Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P705 + (ML20198P705)
- ML20198P706 + (ML20198P706)
- ML20198P709 + (ML20198P709)
- ML20198P710 + (ML20198P710)
- ML20198P712 + (ML20198P712)
- ML20198P713 + (ML20198P713)
- 05000455/LER-1997-003-08, :on 971010,reactor Trip Occurred,Due to age-related Failures of Redundant Power Supplies That Went Undetected by Alarm Sys.Modification to Power Supply Failure Alarm Will Be Submitted to TRC for Review + (ML20198P715)
- ST-HL-AE-5783, Submits 30-day Rept Re Significant Changes to Accepted Large Break LOCA ECCS Evaluation Model at Units 1 & 2 + (ML20198P717)
- ML20198P718 + (ML20198P718)
- L-97-049, Submits Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, + (ML20198P721)
- ML20198P723 + (ML20198P723)
- ML20198P725 + (ML20198P725)
- ML20198P726 + (ML20198P726)
- 05000338/LER-1997-008, :on 971027,both EDGs Inoperable During Testing. Caused by TS Surveillance Requirement to Demonstrate Operability of Remaining EDG When One Inoperable.Required TS Actions Cleared Following 1J EDG Testing + (ML20198P727)
- ML20198P728 + (ML20198P728)
- B16842, Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting + (ML20198P731)
- ML20198P732 + (ML20198P732)
- ML20198P733 + (ML20198P733)
- ML20198P734 + (ML20198P734)
- ML20198P736 + (ML20198P736)
- ML20198P737 + (ML20198P737)
- ML20198P739 + (ML20198P739)
- BSEP-97-0483, Submits Revisions to Plant Emergency Procedures.List of Rev Procedures & Summary of Changes Encl + (ML20198P740)
- ML20198P742 + (ML20198P742)
- ML20198P743 + (ML20198P743)
- ML20198P746 + (ML20198P746)
- ML20198P748 + (ML20198P748)
- 05000219/LER-1997-016, :on 971212,monitors May Not Have Operated for Required Time Due to Inadequate Calculation.Increased Low Pressure Limit of Reagent Gases & Ensures That Installed Gas Bottles Had Sufficient Pressure + (ML20198P749)
- ML20198P750 + (ML20198P750)
- ML20198P752 + (ML20198P752)
- ML20198P754 + (ML20198P754)
- ML20198P755 + (ML20198P755)
- ML20198P756 + (ML20198P756)
- ML20198P758 + (ML20198P758)
- ML20198P759 + (ML20198P759)
- 05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed + (ML20198P760)
- ML20198P763 + (ML20198P763)
- 05000263/LER-1997-014-01, :on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test + (ML20198P764)
- ML20198P767 + (ML20198P767)
- ML20198P768 + (ML20198P768)
- ML20198P769 + (ML20198P769)
- ML20198P770 + (ML20198P770)
- ML20198P771 + (ML20198P771)
- ML20198P772 + (ML20198P772)
- ML20198P774 + (ML20198P774)
- ML20198P778 + (ML20198P778)
- ML20198P779 + (ML20198P779)
- L-97-056, Submits Special Rept Documenting Results of ISI of SG Tubes, Performed During Unit 1 Twelfth Refueling Outage on 971026. Number of Tubes Inspected & Breakdown of Tubes Removed from Svc for Each SG Documented in Table 1 + (ML20198P780)
- ML20198P781 + (ML20198P781)
- ML20198P782 + (ML20198P782)
- L-97-048, Confirms Completion of Requested Actions of GL 96-01. Actions Completed Prior to Completion of First Refueling Outage Following 970110 & Included Listed Instrumentation + (ML20198P783)