Forwards Pmpr 99-8, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990410- 0507.Diskette Containing Pmpr in Wordperfect 8 Format Encl Also.Five Deliverables Were Transmitted as Indicated
ML20196L157
Person / Time
Site: 07200020
Issue date: 05/20/1999
From: Patrick W
CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES
To: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20196L159 List:
References
CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9905270036
Download: ML20196L157 (1)


Text

7 Center for Nuclear Waste RegulatoryAnalyses 622WLEBRA ROAD e P.O. DRAWER 28510 ' SAN ANTONIO. TEXAS, U.SA 782280510 (210) 522 5160

  • FAX (210) 522-5155 May 20' 1999 l

Account No. 20-1402-158 U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Program Management, Policy Development and Analysis Staff Mail Stop 8-A23 Washington, IX: 20555

Subject:

CNWRA Program Manager's Periodic Report on Activities of the Center for Nuclear Waste Regulatory Analyses for Period 8-FY1999

Dear Mr. Linehan:

The enclosed " Program Manager's Periodic Report"(PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses for the period April 10-May 7,1999. Its contents comply with the requirements of section F.1.5 of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.

Cost variance analyses are provided for the Division of Waste Management (D1035). Tank Waste Remediation System (J5164), Three Mile Island Unit 2 Independent Spent Fuel Storage Instaliation (J5186), Dry Transfer System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), and j

Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes, as well as for composite spending on this contract. All variances are expressed with regard to the current operations plans.

J l

During period 8, six intermediate milestones were introduced and four schedule changes were made as reflected in table 2. Five deliverables were transmitted as indicated in table 3.

Please contact me or Mr. Henry Garcia if you have questions regarding this repprt.

Yyor/

j/

7 Sincer

'f Kf Wesley C. Pat ck President Enclosures I

cc:

B. Meehan J. Greeves S. Shankman

yHM5, C. Paperiello J. Holonich M. Federline D. DeMarco E. Ten Eyck CNWRA Directors / Element Managers B. Stiltenpole (38)

J. Piccone S. Boyanowski(SwRI Contracts) g y -ll E. Brach F. Miraglia d hh t

v' 9905270036 990520 Q

i PDR WASTE G

11 PDR a

Washington Othce

  • Twinbrook Metro Plaza, #210 *12300 Twinbrook Parkway

$lNY l/V,!0(f.$u(/

Y{tfbf(

/bilk

{b!ifl b'