Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-97-046, on 970801,Maine Yankee Announced That Negotiations W/Peco Have Ceased & Plant Owners Agreed to Proceed W/Decommissioning.Majority of Contractors Released in May When Board Elected to Minimize Spending + (ML20151K299)
- ML20151K301 + (ML20151K301)
- ML20151K303 + (ML20151K303)
- 05000498/LER-1988-040, :on 880623,surveillances Identified W/Tech Specs Re Reactor Trip Breaker Test Intervals Scheduled W/Method Which Could Result in Improper Staggering of Test Intervals.Caused by Inadequate Program + (ML20151K305)
- 05000334/LER-1997-015, :on 970501,voluntary Entry Was Proceduralized Into TS 3.0.3 by Allowing Bypass of Source Range Channels Input to High Flux Trip.Caused by Misinterpretation of TS 3.3.1.1,Table 3.3-1,Item 6.Changed Procedure + (ML20151K308)
- ML20151K309 + (ML20151K309)
- ML20151K310 + (ML20151K310)
- ML20151K312 + (ML20151K312)
- ML20151K320 + (ML20151K320)
- ML20151K323 + (ML20151K323)
- ML20151K327 + (ML20151K327)
- ML20151K331 + (ML20151K331)
- IR 05000313/1988017 + (ML20151K334)
- ML20151K334 + (ML20151K334)
- ML20151K337 + (ML20151K337)
- ML20151K338 + (ML20151K338)
- ML20151K341 + (ML20151K341)
- ML20151K343 + (ML20151K343)
- ML20151K346 + (ML20151K346)
- ML20151K355 + (ML20151K355)
- ML20151K356 + (ML20151K356)
- ML20151K360 + (ML20151K360)
- ML20151K361 + (ML20151K361)
- ML20151K364 + (ML20151K364)
- ML20151K369 + (ML20151K369)
- ML20151K372 + (ML20151K372)
- ML20151K373 + (ML20151K373)
- ML20151K377 + (ML20151K377)
- PNO-III-88-066, on 880724,unit Shut Down to Investigate Ground (Short) in Main Generator.Plant Expected to Remain Shut Down for 2 to 6 Wks for Generator Repairs + (ML20151K378)
- ML20151K379 + (ML20151K379)
- ML20151K380 + (ML20151K380)
- ML20151K383 + (ML20151K383)
- ML20151K384 + (ML20151K384)
- ML20151K387 + (ML20151K387)
- ML20151K390 + (ML20151K390)
- ML20151K393 + (ML20151K393)
- ML20151K394 + (ML20151K394)
- ML20151K395 + (ML20151K395)
- ML20151K399 + (ML20151K399)
- ML20151K401 + (ML20151K401)
- ML20151K403 + (ML20151K403)
- ML20151K406 + (ML20151K406)
- ML20151K408 + (ML20151K408)
- ML20151K414 + (ML20151K414)
- ML20151K419 + (ML20151K419)
- PNO-III-88-067, on 880722,controlled Shutdown Initiated to Repair Steam Leak.Unit Down for More than 48 H for Steam Leak Repair & Portions of Piping Which Exhibited Wall Thickness of Less than Three Inches.State of Il Notified + (ML20151K420)
- ML20151K422 + (ML20151K422)
- ML20151K426 + (ML20151K426)
- ML20151K427 + (ML20151K427)
- ML20151K428 + (ML20151K428)
- ML20151K429 + (ML20151K429)