Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196L150 + (ML20196L150)
- ML20196L152 + (ML20196L152)
- ML20196L154 + (ML20196L154)
- ML20196L156 + (ML20196L156)
- ML20196L157 + (ML20196L157)
- ML20196L158 + (ML20196L158)
- ML20196L160 + (ML20196L160)
- ML20196L161 + (ML20196L161)
- IR 05000029/1986099 + (ML20196L164)
- 05000458/LER-1999-008, :on 990418,uplanned Automatic Closure of Div III DG Output Breaker Was Noted Due to Loss of Normal Power to Div III Switchgear During Testing.Caused by Personnel Error.Returned Electrical Lineup to Normal.With + (ML20196L165)
- 05000266/LER-1999-001-02, Forwards LER 99-001-02 Re SI Recirculation Flow Line to RWST Frozen,Providing Rev to Internal Flooding Evaluation Discussed Safety Assessment Section of Encl Rept + (ML20196L166)
- ML20196L171 + (ML20196L171)
- ML20196L172 + (ML20196L172)
- 05000446/LER-1999-003, :on 990421,discovered That CR HVAC Train a Was Outside TS AOT Limits Due to Blown Fuse.Caused by Incorrect Landing of Wires That Provide Relay Control Power for CR Ventilation Circuitry.Fuse Was Replaced.With + (ML20196L173)
- ML20196L174 + (ML20196L174)
- SVP-99-105, Informs NRC of Rev to Schedule for Completing Setpoint/ Uncertainty Calculations & Procedure Changes,Originally Planned for Completion on 990529 + (ML20196L175)
- ML20196L176 + (ML20196L176)
- BVY-99-071, Corp 1998 Annual Rept. with + (ML20196L177)
- ML20196L179 + (ML20196L179)
- ML20196L180 + (ML20196L180)
- ML20196L182 + (ML20196L182)
- ML20196L184 + (ML20196L184)
- ML20196L185 + (ML20196L185)
- ML20196L187 + (ML20196L187)
- ML20196L188 + (ML20196L188)
- ML20196L189 + (ML20196L189)
- ML20196L190 + (ML20196L190)
- IR 05000322/1988005 + (ML20196L191)
- ML20196L193 + (ML20196L193)
- ML20196L194 + (ML20196L194)
- 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs + (ML20196L196)
- ML20196L199 + (ML20196L199)
- ML20196L200 + (ML20196L200)
- ML20196L203 + (ML20196L203)
- ML20196L204 + (ML20196L204)
- ML20196L205 + (ML20196L205)
- ML20196L206 + (ML20196L206)
- ML20196L207 + (ML20196L207)
- ML20196L208 + (ML20196L208)
- 05000334/LER-1999-008, :on 990423,missed IST Program Surveillance Attribute,Was Identified.Caused by Inappropriate Exclusion of Testing Two Valves in Closed Direction within Original IST Program.Ist Program Revised.With + (ML20196L210)
- ML20196L211 + (ML20196L211)
- 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed + (ML20196L212)
- ML20196L213 + (ML20196L213)
- HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel + (ML20196L216)
- ML20196L219 + (ML20196L219)
- 05000454/LER-1999-001-05, :on 990422,depressing Both Feedwater Isolation Reset Pushbuttons Leads to LCO 3.0.3 Entry.Caused by Implementation Error in Procedure Review for Conversion to Its.Review of Procedures Will Be Conducted + (ML20196L220)
- ML20196L221 + (ML20196L221)
- ML20196L222 + (ML20196L222)
- ML20196L223 + (ML20196L223)
- ML20196L224 + (ML20196L224)
- ML20196L225 + (ML20196L225)