Confirms That Preoperational Test 2-3BB-05 Completed.Util Considers Confirmatory Item 28 Resolved
ML20196A507
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/30/1988
From: Bailey J
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.01, TASK-TM GN-1518, NUDOCS 8812060026
Download: ML20196A507 (1)


Text

. _ _ _

Georg a Fbwer Company Mt Oftco Box 282

. Ve>rc5bora Gectg.a 30830 04 81 4 W;"R?'21~"'"*

B rm<gham, Alabama 35202 w-e m.70 ""

Vogtle Project November 30, 1988 United States Nuclear Regulatory Commission ATTN: Document Control Desk File:

X7BC35 Washington, D. C.

20555 Log: GN-1518 PLANT V0GTLE - UNIT 2 NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 CONFIRMATORY ITEM 28: COMPLIANCE WITH NUREG-0737, ITEM II.K.3.1 Gentlemen:

This letter is to confirm that Preoperational Test 2-3BB-05, has been completed.

The test results verify that the controls for the Power Operated Relief Valves (PORV's) automatic block valves will close the valves on decreasing pressure as required by TMI-2 Action Plan Item II.K.3.1.

Based on the results of this testing, Georgia Power Company considers Confinnatory Item 28 to be resolved.

If any additional information is required, please do not hesitate to contact me.

Sincerely.

.I.

4 J. A. Bailey Project Licensing Manager l

JA8/wkl xc:

NRC Regional Administrator l

NRC Resident Inspector P. D. Rice l

R. A. Thomas l

B. W. Churchill, Esquire l

J. E. Joiner, Esquire l

J. B. Hopkins (2) l G. Bockhold, Jr.

I R. J. Goddard, Esquire go0)

R. W. McManus v

Yogtle Project File I 0 i

8912060026 681130

^

l PDR ADOCK 05000425 A

PDC