Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-98-044, on 980901,female Patient Was Administered 9.2 Mci of Sodium Iodide I-131 for Treatment of Thyroiditis.On 981005,subject Patient Informed Licensee That She Was Pregnant.Licensee Notified Referring Physician of Event + (ML20196A434)
- ML20196A437 + (ML20196A437)
- ML20196A438 + (ML20196A438)
- B12797, Discusses Issue of Formally Incorporating Schedule for Correction of Human Engineering Discrepancies Identified During Crdr Into Isap.Issuance of License Condition Prior to 880225 Requested + (ML20196A439)
- ML20196A441 + (ML20196A441)
- PNO-IV-98-056, on 981123,licensee Reported That Two Industrial Radiography Overexposures Had Occurred.Licensee Has Removed Both Individuals from Activities Involving Radioactive Matls.Region IV Will Dispatch Inspector to Site + (ML20196A444)
- CEO-88-359, Requests That SER for Amend 92 Be Revised to Extend Refueling Interval for Reactor Vessel Vent Valves to Cycle 8 Refueling Outage,But No Later than Sept 1989.Safety Analysis Encl + (ML20196A446)
- ML20196A447 + (ML20196A447)
- ML20196A448 + (ML20196A448)
- 05000457/LER-1988-031, :on 881105,reactor Trip Due to Negative Rate Trip on All Instrumentation Sys Power Range Channels Occurred.Caused by Incorrect Relay 1H Setting Due to Conflicting Info in Technical Manual + (ML20196A449)
- ML20196A450 + (ML20196A450)
- 05000456/LER-1988-024-04, :on 881031,operator Noted That Hydraulic Pump on 1A MSIV Pumping Continuously.Caused by Failure of M1 Four Way Valve.Nuclear Work Request A26531 Written to Replace Defective Four Way Hydraulic Valve M1 + (ML20196A451)
- ML20196A452 + (ML20196A452)
- ML20196A453 + (ML20196A453)
- ML20196A454 + (ML20196A454)
- ML20196A455 + (ML20196A455)
- ML20196A457 + (ML20196A457)
- IR 05000298/1988017 + (ML20196A460)
- ML20196A461 + (ML20196A461)
- ML20196A463 + (ML20196A463)
- ML20196A464 + (ML20196A464)
- ML20196A465 + (ML20196A465)
- ML20196A468 + (ML20196A468)
- ML20196A469 + (ML20196A469)
- ML20196A471 + (ML20196A471)
- ML20196A475 + (ML20196A475)
- ML20196A476 + (ML20196A476)
- ML20196A477 + (ML20196A477)
- ML20196A480 + (ML20196A480)
- ML20196A482 + (ML20196A482)
- PNO-I-88-016, on 880201,fire in Annunciator Panel,Located in Cable Spreading Room,Caused Loss of All Control Room Annunciators.All Emergency Sys Remained Functional During Event.Cause Not Determined.Troubleshooting in Progress + (ML20196A483)
- ML20196A484 + (ML20196A484)
- 2CAN018802, Responds to 871117 Request for Comments Re Emergency Feedwater Sys Review Team Findings.Addl Major Mods,Including Alternate Method of Providing Water to Steam Generators,Not Warranted + (ML20196A487)
- ML20196A488 + (ML20196A488)
- IA-88-571, Final Response to FOIA Request for Documents.Forwards Computer Printout of Records Available in PDR Re Chernobyl Accident & Listing of Repts Available Through Us Gpo & NTIS Identified During 881130 Telcon W/ D Lavins.W/O Printout + (ML20196A490)
- ML20196A490 + (ML20196A490)
- 05000423/LER-1988-018, :on 880519,two Reportable Events Re Control Bldg Inlet Ventilation High Radiation Control Bldg Isolation Trip Setpoint Discovered.Caused by Administrative Error. Default Values Changed to Comply W/Tech Specs + (ML20196A491)
- ML20196A492 + (ML20196A492)
- 05000373/LER-1988-002-03, :on 880316,Type B & Type C Total Leakage Exceeded 0.6 La During Leak Rate Testing.Caused by Excessive Leakages.Corrective Actions Include Installment of New Disc Listed in Table 1 + (ML20196A493)
- ML20196A495 + (ML20196A495)
- ML20196A496 + (ML20196A496)
- ML20196A497 + (ML20196A497)
- ML20196A498 + (ML20196A498)
- ML20196A503 + (ML20196A503)
- 05000338/LER-1988-025-01, :on 881101,Tech Spec 3.6.2.2 Violated.Caused by One Recirculation Spray Subsystem W/One Casing Cooling Subsystem Inoperable.Functional Testing on Casing Cooling Tank Level Transmitters Stopped + (ML20196A504)
- ML20196A506 + (ML20196A506)
- ML20196A507 + (ML20196A507)
- PM-88-003, Monthly Operating Rept for Dec 1988 + (ML20196A511)
- IR 05000334/1988027 + (ML20196A512)
- 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER + (ML20196A513)
- ML20196A515 + (ML20196A515)