. Goebel, Vice President Nuclear Oversight l

D. B. Amerine, Vice President for Engineering and Support Services 4

P. D. Hinnenkamp, Director, Unit Operations L. M. Cuoco, Senior Nuclear Counsel F. C. Rothen, Vice President, Work Services 1

J. Stankiewicz, Training Recovery Manager R. Johannes, Director, Nuclear Training j

P. Weekley, Security Manager-J. R. Egan, Esquire V. Juliano, Waterford Library l

J. Buckingham, Dept. of Public Utility Control S. B. Comley, We The People State of Connecticut SLO D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block,. Attorney, CAN S. Luxton, Citizens Regulatory Commission Representative T. Concannon E. Woollacott, Co Chairman, NEAC NRC Resident inspector PUBLIC bec w/o enclosures:

GFE File DOCUMENT NAME: P:\\gfremil OFFIC Rl/DRS Rl/DRS Rl/

Rl/

Rl/

E NAME Curley kd Meyer f v v S

11/c /97 11/$/97 DATE OFFICIAL REdORD COPY w

,,e

--c.